{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T15:24:07Z","timestamp":1743002647895,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":76,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642359651"},{"type":"electronic","value":"9783642359668"}],"license":[{"start":{"date-parts":[[2013,1,1]],"date-time":"2013-01-01T00:00:00Z","timestamp":1356998400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2013,1,1]],"date-time":"2013-01-01T00:00:00Z","timestamp":1356998400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-35966-8_8","type":"book-chapter","created":{"date-parts":[[2013,3,28]],"date-time":"2013-03-28T08:35:38Z","timestamp":1364459738000},"page":"93-112","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":11,"title":["Supply Chain Integration by Human-Centred Alignment of Lean Production Systems"],"prefix":"10.1007","author":[{"given":"Yilmaz","family":"Uygun","sequence":"first","affiliation":[]},{"given":"Natalia","family":"Straub","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,3,29]]},"reference":[{"key":"8_CR1","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1504\/IJVCM.2008.019517","volume":"3","author":"G Anand","year":"2008","unstructured":"Anand G, Kodali R (2008) A conceptual framework for lean supply chain and its implementation. Int J Value Chain Manage 3:313\u2013357","journal-title":"Int J Value Chain Manage"},{"key":"8_CR2","unstructured":"Barthel J, Korge A (2002) Implementierung Ganzheitlicher Produktionssysteme als Aufgabe des Managements\u2014Ergebnisse einer Studie in Brownfield-Werken der Automobilindustrie In: Institut f\u00fcr angewandte Arbeitswissenschaft e.V. (ed) Ganzheitliche Produktionssysteme\u2014Gestaltungsprinzipien und deren Verkn\u00fcpfung. Bachem, K\u00f6ln"},{"key":"8_CR3","volume-title":"Reifegradorientierte Gestaltung von Produktionssystemen. Theoretische und empirische Analyse eines Gestaltungsmodells","author":"G Baumg\u00e4rtner","year":"2006","unstructured":"Baumg\u00e4rtner G (2006) Reifegradorientierte Gestaltung von Produktionssystemen. Theoretische und empirische Analyse eines Gestaltungsmodells. TCW, M\u00fcnchen"},{"key":"8_CR4","unstructured":"Bayerl A (1991) Japanische Unternehmen. Ein Gegenentwurf zum abendl\u00e4ndischen Modell moderner Organisation. Universit\u00e4t Erlangen-N\u00fcrnberg"},{"issue":"14","key":"8_CR5","first-page":"497","volume":"13","author":"K Becker","year":"1992","unstructured":"Becker K (1992) Mit der Lean Production steigt wieder der Inhalt der Arbeit. Arbeitgeber 13(14):497\u2013499","journal-title":"Arbeitgeber"},{"key":"8_CR6","unstructured":"Becker T (2007) Leitbildentwicklung in Kooperationen. In: Becker T (ed) Netzwerkmanagement. Mit Kooperation zum Unternehmenserfolg, 2nd edn. Berlin, Heidelberg"},{"key":"8_CR7","first-page":"152","volume":"3","author":"K Bleicher","year":"1990","unstructured":"Bleicher K (1990) Zukunftsperspektiven organisatorischer Entwicklung. Von strukturellen zu human-zentrierten Ans\u00e4tzen. Zeitschrift f\u00fcr F\u00fchrung\u00a0+\u00a0Organisation 3:152\u2013161","journal-title":"Zeitschrift f\u00fcr F\u00fchrung + Organisation"},{"key":"8_CR8","unstructured":"B\u00f6senberg D, Metzen H (1993) Lean Management. Vorsprung durch schlanke Konzepte, 2nd edn. Moderne Industrie, Landsberg"},{"key":"8_CR9","unstructured":"Br\u00f6dner P (1993) Die R\u00fcckkehr der Arbeit in die Fabrik. In: Doleschal R (ed) Lean Production. Schlanke Produktion. Neues Produktionskonzept humanerer Arbeit? IAT Proceedings, D\u00fcsseldorf"},{"key":"8_CR10","unstructured":"Cottrill K, Gary L (2006) How soft metrics can make hard choices easier. Harvard business review supply chain strategy. Dezember 2005 to Januar 2006, pp 7\u20139"},{"key":"8_CR11","doi-asserted-by":"crossref","unstructured":"Daniel A (2001) Implementierungsmanagement. Ein Anwendungsorientierter Gestaltungsansatz. Dissertation, Universit\u00e4t Hohenheim, Gabler, Wiesbaden","DOI":"10.1007\/978-3-322-89883-8"},{"key":"8_CR12","unstructured":"Dannecker B (1993) Lean Management\u2014Japanisierung oder eigener Weg?