{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T22:04:08Z","timestamp":1725746648843},"publisher-location":"Berlin, Heidelberg","reference-count":15,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642408397"},{"type":"electronic","value":"9783642408403"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-40840-3_32","type":"book-chapter","created":{"date-parts":[[2013,8,30]],"date-time":"2013-08-30T09:48:45Z","timestamp":1377856125000},"page":"221-226","source":"Crossref","is-referenced-by-count":4,"title":["Application of Collaborative Mobile System in AR-Based Visualization, Data Storage and Manipulation"],"prefix":"10.1007","author":[{"given":"Xiangyu","family":"Wang","sequence":"first","affiliation":[]},{"given":"Martijn","family":"Truijens","sequence":"additional","affiliation":[]},{"given":"Lei","family":"Hou","sequence":"additional","affiliation":[]},{"given":"Ying","family":"Wang","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"32_CR1","unstructured":"Eastman, C., Teicholz, P., Sacks, R., Liston, K.: BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. Wiley (2011)"},{"issue":"3","key":"32_CR2","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1016\/0926-5805(92)90014-B","volume":"1","author":"G. Nederveen Van","year":"1992","unstructured":"Van Nederveen, G., Tolman, F.: Modelling multiple views on buildings. Automation in Construction\u00a01(3), 215\u2013224 (1992)","journal-title":"Automation in Construction"},{"issue":"2","key":"32_CR3","doi-asserted-by":"publisher","first-page":"69","DOI":"10.1061\/(ASCE)0742-597X(2009)25:2(69)","volume":"25","author":"J.E. Taylor","year":"2009","unstructured":"Taylor, J.E., Bernstein, P.G.: Paradigm trajectories of building information modeling practice in project networks. Journal of Management in Engineering\u00a025(2), 69\u201376 (2009)","journal-title":"Journal of Management in Engineering"},{"issue":"2","key":"32_CR4","doi-asserted-by":"publisher","first-page":"126","DOI":"10.1016\/j.autcon.2010.09.010","volume":"20","author":"Y. Jung","year":"2011","unstructured":"Jung, Y., Joo, M.: Building information modelling (BIM) framework for practical implementation. Automation in Construction\u00a020(2), 126\u2013133 (2011)","journal-title":"Automation in Construction"},{"issue":"2","key":"32_CR5","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1007\/s00366-006-0053-7","volume":"23","author":"C. Treeck van","year":"2007","unstructured":"van Treeck, C., Rank, E.: Dimensional reduction of 3D building models using graph theory and its application in building energy simulation. Engineering with Computers\u00a023(2), 109\u2013122 (2007)","journal-title":"Engineering with Computers"},{"issue":"2","key":"32_CR6","doi-asserted-by":"publisher","first-page":"153","DOI":"10.1016\/j.autcon.2008.07.003","volume":"18","author":"A. Schlueter","year":"2009","unstructured":"Schlueter, A., Thesseling, F.: Building information model based energy\/exergy performance assessment in early design stages. Automation in Construction\u00a018(2), 153\u2013163 (2009)","journal-title":"Automation in Construction"},{"issue":"2","key":"32_CR7","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1016\/j.autcon.2008.08.001","volume":"18","author":"A. Russell","year":"2009","unstructured":"Russell, A., Staub-French, S., Tran, N., Wong, W.: Visualizing high-rise building construction strategies using linear scheduling and 4D CAD. Automation in Construction\u00a018(2), 219\u2013236 (2009)","journal-title":"Automation in Construction"},{"issue":"3","key":"32_CR8","doi-asserted-by":"publisher","first-page":"347","DOI":"10.1016\/j.autcon.2009.12.009","volume":"19","author":"C.W. Feng","year":"2010","unstructured":"Feng, C.W., Chen, Y.J., Huang, J.R.: Using the MD CAD model to develop the time\u2013cost integrated schedule for construction projects. Automation in Construction\u00a019(3), 347\u2013356 (2010)","journal-title":"Automation in Construction"},{"key":"32_CR9","doi-asserted-by":"crossref","unstructured":"Wang, X., Love, P.: BIM+, A.R Onsite information sharing and communication via advanced visualization. In: Computer Supported Cooperative Work in Design (CSCWD), pp. 850\u2013855 (2012)","DOI":"10.1109\/CSCWD.2012.6221920"},{"key":"32_CR10","doi-asserted-by":"crossref","unstructured":"Hou, L., Wang, X.: Experimental Framework for Evaluating Cognitive Workload of Using AR System for General Assembly Task. Paper Presented at the Proceedings of the 28th International Symposium on Automation and Robotics in Construction (2011)","DOI":"10.22260\/ISARC2011\/0117"},{"key":"32_CR11","unstructured":"Dong, S., Kamat, V.: Resolving incorrect visual occlusion in outdoor Augmented Reality using TOF camera and OpenGL frame buffer. Paper Presented at the Proceedings of International Conference on Construction Applications of Virtual Reality, Sendai, Japan (2010)"},{"key":"32_CR12","doi-asserted-by":"crossref","unstructured":"Golparvar-Fard, M., Savarese, S., Pena-Mora, F.: Interactive visual construction progress monitoring with D4AR-4D augmented reality-models. Paper Presented at the Construction Research Congress (2009)","DOI":"10.1061\/41020(339)5"},{"key":"32_CR13","doi-asserted-by":"crossref","unstructured":"Gu, N., Singh, V., Wang, X.: Applying augmented reality for data interaction and collaboration in BIM| NOVA. The University of Newcastle\u2019s Digital Repository (2010)","DOI":"10.52842\/conf.caadria.2010.511"},{"issue":"2","key":"32_CR14","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1260\/147807709788921985","volume":"7","author":"X. Wang","year":"2009","unstructured":"Wang, X.: Augmented reality in architecture and design: potentials and challenges for application. International Journal of Architectural Computing\u00a07(2), 309\u2013326 (2009)","journal-title":"International Journal of Architectural Computing"},{"issue":"5","key":"32_CR15","doi-asserted-by":"publisher","first-page":"539","DOI":"10.1016\/j.autcon.2009.11.005","volume":"19","author":"N.\u010c. Babi\u010d","year":"2010","unstructured":"Babi\u010d, N.\u010c., Podbreznik, P., Rebolj, D.: Integrating resource production and construction using BIM. Automation in Construction\u00a019(5), 539\u2013543 (2010)","journal-title":"Automation in Construction"}],"container-title":["Lecture Notes in Computer Science","Cooperative Design, Visualization, and Engineering"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-40840-3_32","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,7,4]],"date-time":"2023-07-04T05:58:23Z","timestamp":1688450303000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-40840-3_32"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642408397","9783642408403"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-40840-3_32","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2013]]}}}