{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,15]],"date-time":"2025-10-15T00:36:28Z","timestamp":1760488588846},"publisher-location":"Berlin, Heidelberg","reference-count":14,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642405426"},{"type":"electronic","value":"9783642405433"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-40543-3_19","type":"book-chapter","created":{"date-parts":[[2013,12,7]],"date-time":"2013-12-07T13:31:30Z","timestamp":1386423090000},"page":"172-179","source":"Crossref","is-referenced-by-count":14,"title":["Effective Construction Process Monitoring and Control through a Collaborative Cyber-Physical Approach"],"prefix":"10.1007","author":[{"given":"Yaseen","family":"Srewil","sequence":"first","affiliation":[]},{"given":"Raimar J.","family":"Scherer","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"19_CR1","unstructured":"Gehbauer, F., Z\u00fclch, G., Ott, M., B\u00f6rkircher, M.: Simulation-based analysis of disturbances in construction operations. In: Proceedings of the International Group for Lean Construction 15th Conference (IGLC-15), Michigan (2007)"},{"key":"19_CR2","doi-asserted-by":"publisher","first-page":"292","DOI":"10.1016\/j.autcon.2005.06.004","volume":"15","author":"P.M. Goodrum","year":"2006","unstructured":"Goodrum, P.M., McLaren, M.A., Durfee, A.: The application of active radio frequency identification technology for tool tracking on construction job sites. Autom. Constr.\u00a015, 292\u2013302 (2006)","journal-title":"Autom. Constr."},{"key":"19_CR3","doi-asserted-by":"publisher","first-page":"221","DOI":"10.1061\/(ASCE)0887-3801(2009)23:4(221)","volume":"23","author":"J. Won-Suk","year":"2009","unstructured":"Won-Suk, J., Skibniewski, M.J.: Embedded system for construction asset tracking combining Radio and Ultrasound signals. In J. Comput. Civil Eng.\u00a023, 221\u2013229 (2009)","journal-title":"In J. Comput. Civil Eng."},{"key":"19_CR4","unstructured":"Klaubert, C., Schorr, M., G\u00fcnthner, W.: Real time construction progress control using NFC. In: Proceedings of the Systech 2010, Ciudad Real, Spain (2010)"},{"key":"19_CR5","doi-asserted-by":"crossref","unstructured":"El-Omari, S., Moselhi, O.: Integrating automated data acquisition technologies for progress reporting of construction projects. In: Proc. of 26th ISARC, Austin, TX (2009)","DOI":"10.22260\/ISARC2009\/0048"},{"issue":"1","key":"19_CR6","doi-asserted-by":"publisher","first-page":"88","DOI":"10.1016\/j.autcon.2010.07.001","volume":"20","author":"R. Azimi","year":"2011","unstructured":"Azimi, R., Lee, S., AbouRizk, S., Alvanchi, A.: A Framework for Automated and Integrated Project Monitoring and Control System for Steel Fabrication Projects. Autom. Constr.\u00a020(1), 88\u201397 (2011)","journal-title":"Autom. Constr."},{"key":"19_CR7","unstructured":"Kadolsky, M., Srewil, Y., Scherer, R.J.: Knowledge-based on site process optimization using RFID technology. In: Proceedings of 28th CIB W78 and 6th CIB W102 2011 International Conference. Biot \u2013 Sophia Antipolis, France (2011)"},{"key":"19_CR8","doi-asserted-by":"crossref","unstructured":"Akanmu, A., Anumba, C., Messner, J.: An RTLS-Based Approach to Cyber-Physical Systems Integration in Design and Construction. International Journal of Distributed Sensor Networks\u00a02012, Article ID 596845, 11 (2012)","DOI":"10.1155\/2012\/596845"},{"key":"19_CR9","unstructured":"Srewil, Y., Kadolsky, M., Scherer, R.J.: Integrating RFID Technology in Dynamic Construction Process Planning. In: Proc. Joint 29th CIB W78, Beirut, Lebanon (2012)"},{"key":"19_CR10","unstructured":"Erabuild: RFID in construction. ERABUILD final report (2006)"},{"key":"19_CR11","doi-asserted-by":"crossref","unstructured":"Li, Z., Chu, C.-H., Yao, W.: SIP-RLTS: An RFID Location Tracking System Based on SIP. In: 2008 IEEE International Conference on RFID, pp. 173\u2013182 (2008)","DOI":"10.1109\/RFID.2008.4519357"},{"key":"19_CR12","unstructured":"PMBOK Guide: A guide to the project management body of knowledge. Project Management Institute (PMI), Pennsylvania, USA (2004)"},{"key":"19_CR13","unstructured":"Sharmak, W.: Dynamic Network planning in construction projects using configurable reference process models. PhD thesis: Berichte des Instituts f\u00fcr Bauinformatik, Heft 9, Dresden, Germany (2011) ISBN 978-3-86780-228-4"},{"key":"19_CR14","series-title":"IFIP AICT","doi-asserted-by":"publisher","first-page":"341","DOI":"10.1007\/978-3-642-23330-2_38","volume-title":"Adaptation and Value Creating Collaborative Networks","author":"R. Scherer","year":"2011","unstructured":"Scherer, R., Sharmak, W.: Process risk management using configurable process models. In: Camarinha-Matos, L.M., Pereira-Klen, A., Afsarmanesh, H. (eds.) PRO-VE 2011. IFIP AICT, vol.\u00a0362, pp. 341\u2013348. Springer, Heidelberg (2011)"}],"container-title":["IFIP Advances in Information and Communication Technology","Collaborative Systems for Reindustrialization"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-40543-3_19","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,25]],"date-time":"2019-05-25T08:45:09Z","timestamp":1558773909000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-40543-3_19"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642405426","9783642405433"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-40543-3_19","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2013]]}}}