\u2014Modifikation und Implementierungsf\u00e4higkeit einer angepassten deutschen Form dieser Managementkonzeption. o. V., Konstanz"},{"key":"8_CR13","volume-title":"Improving the extended value stream. Lean for the entire supply chain","author":"D Dolcemascolo","year":"2006","unstructured":"Dolcemascolo D (2006) Improving the extended value stream. Lean for the entire supply chain. Productivity Press, New York"},{"key":"8_CR14","first-page":"1120","volume":"12","author":"U Dombrowski","year":"2008","unstructured":"Dombrowski U, Zahn T, Grollmann T (2008) Roadmap f\u00fcr die Implementierung Ganzheitlicher Produktionssysteme. Z W F 12:1120\u20131125","journal-title":"Z W F"},{"key":"8_CR15","volume-title":"Personalwirtschaft","author":"H-J Drumm","year":"2008","unstructured":"Drumm H-J (2008) Personalwirtschaft. Springer, Berlin, Heidelberg"},{"key":"8_CR16","volume-title":"Der Weg zum schlanken Unternehmen","author":"W-G Faix","year":"1994","unstructured":"Faix W-G, Buchwald C, Wetzler R (1994) Der Weg zum schlanken Unternehmen. Moderne Industrie, Landsberg"},{"key":"8_CR17","first-page":"157","volume":"3","author":"P Faust","year":"2009","unstructured":"Faust P (2009a) Zweite Lean-Welle\u2014die sieben Thesen. Z W F 3:157\u2013163","journal-title":"Z W F"},{"key":"8_CR18","first-page":"235","volume":"4","author":"P Faust","year":"2009","unstructured":"Faust P (2009b) Lean suply chains. Der Kunde als Taktgeber. Z W F 4:235\u2013241","journal-title":"Z W F"},{"key":"8_CR19","unstructured":"F\u00fcser K (2001) Modernes management. Lean management, business reengineering, benchmarking und viele andere Methoden. Deutscher Taschenbuch, M\u00fcnchen"},{"key":"8_CR20","volume-title":"Supply chains and total product systems a reader","author":"RB Handfield","year":"2006","unstructured":"Handfield RB et al (2006) Avoid the pitfalls in supplier development. In: Rhodes E, Warren J-P, Carter R (eds) Supply chains and total product systems a reader. Blackwell Publishing, Oxford"},{"key":"8_CR21","volume-title":"Industrielles management","author":"K-W Hansmann","year":"1992","unstructured":"Hansmann K-W (1992) Industrielles management. Oldenbourg, M\u00fcnchen Wien"},{"key":"8_CR22","unstructured":"Hartmann D (1992) Lean Management. Beziehung Kunde\/Hersteller. Toyotas Philosophie. In: RKW e. V. (ed) Lean production. Tragweite und Grenzen eines Modells. Tagungsband zum Workshop im Mai 1992, o. V., D\u00fcsseldorf"},{"key":"8_CR23","unstructured":"Hartmann H (2005) Lieferantenbewertung\u2014Lieferantenentwicklung. Kernaufgaben eines gezielten Lieferantenmanagements. WEKA Median, Kissing"},{"key":"8_CR24","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-663-08336-8","volume-title":"Das Menschenbild neuer Organisationsformen. Mitarbeiter und Manager im Unternehmen der Zukunft","author":"G Hesch","year":"1997","unstructured":"Hesch G (1997) Das Menschenbild neuer Organisationsformen. Mitarbeiter und Manager im Unternehmen der Zukunft. Gabler, Wiesbaden"},{"key":"8_CR25","volume-title":"Value stream management. Strategy and excellence in the supply chain","author":"P Hines","year":"2000","unstructured":"Hines P et al (2000) Value stream management. Strategy