{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T12:00:52Z","timestamp":1725710452141},"publisher-location":"Berlin, Heidelberg","reference-count":14,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642357572"},{"type":"electronic","value":"9783642357589"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012]]},"DOI":"10.1007\/978-3-642-35758-9_14","type":"book-chapter","created":{"date-parts":[[2012,12,21]],"date-time":"2012-12-21T08:55:54Z","timestamp":1356080154000},"page":"158-169","source":"Crossref","is-referenced-by-count":0,"title":["Manufacturing Process Planning in Set-Based Concurrent Engineering Paradigm"],"prefix":"10.1007","author":[{"given":"Endris","family":"Kerga","sequence":"first","affiliation":[]},{"given":"Marco","family":"Taisch","sequence":"additional","affiliation":[]},{"given":"Sergio","family":"Terzi","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"14_CR1","first-page":"43","volume":"36","author":"A. Ward","year":"1995","unstructured":"Ward, A., Liker, J.K., Cristiano, J.J., Sobek II, D.K.: The Second Toyota Paradox: How De-laying Decisions Can Make Better Cars Faster. Sloan Management Review\u00a036, 43\u201361 (1995)","journal-title":"Sloan Management Review"},{"key":"14_CR2","first-page":"67","volume":"40","author":"D.K. Sobek","year":"1999","unstructured":"Sobek, D.K., Ward, A.C., Liker, J.K.: Toyota\u2019s Principles of Set-Based Concurrent Engineering. Sloan Management Review\u00a040, 67\u201383 (1999)","journal-title":"Sloan Management Review"},{"key":"14_CR3","doi-asserted-by":"crossref","DOI":"10.4324\/9781482293746","volume-title":"The Toyota Product Development System: Integrating People, Process, and Technology","author":"J.M. Morgan","year":"2006","unstructured":"Morgan, J.M., Liker, J.K.: The Toyota Product Development System: Integrating People, Process, and Technology. Productivity Press, New York (2006)"},{"key":"14_CR4","volume-title":"Lean Product and Process Development","author":"A.C. Ward","year":"2007","unstructured":"Ward, A.C., Shook, J., Sobek, D.K.: Lean Product and Process Development. The Lean Enterprise Institute, Cambridge, Massachusetts (2007)"},{"key":"14_CR5","unstructured":"Rossi, M., Kerga, E., Taisch, M., Terzi, S.: Proposal of a method to systematically identify wastes in New Product Development Process. In: IEEE Proceeding of the 7th International Conference on Concurrent Enterprise (ICE 2011), Aachen, Germany, June 20-22 (2011)"},{"key":"14_CR6","unstructured":"Rossi, M., Kerga, E., Taisch, M., Terzi, S.: Lean Product Development: Fact Finding Research in Italy. In: International Conference on Industrial Engineering and Systems Management (IESM) Proceedings, Metz (France), May 25-27 (2011)"},{"key":"14_CR7","doi-asserted-by":"publisher","first-page":"51","DOI":"10.1016\/S0261-3069(03)00159-6","volume":"25","author":"M.F. Ashby","year":"2004","unstructured":"Ashby, M.F., Bre\u2019chetbt, Y.J.M., Cebona, D., Salvoc, L.: Selection strategies for materials and processes. Journal of Materials and Design\u00a025, 51\u201367 (2004)","journal-title":"Journal of Materials and Design"},{"key":"14_CR8","volume-title":"Product Design for Manufacture and Assembly","author":"G. Boothroyd","year":"1994","unstructured":"Boothroyd, G., Dewhurst, P., Knight, W.: Product Design for Manufacture and Assembly. Marcel Dekker Inc., New York (1994)"},{"key":"14_CR9","doi-asserted-by":"publisher","first-page":"392","DOI":"10.1016\/j.rcim.2009.12.002","volume":"26","author":"A. Hassan","year":"2010","unstructured":"Hassan, A., Siadat, A., Dantan, Y., Martin, P.: Conceptual process planning\u2013an improvement approach using QFD,FMEA, and ABC methods. Int. J. of Robotics and Computer-Integrated Manufacturing\u00a026, 392\u2013401 (2010)","journal-title":"Int. J. of Robotics and Computer-Integrated Manufacturing"},{"issue":"8","key":"14_CR10","doi-asserted-by":"publisher","first-page":"595","DOI":"10.1243\/0954405981515879","volume":"212","author":"A.M.K. Esawi","year":"1998","unstructured":"Esawi, A.M.K., Ashby, M.K.: Computer-based selection of manufacturing processes: Methods, software and case studies. J. of Engineering Manufacture\u00a0212(8), 595\u2013610 (1998)","journal-title":"J. of Engineering Manufacture"},{"key":"14_CR11","doi-asserted-by":"publisher","first-page":"605","DOI":"10.1016\/S0261-3069(03)00136-5","volume":"24","author":"A.M.K. Esawi","year":"2004","unstructured":"Esawi, A.M.K., Ashby, M.K.: Cost estimates to guild pre-selection of process. Mater. Design\u00a024, 605\u2013616 (2004)","journal-title":"Mater. Design"},{"key":"14_CR12","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1016\/S0925-5273(00)00179-1","volume":"79","author":"K. Tornberg","year":"2002","unstructured":"Tornberg, K.: Activity-based costing and process modeling for cost-conscious product design: A case study in a manufacturing company. Int. J. of Production Economics\u00a079, 75\u201382 (2002)","journal-title":"Int. J. of Production Economics"},{"key":"14_CR13","doi-asserted-by":"publisher","first-page":"733","DOI":"10.1007\/s00170-003-1618-x","volume":"22","author":"K.S. Chin","year":"2003","unstructured":"Chin, K.S., Zheng, L.Y., Wei, L.: A hybrid rough-cut process planning for quality. Int. J. Adv. Manuf. Technol.\u00a022, 733\u2013743 (2003)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"1","key":"14_CR14","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1108\/14601069810198448","volume":"1","author":"D.M. Ginn","year":"1998","unstructured":"Ginn, D.M., Jones, D.V., Rahnejat, H., Zairi, M.: The QFD\/FMEA interface. Europ. J. Innov. Manage\u00a01(1), 7\u201320 (1998)","journal-title":"Europ. J. Innov. Manage"}],"container-title":["IFIP Advances in Information and Communication Technology","Product Lifecycle Management. Towards Knowledge-Rich Enterprises"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-35758-9_14.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,4]],"date-time":"2021-05-04T13:25:34Z","timestamp":1620134734000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-35758-9_14"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"ISBN":["9783642357572","9783642357589"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-35758-9_14","relation":{},"ISSN":["1868-4238","1861-2288"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1861-2288"}],"subject":[],"published":{"date-parts":[[2012]]}}}