{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,28]],"date-time":"2025-03-28T03:39:43Z","timestamp":1743133183097,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":15,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642403514"},{"type":"electronic","value":"9783642403521"}],"license":[{"start":{"date-parts":[[2013,1,1]],"date-time":"2013-01-01T00:00:00Z","timestamp":1356998400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-40352-1_44","type":"book-chapter","created":{"date-parts":[[2013,8,8]],"date-time":"2013-08-08T07:42:43Z","timestamp":1375947763000},"page":"350-358","source":"Crossref","is-referenced-by-count":0,"title":["Agent Based Resources Allocation in Job Shop with Re-entrant Features: A Benchmarking Analysis"],"prefix":"10.1007","author":[{"given":"Matteo Mario","family":"Savino","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Antonio","family":"Mazza","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"44_CR1","doi-asserted-by":"crossref","unstructured":"Deng, K., Lin, J., Wang, F.: Scheduling of Re-entrant Line Based on Swarm Intelligence. In: International Symposium on Knowledge Acquisition and Modeling, KAM 2008, pp. 323\u2013328 (2008)","DOI":"10.1109\/KAM.2008.76"},{"issue":"3","key":"44_CR2","first-page":"175","volume":"57","author":"P. Fattahi","year":"2011","unstructured":"Fattahi, P., Tavakoli, N., Jalilvand-Nejad, A., Jolai, F.: A hybrid algo-rithm to solve the problem of re-entrant manufacturing system scheduling. CIRP Journal of Manufacturing Science and Technology\u00a057(3), 175\u2013197 (2011)","journal-title":"CIRP Journal of Manufacturing Science and Technology"},{"key":"44_CR3","unstructured":"Groover, M.P.: Automation, production systems, and computer integrated manufacturing. Prentice Hall of India Pvt. Ltd., New Delhi (2003)"},{"issue":"1","key":"44_CR4","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1080\/002075499191995","volume":"37","author":"E. Kutanoglu","year":"1999","unstructured":"Kutanoglu, E., Sabuncuoglu, I.: An analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research\u00a037(1), 165\u2013187 (1999)","journal-title":"International Journal of Production Research"},{"key":"44_CR5","doi-asserted-by":"crossref","unstructured":"Logenthiran, T., Srinivasan, D., Khambadkone, A.M., Aung, H.N.: Multi-Agent System (MAS) for Short-Term Generation Scheduling of a Microgrid. In: IEEE ICSET, Kandy, Sri Lanka (2010)","DOI":"10.1109\/ICSET.2010.5684943"},{"key":"44_CR6","doi-asserted-by":"crossref","unstructured":"Neubert, G., Savino, M.M.: Flow shop operator scheduling through constraint satisfaction and constraint optimisation techniques. International Journal of Productivity and Quality Management\u00a04(5\/6), 549\u2013568 (2009)","DOI":"10.1504\/IJPQM.2009.025185"},{"key":"44_CR7","unstructured":"Ouzrout, Y., Savino, M.M., Mazza, A.: PLM maturity model: A multi-criteria assessment in southern Italy companies. International Journal of Operations and Quantitative Management\u00a018(3), 160\u201317 (2012)"},{"key":"44_CR8","volume-title":"Planning and scheduling in manufacturing and services","author":"M.L. Pinedo","year":"2005","unstructured":"Pinedo, M.L.: Planning and scheduling in manufacturing and services. Springer, New York (2005)"},{"issue":"2","key":"44_CR9","doi-asserted-by":"publisher","first-page":"132","DOI":"10.1504\/EJIE.2011.039870","volume":"5","author":"M.M. Savino","year":"2011","unstructured":"Savino, M.M., Brun, A., Riccio, C.: Integrated system for mainten-ance and safety management through FMECA principles and fuzzy inference engine. European Journal of Industrial Engineering\u00a05(2), 132\u2013169 (2011)","journal-title":"European Journal of Industrial Engineering"},{"key":"44_CR10","unstructured":"Tan, C.H., Luo, M., Zhao, Y.Z.: Multi-agent approach for dynamic resource allocation. SIMTech technical reports, Singapore (2010)"},{"key":"44_CR11","doi-asserted-by":"crossref","unstructured":"Vinod, Sridharan: Development and analysis of scheduling decision rules for a dynamic flexible job shop production system: a simulation study. International Journal of Business Performance Management\u00a011(1\/2), 43\u201371 (2009)","DOI":"10.1504\/IJBPM.2009.023800"},{"issue":"4","key":"44_CR12","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1504\/IJSOI.2010.037001","volume":"5","author":"M.M. Wong","year":"2010","unstructured":"Wong, M.M., Luo, M., Savino, M.M., Meoli, E.: Dynamic batch scheduling in a continuous cycle-constrained production system. International Journal of Services Operations and Informatics\u00a05(4), 313\u2013329 (2010)","journal-title":"International Journal of Services Operations and Informatics"},{"key":"44_CR13","doi-asserted-by":"crossref","unstructured":"Wang, F., Lin, J.: A Multi-Agent Architecture for Re-entrant Manufac-turing Line. In: IEEE Global Congress on Intelligent Systems, pp. 3\u201310 (2009)","DOI":"10.1109\/GCIS.2009.183"},{"issue":"1\/2","key":"44_CR14","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1504\/IJISTA.2008.016357","volume":"4","author":"Zhou","year":"2008","unstructured":"Zhou, Lee, Nee: Simulating the generic job shop as a multi-agent system. International Journal of Intelligent Systems Technologies and Applications\u00a04(1\/2), 5\u201333 (2008)","journal-title":"International Journal of Intelligent Systems Technologies and Applications"},{"issue":"2, 1","key":"44_CR15","first-page":"336","volume":"167","author":"J. Zoghby","year":"2004","unstructured":"Zoghby, J., Barnes, J., Hasenbein, J.: Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches. European Journal of Operational Research\u00a0167(2, 1), 336\u2013348 (2004)","journal-title":"European Journal of Operational Research"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-40352-1_44","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,16]],"date-time":"2019-05-16T09:47:21Z","timestamp":1558000041000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-40352-1_44"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642403514","9783642403521"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-40352-1_44","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2013]]}}}