and excellence in the supply chain. Financial Times, Prentice Hall, Harlow"},{"key":"8_CR26","volume-title":"Lieferantenmanagement. Die Wertorientierte Gestaltung der Lieferbeziehung","author":"G Hofbauer","year":"2009","unstructured":"Hofbauer G, Mashhour T, Fischer M (2009) Lieferantenmanagement. Die Wertorientierte Gestaltung der Lieferbeziehung. Oldenbourg, M\u00fcnchen"},{"key":"8_CR27","unstructured":"Howaldt J, Ellerkmann F (2007) Entwicklungsphasen von Netzwerken und Unternehmenskooperationen. In: Becker T et al (ed) Netzwerkmanagement. Mit Kooperation zum Unternehmenserfolg, 2nd edn. Springer, Berlin Heidelberg"},{"key":"8_CR28","unstructured":"Hungenberg H (2008) Strategisches management. Ziele-Prozesse-Verfahren, 5th edn. Gabler, Wiesbaden"},{"key":"8_CR29","volume-title":"Handbuch der Produktion","author":"R K\u00e4mpf","year":"2007","unstructured":"K\u00e4mpf R (2007) Prozesse. Kontinuierlicher Verbesserungsprozess (KVP). In: Gienke H, K\u00e4mpf R (eds) Handbuch der Produktion. Carl Hanser, M\u00fcnchen"},{"key":"8_CR30","unstructured":"Keidel S (1995) Das Lean Management Konzept. Urspr\u00fcnge\u2014Bestandteile\u2014Auswirkungen. Eine kritische Beurteilung unter normativen Aspekten. Dissertation, Hochschule St. Gallen"},{"key":"8_CR31","unstructured":"Ke\u00dfler S (2008) Entwicklung eines Gestaltungsrahmens f\u00fcr Ganzheitliche Produktionssysteme bei Logistikdienstleistern. Dissertation, Technische Universit\u00e4t Dortmund, Praxiswissen, Dortmund"},{"key":"8_CR32","volume-title":"Organisationstheorien","author":"A Kieser","year":"1993","unstructured":"Kieser A (1993) Managementlehre und Taylorismus. In: Kieser A (ed) Organisationstheorien. W. Kohlhammer, Stuttgart"},{"key":"8_CR33","unstructured":"K\u00f6nig C (2009) Interorganisationale Netzwerke zur kooperativen Optimierung Ganzheitlicher Produktionssysteme. Dissertation, TU Carolo-Wilhelmina, Braunschweig"},{"key":"8_CR34","volume-title":"Lean, leaner\u2026? Die Ver\u00e4nderung des Arbeitsmanagements zwischen Humanisierung und Rationalisierung","author":"R Kopp","year":"1993","unstructured":"Kopp R (1993) Lean control\u2014Die Kontrollform der schlanken Produktion. In: Howaldt J, Minssen H (eds) Lean, leaner\u2026? Die Ver\u00e4nderung des Arbeitsmanagements zwischen Humanisierung und Rationalisierung. Kontania Druck\u2014und Verlagsgesellschaft, Dortmund"},{"key":"8_CR35","unstructured":"Korge A (2003a) Die unternehmensspezifische Ausgestaltung. Von Anforderungen zur L\u00f6sung. Log_X, Stuttgart 2003"},{"key":"8_CR36","unstructured":"Korge A (2003b) Nichts ist so praktisch wie eine gute Theorie. Hintergrundwissen f\u00fcr den Manager. Log_X, Stuttgart"},{"key":"8_CR37","unstructured":"Korge A (2003c) Beginnen Sie, ehe Sie es m\u00fcssen. Ein Produktionssystem implementieren. In: Spath D (ed) Ganzheitlich produzieren-Innovative Organisation und F\u00fchrung. Log_X, Stuttgart"},{"key":"8_CR38","doi-asserted-by":"crossref","unstructured":"Korge A (2005) Die Arbeitskultur f\u00fcr Lean Production gestalten. KVP-Impuls: Ein bew\u00e4hrter Methodenbaukasten zur Messung und Weiterentwicklung der Arbeitskultur. wt Werkstattstechnik online 2:11\u201318","DOI":"10.37544\/1436-4980-2005-1-2-11"},{"key":"8_CR39","doi-asserted-by":"crossref","unstructured":"Korge A, Lentes HP (2009) Ganzheitliche Produktionssysteme. Konzepte, Methoden, Erfolgsfaktoren In: Bullinger HJ (ed) Handbuch Unternehmensorganisation. Strategien, Planung, Umsetzung, 3rd edn. Springer, Berlin, Heidelberg","DOI":"10.1007\/978-3-540-87595-6_9"},{"key":"8_CR40","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1108\/09600039710162277","volume":"1","author":"DR