{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,8]],"date-time":"2024-09-08T02:28:28Z","timestamp":1725762508204},"publisher-location":"Berlin, Heidelberg","reference-count":23,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642405426"},{"type":"electronic","value":"9783642405433"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-40543-3_23","type":"book-chapter","created":{"date-parts":[[2013,12,7]],"date-time":"2013-12-07T08:31:30Z","timestamp":1386405090000},"page":"211-219","source":"Crossref","is-referenced-by-count":0,"title":["Reference Model for Operation and Reconfiguration of a Network for Subway Construction"],"prefix":"10.1007","author":[{"given":"Larissa","family":"Ara\u00fajo","sequence":"first","affiliation":[]},{"given":"F\u00e1bio M\u00fcller","family":"Guerrini","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"23_CR1","doi-asserted-by":"publisher","first-page":"84","DOI":"10.1016\/j.autcon.2005.02.008","volume":"15","author":"S.H. Lee","year":"2006","unstructured":"Lee, S.H., Pe\u00f1a-Mora, F., Park, M.: Dynamic planning and control methodology for strategic and operational construction project management. Automation in Construction\u00a015, 84\u201397 (2006)","journal-title":"Automation in Construction"},{"issue":"3","key":"23_CR2","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1108\/14714170910973501","volume":"9","author":"M.E.J. Rutten","year":"2009","unstructured":"Rutten, M.E.J., Dor\u00e9e, A.G., Halman, J.I.M.: Innovation and interorganizational cooperation: a synthesis of literature. Construction Innovation\u00a09(3), 285\u2013297 (2009)","journal-title":"Construction Innovation"},{"key":"23_CR3","doi-asserted-by":"publisher","first-page":"782","DOI":"10.1061\/(ASCE)0733-9364(2009)135:8(782)","volume":"135","author":"H. Yu","year":"2009","unstructured":"Yu, H., Tweed, T., Al-Hussein, M., Nasseri, R.: Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management\u00a0135, 782\u2013790 (2009)","journal-title":"Journal of Construction Engineering and Management"},{"key":"23_CR4","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1108\/17410400910921065","volume":"58","author":"K. Tanskanen","year":"2009","unstructured":"Tanskanen, K., Holmstr\u00f6m, J., Elfving, J., Talvite, U.: Vendor-managed-inventory (VMI) in construction. Int. Journal of Productivity and Performance Management\u00a058, 29\u201340 (2009)","journal-title":"Int. Journal of Productivity and Performance Management"},{"key":"23_CR5","unstructured":"Keller, M., Scherer, R.J., Menzel, K., Theling, T., Vanderhaeghen, D., Loos, P.: Support of collaborative business process networks. In: AEC, ITcon. 11, Special Issue Process Modelling, Process Management and Collaboration, pp. 449\u2013465 (2006)"},{"key":"23_CR6","doi-asserted-by":"publisher","first-page":"439","DOI":"10.1007\/s10845-005-1656-3","volume":"16","author":"L. Camarinha-Matos","year":"2005","unstructured":"Camarinha-Matos, L., Afsarmanesh, H.: Collaborative networks: a new scientific discipline. J. Intelligent Manufacturing\u00a016, 439\u2013452 (2005)","journal-title":"J. Intelligent Manufacturing"},{"key":"23_CR7","doi-asserted-by":"publisher","first-page":"2453","DOI":"10.1080\/00207540701737666","volume":"46","author":"L. Camarinha-Matos","year":"2008","unstructured":"Camarinha-Matos, L., Afsarmanesh, H.: On reference models for collaborative network organizations. Journal of Production Research\u00a046, 2453\u20132569 (2008)","journal-title":"Journal of Production Research"},{"key":"23_CR8","doi-asserted-by":"publisher","first-page":"96","DOI":"10.1016\/j.intcom.2006.07.002","volume":"19","author":"Y. Rezgui","year":"2007","unstructured":"Rezgui, Y.: Exploring virtual team-working effectiveness in the construction sector. Interacting with Computers\u00a019, 96\u2013112 (2007)","journal-title":"Interacting with Computers"},{"key":"23_CR9","doi-asserted-by":"publisher","first-page":"142","DOI":"10.1016\/j.autcon.2009.11.016","volume":"19","author":"C. Vorakulpipat","year":"2010","unstructured":"Vorakulpipat, C., Rezgui, Y., Hopfe, C.J.: Value creating construction virtual teams: A case study in the construction sector. Automation in Construction\u00a019, 142\u2013147 (2010)","journal-title":"Automation in Construction"},{"issue":"1","key":"23_CR10","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1139\/l06-119","volume":"34","author":"M.M. Rahman","year":"2007","unstructured":"Rahman, M.M., Kumaraswamy, M.M., Ling, F.Y.Y.: Building a relational contracting culture and integrated teams. Canadian J. of Civil Engineering\u00a034(1), 75\u201388 (2007)","journal-title":"Canadian J. of Civil Engineering"},{"key":"23_CR11","doi-asserted-by":"publisher","first-page":"592","DOI":"10.1080\/09537280701546880","volume":"18","author":"L. Camarinha-Matos","year":"2007","unstructured":"Camarinha-Matos, L., Abreu, A.: Performance indicators for collaborative networks based on collaboration benefits. Production Planning & Control\u00a018, 592\u2013609 (2007)","journal-title":"Production Planning & Control"},{"key":"23_CR12","doi-asserted-by":"publisher","first-page":"428","DOI":"10.1016\/j.autcon.2005.06.011","volume":"15","author":"H. Verheij","year":"2006","unstructured":"Verheij, H., Augenbroe, G.: Collaborative planning of AEC projects and partnerships. Automation in Construction\u00a015, 428\u2013437 (2006)","journal-title":"Automation in Construction"},{"key":"23_CR13","doi-asserted-by":"publisher","first-page":"894","DOI":"10.1016\/j.autcon.2009.03.015","volume":"18","author":"B. Dave","year":"2009","unstructured":"Dave, B., Koskela, L.: Collaborative knowledge management \u2013 A construction case study. Automation in Construction\u00a018, 894\u2013902 (2009)","journal-title":"Automation in Construction"},{"key":"23_CR14","doi-asserted-by":"publisher","first-page":"785","DOI":"10.1016\/j.autcon.2005.10.014","volume":"15","author":"M.Y. Cheng","year":"2006","unstructured":"Cheng, M.Y., Tsai, M.H., Xiao, Z.W.: Construction management process reengineering: Organizational HR planning for multiple projects. Aut. in Construction\u00a015, 785\u2013799 (2006)","journal-title":"Aut. in Construction"},{"key":"23_CR15","doi-asserted-by":"publisher","first-page":"601","DOI":"10.1016\/j.ijproman.2007.03.001","volume":"25","author":"P.X.W. Zou","year":"2007","unstructured":"Zou, P.X.W., Zhang, G., Wang, J.: Understanding the key risks in construction projects in China. International Journal of Project Management\u00a025, 601\u2013614 (2007)","journal-title":"International Journal of Project Management"},{"key":"23_CR16","doi-asserted-by":"crossref","unstructured":"Landesmann, M., Scazzieri, R.: Production and economic dynamics. Cambridge Press (1996)","DOI":"10.1017\/CBO9780511628450"},{"key":"23_CR17","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/S0166-3615(03)00033-2","volume":"51","author":"L. Camarinha-Matos","year":"2003","unstructured":"Camarinha-Matos, L., Afsarmanesh, H.: Elements of a base VE infrastructure. Journal of Computers in Industry\u00a051, 139\u2013163 (2003)","journal-title":"Journal of Computers in Industry"},{"key":"23_CR18","volume-title":"The Agile Virtual Enterprise: Cases, Metrics, Tools","author":"H.T. Goranson","year":"1999","unstructured":"Goranson, H.T.: The Agile Virtual Enterprise: Cases, Metrics, Tools. Quorum Books, Westport (1999)"},{"key":"23_CR19","volume-title":"Enterprise Modeling and Integration: Principles and Applications","author":"F.B. Vernadat","year":"1996","unstructured":"Vernadat, F.B.: Enterprise Modeling and Integration: Principles and Applications. Chapman & Hall, London (1996)"},{"key":"23_CR20","doi-asserted-by":"crossref","first-page":"77","DOI":"10.4018\/978-1-59904-054-7.ch004","volume-title":"Reference Modeling for Business Systems Analysis","author":"F. Ahlemann","year":"2007","unstructured":"Ahlemann, F., Gastl, H.: Process model for an Empirically Grounded Reference Model Construction. In: Fettke, P., Loos, P. (eds.) Reference Modeling for Business Systems Analysis, pp. 77\u201397. Idea Group Publishing, Hershey (2007)"},{"issue":"2","key":"23_CR21","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1016\/S0950-5849(02)00162-3","volume":"45","author":"S. Nurcan","year":"2003","unstructured":"Nurcan, S., Rolland, C.: A multi-method for defining the organizational change. Information and Software Technology\u00a045(2), 61\u201382 (2003)","journal-title":"Information and Software Technology"},{"key":"23_CR22","volume-title":"EKD User guide. Department of Computer and Systems Sciences","author":"J.A. Bubenko Jr.","year":"2001","unstructured":"Bubenko Jr., J.A., Brash, D., Stirna, J.: EKD User guide. Department of Computer and Systems Sciences. Royal Institute of Technology, Stockholm (2001)"},{"key":"23_CR23","volume-title":"Case study research: Design and methods","author":"R.K. Yin","year":"2003","unstructured":"Yin, R.K.: Case study research: Design and methods, 3rd edn. Sage, California (2003)","edition":"3"}],"container-title":["IFIP Advances in Information and Communication Technology","Collaborative Systems for Reindustrialization"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-40543-3_23","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,25]],"date-time":"2019-05-25T04:37:07Z","timestamp":1558759027000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-40543-3_23"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642405426","9783642405433"],"references-count":23,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-40543-3_23","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2013]]}}}