{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T22:52:07Z","timestamp":1725749527160},"publisher-location":"Berlin, Heidelberg","reference-count":25,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642409240"},{"type":"electronic","value":"9783642409257"}],"license":[{"start":{"date-parts":[[2013,1,1]],"date-time":"2013-01-01T00:00:00Z","timestamp":1356998400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-40925-7_47","type":"book-chapter","created":{"date-parts":[[2013,9,19]],"date-time":"2013-09-19T15:54:58Z","timestamp":1379606098000},"page":"511-522","source":"Crossref","is-referenced-by-count":11,"title":["A Disruption Recovery Model in a Production-Inventory System with Demand Uncertainty and Process Reliability"],"prefix":"10.1007","author":[{"given":"Sanjoy Kumar","family":"Paul","sequence":"first","affiliation":[]},{"given":"Ruhul","family":"Sarker","sequence":"additional","affiliation":[]},{"given":"Daryl","family":"Essam","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"1","key":"47_CR1","doi-asserted-by":"publisher","first-page":"50","DOI":"10.1287\/msom.1.1.50","volume":"1","author":"S.C. Graves","year":"1999","unstructured":"Graves, S.C.: A single-item inventory model for a nonstationary demand process. Manufacturing & Service Operations Management\u00a01(1), 50\u201361 (1999)","journal-title":"Manufacturing & Service Operations Management"},{"issue":"4","key":"47_CR2","doi-asserted-by":"publisher","first-page":"507","DOI":"10.1002\/1520-6750(198908)36:4<507::AID-NAV3220360412>3.0.CO;2-N","volume":"36","author":"U.. Dave","year":"2006","unstructured":"Dave, U.: A deterministic lot\u2010size inventory model with shortages and a linear trend in demand. Naval Research Logistics\u00a036(4), 507\u2013514 (2006)","journal-title":"Naval Research Logistics"},{"issue":"3","key":"47_CR3","doi-asserted-by":"publisher","first-page":"529","DOI":"10.1016\/S0377-2217(02)00256-4","volume":"146","author":"G.H. Chan","year":"2003","unstructured":"Chan, G.H., Song, Y.: A dynamic analysis of the single-item periodic stochastic inventory system with order capacity. European Journal of Operational Research\u00a0146(3), 529\u2013542 (2003)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"47_CR4","doi-asserted-by":"publisher","first-page":"280","DOI":"10.1016\/j.ijpe.2010.03.019","volume":"133","author":"G.P. Kiesm\u00fcller","year":"2011","unstructured":"Kiesm\u00fcller, G.P., De Kok, A.G., Dabia, S.: Single item inventory control under periodic review and a minimum order quantity. International Journal of Production Economics\u00a0133(1), 280\u2013285 (2011)","journal-title":"International Journal of Production Economics"},{"issue":"7","key":"47_CR5","doi-asserted-by":"publisher","first-page":"920","DOI":"10.1016\/j.mcm.2005.12.013","volume":"43","author":"G.C. Lin","year":"2006","unstructured":"Lin, G.C., Gong, D.C.: On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time. Mathematical and Computer Modelling\u00a043(7), 920\u2013932 (2006)","journal-title":"Mathematical and Computer Modelling"},{"issue":"7","key":"47_CR6","doi-asserted-by":"publisher","first-page":"3495","DOI":"10.1016\/j.apm.2011.01.006","volume":"35","author":"G.A. Widyadana","year":"2011","unstructured":"Widyadana, G.A., Wee, H.M.: Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time. Applied Mathematical Modelling\u00a035(7), 3495\u20133508 (2011)","journal-title":"Applied Mathematical Modelling"},{"issue":"3","key":"47_CR7","doi-asserted-by":"publisher","first-page":"464","DOI":"10.1016\/j.ejor.2012.05.033","volume":"222","author":"H. Hishamuddin","year":"2012","unstructured":"Hishamuddin, H., Sarker, R.A., Essam, D.: A disruption recovery model for a single stage production-inventory system. European Journal of Operational Research\u00a0222(3), 464\u2013473 (2012)","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"47_CR8","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1016\/j.cie.2012.11.012","volume":"64","author":"H. Hishamuddin","year":"2013","unstructured":"Hishamuddin, H., Sarker, R.A., Essam, D.: A Recovery Model for a Two\u2013Echelon Serial Supply Chain with Consideration of Transportation Disruption. Computers & Industrial Engineering\u00a064(2), 552\u2013561 (2013)","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"47_CR9","doi-asserted-by":"publisher","first-page":"191","DOI":"10.1002\/(SICI)1520-6750(199603)43:2<191::AID-NAV3>3.0.CO;2-5","volume":"43","author":"M. Parlar","year":"1998","unstructured":"Parlar, M., Perry, D.: Inventory models of future supply uncertainty with single and multiple suppliers. Naval Research Logistics\u00a043(2), 191\u2013210 (1998)","journal-title":"Naval Research Logistics"},{"key":"47_CR10","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1023\/A:1018937420735","volume":"91","author":"S. \u00d6zekici","year":"1999","unstructured":"\u00d6zekici, S., Parlar, M.: Inventory models with unreliable suppliers in a random environment. Annals of Operations Research\u00a091, 123\u2013136 (1999)","journal-title":"Annals of Operations Research"},{"issue":"2","key":"47_CR11","doi-asserted-by":"publisher","first-page":"755","DOI":"10.1016\/j.ijpe.2008.03.009","volume":"114","author":"E. Mohebbi","year":"2008","unstructured":"Mohebbi, E., Hao, D.: An inventory model with non-resuming randomly interruptible lead time. International Journal of Production Economics\u00a0114(2), 755\u2013768 (2008)","journal-title":"International Journal of Production Economics"},{"issue":"5","key":"47_CR12","doi-asserted-by":"publisher","first-page":"516","DOI":"10.1111\/j.1937-5956.2009.01026.x","volume":"18","author":"L. Qi","year":"2009","unstructured":"Qi, L., Shen, Z.J.M., Snyder, L.V.: A continuous\u2010review inventory model with disruptions at both supplier and retailer. Production and Operations Management\u00a018(5), 516\u2013532 (2009)","journal-title":"Production and Operations Management"},{"issue":"2","key":"47_CR13","doi-asserted-by":"publisher","first-page":"174","DOI":"10.1016\/0377-2217(89)90190-2","volume":"39","author":"T.C.E. Cheng","year":"1989","unstructured":"Cheng, T.C.E.: An economic production quantity model with flexibility and reliability considerations. European Journal of Operational Research\u00a039(2), 174\u2013179 (1989)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"47_CR14","doi-asserted-by":"publisher","first-page":"411","DOI":"10.1016\/j.cie.2008.07.001","volume":"56","author":"S. Bag","year":"2009","unstructured":"Bag, S., Chakraborty, D., Roy, A.R.: A production inventory model with fuzzy random demand and with flexibility and reliability considerations. Computers & Industrial Engineering\u00a056(1), 411\u2013416 (2009)","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"47_CR15","doi-asserted-by":"publisher","first-page":"451","DOI":"10.1016\/j.ejor.2009.01.041","volume":"200","author":"S.S. Sana","year":"2010","unstructured":"Sana, S.S.: A production\u2013inventory model in an imperfect production process. European Journal of Operational Research\u00a0200(2), 451\u2013464 (2010)","journal-title":"European Journal of Operational Research"},{"issue":"9","key":"47_CR16","doi-asserted-by":"publisher","first-page":"4881","DOI":"10.1016\/j.amc.2011.10.053","volume":"218","author":"B. Sarkar","year":"2012","unstructured":"Sarkar, B.: An inventory model with reliability in an imperfect production process. Applied Mathematics and Computation\u00a0218(9), 4881\u20134891 (2012)","journal-title":"Applied Mathematics and Computation"},{"issue":"1","key":"47_CR17","doi-asserted-by":"publisher","first-page":"203","DOI":"10.1016\/S0377-2217(97)00200-2","volume":"109","author":"H.M. Lee","year":"1998","unstructured":"Lee, H.M., Yao, J.S.: Economic production quantity for fuzzy demand quantity, and fuzzy production quantity. European Journal of Operational Research\u00a0109(1), 203\u2013211 (1998)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"47_CR18","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/S0165-0114(97)00350-3","volume":"107","author":"S.C. Chang","year":"1999","unstructured":"Chang, S.C.: Fuzzy production inventory for fuzzy product quantity with triangular fuzzy number. Fuzzy Sets and Systems\u00a0107(1), 37\u201357 (1999)","journal-title":"Fuzzy Sets and Systems"},{"issue":"10","key":"47_CR19","doi-asserted-by":"publisher","first-page":"935","DOI":"10.1016\/S0305-0548(99)00068-4","volume":"27","author":"J.S. Yao","year":"2000","unstructured":"Yao, J.S., Chang, S.C., Su, J.S.: Fuzzy inventory without backorder for fuzzy order quantity and fuzzy total demand quantity. Computers & Operations Research\u00a027(10), 935\u2013962 (2000)","journal-title":"Computers & Operations Research"},{"issue":"8","key":"47_CR20","doi-asserted-by":"publisher","first-page":"915","DOI":"10.1016\/j.mcm.2004.08.007","volume":"41","author":"P. Dutta","year":"2005","unstructured":"Dutta, P., Chakraborty, D., Roy, A.R.: A single-period inventory model with fuzzy random variable demand. Mathematical and Computer Modelling\u00a041(8), 915\u2013922 (2005)","journal-title":"Mathematical and Computer Modelling"},{"issue":"2","key":"47_CR21","doi-asserted-by":"publisher","first-page":"326","DOI":"10.1016\/j.amc.2006.05.198","volume":"184","author":"S. Islam","year":"2007","unstructured":"Islam, S., Roy, T.K.: Fuzzy multi-item economic production quantity model under space constraint: A geometric programming approach. Applied Mathematics and Computation\u00a0184(2), 326\u2013335 (2007)","journal-title":"Applied Mathematics and Computation"},{"issue":"4","key":"47_CR22","doi-asserted-by":"publisher","first-page":"711","DOI":"10.1016\/S0360-8352(00)00006-1","volume":"37","author":"R.A. Sarker","year":"1999","unstructured":"Sarker, R.A., Khan, L.R.: An optimal batch size for a production system operating under periodic delivery policy. Computers & Industrial Engineering\u00a037(4), 711\u2013730 (1999)","journal-title":"Computers & Industrial Engineering"},{"key":"47_CR23","doi-asserted-by":"crossref","unstructured":"Paul, S.K., Azeem, A., Sarker, R., Essam, D.: Development of a production inventory model with uncertainty and reliability considerations. Optimization & Engineering, Accepted manuscript (2013), doi:10.1007\/s11081-013-9218-6","DOI":"10.1007\/s11081-013-9218-6"},{"issue":"2","key":"47_CR24","first-page":"1","volume":"5","author":"S.H. Chen","year":"1999","unstructured":"Chen, S.H., Hsieh, C.H.: Graded mean integration representation of generalized fuzzy number. Journal of Chinese Fuzzy Systems\u00a05(2), 1\u20137 (1999)","journal-title":"Journal of Chinese Fuzzy Systems"},{"issue":"4","key":"47_CR25","doi-asserted-by":"publisher","first-page":"242","DOI":"10.1177\/003754979406200405","volume":"62","author":"A. Homaifar","year":"1994","unstructured":"Homaifar, A., Qi, C.X., Lai, S.H.: Constrained optimization via genetic algorithms. Simulation\u00a062(4), 242\u2013253 (1994)","journal-title":"Simulation"}],"container-title":["Lecture Notes in Computer Science","Computer Information Systems and Industrial Management"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-40925-7_47","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,17]],"date-time":"2019-05-17T11:57:53Z","timestamp":1558094273000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-40925-7_47"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642409240","9783642409257"],"references-count":25,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-40925-7_47","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2013]]}}}