Krause","year":"1997","unstructured":"Krause DR, Elram LM (1997) Success factors in supplier development. Int J Phys Distrib Logistics Manage 1:39\u201358","journal-title":"Int J Phys Distrib Logistics Manage"},{"key":"8_CR41","volume-title":"Wissenschaft und Praxis im dialog. Robuste und sichere Logistiksysteme","author":"A Kuhn","year":"2008","unstructured":"Kuhn A, Uygun Y (2008) Robuste Netzwerke durch kollaborative Anwendung Ganzheitlicher Produktionssysteme. In: Pfohl H-C, Wimmer T (eds) Wissenschaft und Praxis im dialog. Robuste und sichere Logistiksysteme. Deutscher Verkehr, Hamburg"},{"key":"8_CR42","volume-title":"The Toyota way fieldbook: a practical guide for implementing Toyota\u2019s 4Ps","author":"JK Liker","year":"2005","unstructured":"Liker JK, Meier D (2005) The Toyota way fieldbook: a practical guide for implementing Toyota\u2019s 4Ps. McGraw-Hill Professional, New York"},{"key":"8_CR43","volume-title":"Toyota talent: developing your people the Toyota way","author":"JK Liker","year":"2007","unstructured":"Liker JK, Meier D (2007) Toyota talent: developing your people the Toyota way. McGraw-Hill Professional, New York"},{"key":"8_CR44","unstructured":"Liker J-K (2004) The Toyota way. 14 management principles from the World\u2019s greatest manufacturer. McGraw-Hill. New York"},{"key":"8_CR45","volume-title":"Toyota culture. The heart and soul of the Toyota way","author":"J-K Liker","year":"2007","unstructured":"Liker J-K, Hoseus M (2007) Toyota culture. The heart and soul of the Toyota way. McGraw-Hill, New York"},{"key":"8_CR46","doi-asserted-by":"crossref","unstructured":"MacDuffie JP, Helper S (1997) Creating lean suppliers: Diffusing lean production through the supply chain. IMVP Working Papers (W 0165a)","DOI":"10.2307\/41165913"},{"key":"8_CR47","volume-title":"Lean management und Personalentwicklung","author":"HJ M\u00fcller","year":"1995","unstructured":"M\u00fcller HJ (1995) Schl\u00fcsselqualifikation\u2014Die evolution\u00e4re Tiefenstruktur beruflicher Qualifikationen. In: Gei\u00dfler H, Behrmann D, Peterson J (eds) Lean management und Personalentwicklung. Peter, Frankfurt"},{"key":"8_CR48","first-page":"257","volume":"5","author":"O Nell-Breuning","year":"1950","unstructured":"Nell-Breuning O (1950) Der Mensch im Betrieb. Zeitschrift f\u00fcr Betriebswirtschaft 5:257\u2013266","journal-title":"Zeitschrift f\u00fcr Betriebswirtschaft"},{"key":"8_CR49","unstructured":"Oeltjenbruns H (2000) Organisation der Produktion nach dem Vorbild Toyotas. Analyse, Vorteile und detaillierte Voraussetzungen sowie die Vorgehensweise zur erfolgreichen Einf\u00fchrung am Beispiel eines globalen Automobilkonzerns. Dissertation, Technische Universit\u00e4t Clausthal, Innovationen der Fabrikplanung und -organisation, 3rd edn. Shaker, Aachen"},{"key":"8_CR50","volume-title":"Toyota production system\u2014beyond large-scale production","author":"T Ohno","year":"1988","unstructured":"Ohno T (1988) Toyota production system\u2014beyond large-scale production. Productivity Press, New York"},{"key":"8_CR51","doi-asserted-by":"crossref","unstructured":"Pauli M et al (2010) Logistische Lieferantenentwicklung in der Automobilindustrie. Ein heuristischer Ansatz zur Auswahl von logistischen Entwicklungskandidaten. In: Bogaschewsky R et al (ed) Supply management research. Aktuelle Forschungsergebnisse. Gabler, Wiesbaden","DOI":"10.1007\/978-3-8349-8847-8_5"},{"key":"8_CR52","volume-title":"Lean Management","author":"W Pfeiffer","year":"1992","unstructured":"Pfeiffer W, Wei\u00df E (1992) Lean Management. Grundlagen der F\u00fchrung und Organisation industrieller Unternehmen, Erich Schmidt, Berlin"},{"key":"8_CR53","unstructured":"Phelps T, Hoenes T, Smith M (2003) Developing Lean Supply Chains. A Guidebook. Altarum Institute, The Boeing Company and Messier Institute. Discussion Paper. http:\/\/www.newvectors.net\/publications\/pdfs\/esd_LeanSupplyChainGuideBook.pdf. Accessed 17 Mai 2010"},{"key":"8_CR54","first-page":"111","volume":"71","author":"R Rapaport","year":"1993","unstructured":"Rapaport R (1993) To build a winning team: an interview with coach bill walsh. Harvard Bus Rev 71:111\u2013120","journal-title":"Harvard Bus Rev"},{"key":"8_CR55","volume-title":"Change-Management in der Produktion. Prozesse effizient verbessern im Team","author":"H Regber","year":"2007","unstructured":"Regber H, Zimmermann K (2007) Change-Management in der Produktion. Prozesse effizient verbessern im Team. Mi-Fachverlag, Landsberg"},{"key":"8_CR56","volume-title":"Der Mensch als Mittelpunkt einer ganzheitlichen Produktion. Innovative Organisationskonzepte aus betriebswirtschaftlicher Perspektive","author":"R Reichwald","year":"1993","unstructured":"Reichwald R (1993) Der Mensch als Mittelpunkt einer ganzheitlichen Produktion. Innovative Organisationskonzepte aus betriebswirtschaftlicher Perspektive. Gabler, M\u00fcnchen"},{"key":"8_CR57","first-page":"12","volume":"5","author":"R Reichwald","year":"1995","unstructured":"Reichwald R (1995) Der Taylorismus in den K\u00f6pfen der Reengineerer. Office Manage 5:12\u201313","journal-title":"Office Manage"},{"key":"8_CR58","volume-title":"Lean Management und Personalentwicklung","author":"R Reinhardt","year":"1995","unstructured":"Reinhardt R (1995) Lean management lernen. In: Gei\u00dfler H, Behrmann D, Peterson J (eds) Lean Management und Personalentwicklung. Peter, Frankfurt"},{"key":"8_CR59","first-page":"456","volume":"6","author":"M Rei\u00df","year":"1992","unstructured":"Rei\u00df M (1992a) Schlanke Produktion: Prim\u00e4r Personalf\u00fchrung ist gefordert. Personalf\u00fchrung 6:456\u2013461","journal-title":"Personalf\u00fchrung"},{"key":"8_CR60","first-page":"38","volume":"5","author":"M Rei\u00df","year":"1992","unstructured":"Rei\u00df M (1992b) \u201cLean management\u201d ist \u201cheavy management\u201d. Office Manage 5:38\u201341","journal-title":"Office Manage"},{"key":"8_CR61","unstructured":"RIF (2007) Dortmunder Initiative zur rechnerintegrierten Fertigung e.V.: Ganzheitliche Produktionssysteme entlang der Wertsch\u00f6pfungskette. Abschlussbericht, Dortmund"},{"key":"8_CR62","unstructured":"Rivera L et al (2007) Beyond partnerships: the power of lean supply chains. In: Jung H, Chen F, Jeong B (ed) Trends in supply chain design and management. Technologies and methodologies. Springer, London"},{"key":"8_CR63","unstructured":"R\u00f6hrle J (2009) Der Mensch im ganzheitlichen Produktionssystem. In: Bullinger HJ (ed) Handbuch Unternehmensorganisation. Strategien, Planung, Umsetzung, 3rd edn. Springer, Berlin, Heidelberg"},{"key":"8_CR64","volume-title":"Toyota Kata. Managing people for continuous improvement and superior results","author":"M Rother","year":"2009","unstructured":"Rother M (2009) Toyota Kata. Managing people for continuous improvement and superior results. McGraw-Hill Education, New York"},{"key":"8_CR65","doi-asserted-by":"crossref","unstructured":"Rudnitzki J (2002) TANDEM\u2014Die Lieferantenkooperation von DaimlerChrysler. In: Hahn D, Kaufmann L (ed) Handbuch Industrielles Beschaffungsmanagement. Internationale Konzepte\u2014Innovative Instrumente\u2014Aktuelle Praxisbeispiele, 2nd edn. Gabler, Wiesbaden","DOI":"10.1007\/978-3-663-01582-6_32"},{"key":"8_CR66","doi-asserted-by":"crossref","unstructured":"Scharfenberg H (1997) Implementierungsmanagement\u2014effektiv und effizient. In: Nippa M, Scharfenberg H (ed) Implementierungsmanagement. \u00dcber die Kunst, Reengineeringkonzepte erfolgreich umzusetzen. Gabler, Wiesbaden","DOI":"10.1007\/978-3-663-05854-0_1"},{"key":"8_CR67","unstructured":"Schmidt J (1993) Die sanfte organisations-revolution. Von der Hierarchie zu selbststeuernden Systemen. Campus, Frankfurt New York"},{"key":"8_CR68","unstructured":"Schulthei\u00df W (1995) Lean management. Strukturwandel im Industriebetrieb durch Umsetzung des Management-Ansatzes. Expert, Renningen-Malmsheim"},{"issue":"10","key":"8_CR69","first-page":"97","volume":"9","author":"S Spear","year":"1999","unstructured":"Spear S, Bowen H-K (1999a) Decoding the DNA of the Toyota production system. Harvard Bus Rev 9(10):97\u2013106","journal-title":"Harvard Bus Rev"},{"key":"8_CR70","unstructured":"Spear S, Bowen K (1999b) Decoding the DNA of the Toyota production system. Harvard Bus Rev September\/October 1999:96\u2013106"},{"key":"8_CR71","volume-title":"Lean production in der Praxis. Spitzenleistung durch Gruppenarbeit","author":"W St\u00fcrzel","year":"1992","unstructured":"St\u00fcrzel W (1992) Lean production in der Praxis. Spitzenleistung durch Gruppenarbeit. Jufermann, Paderborn"},{"key":"8_CR72","doi-asserted-by":"crossref","unstructured":"Uygun Y, Ke\u00dfler S, Stausberg J (2009) Verbreitung Ganzheitlicher Produktionssysteme. Erkenntnisse aus einer deutschlandweiten Studie. wt Werkstattstechnik online 3:136\u2013140","DOI":"10.37544\/1436-4980-2009-3-136"},{"key":"8_CR73","unstructured":"Uygun Y, Wagner SU (2011) Guidelines for human-based implementation of lean production. In: Proceedings of the 44th CIRP international conference on manufacturing systems"},{"key":"8_CR74","first-page":"39","volume":"7","author":"K Vitasek","year":"2005","unstructured":"Vitasek K, Manrodt KB, Abbott J (2005) What makes a lean supply chain? Supply Chain Manage Rev 7:39\u201345","journal-title":"Supply Chain Manage Rev"},{"key":"8_CR75","first-page":"50","volume":"4","author":"SM Wagner","year":"2003","unstructured":"Wagner SM, Boutellier R (2003) Lieferantenentwicklung in der supply chain\u2014Eine Bestandsaufnahme. Logistik Manage 4:50\u201370","journal-title":"Logistik Manage"},{"key":"8_CR76","volume-title":"Auswahl von Gestaltungsm\u00f6glichkeiten logistischer Schnittstellen in Produktionsnetzwerken mittelgro\u00dfer St\u00fcckgutfertiger unter besonderer Ber\u00fccksichtigung der Zulieferindustrie","author":"M Weidemann","year":"2005","unstructured":"Weidemann M (2005) Auswahl von Gestaltungsm\u00f6glichkeiten logistischer Schnittstellen in Produktionsnetzwerken mittelgro\u00dfer St\u00fcckgutfertiger unter besonderer Ber\u00fccksichtigung der Zulieferindustrie. Shaker, Aachen"}],"container-title":["Lecture Notes in Logistics","Dynamics in Logistics"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-35966-8_8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,13]],"date-time":"2023-02-13T16:43:38Z","timestamp":1676306618000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-642-35966-8_8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642359651","9783642359668"],"references-count":76,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-35966-8_8","relation":{},"ISSN":["2194-8917","2194-8925"],"issn-type":[{"type":"print","value":"2194-8917"},{"type":"electronic","value":"2194-8925"}],"subject":[],"published":{"date-parts":[[2013]]},"assertion":[{"value":"29 March 2013","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}