{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,12]],"date-time":"2026-11-12T05:45:27Z","timestamp":1794462327662,"version":"4.9.1"},"publisher-location":"Berlin, Heidelberg","reference-count":29,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642415005","type":"print"},{"value":"9783642415012","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-41501-2_59","type":"book-chapter","created":{"date-parts":[[2013,11,8]],"date-time":"2013-11-08T10:39:27Z","timestamp":1383907167000},"page":"596-605","source":"Crossref","is-referenced-by-count":6,"title":["Characteristics of Green BIM: Process and Information Management Requirements"],"prefix":"10.1007","author":[{"given":"Shalini","family":"Gandhi","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Julie Rose","family":"Jupp","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"issue":"1","key":"59_CR1","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1080\/01446190802558923","volume":"27","author":"L. Hossain","year":"2009","unstructured":"Hossain, L.: Communications and coordination in construction projects. Construction Management and Economics\u00a027(1), 25\u201339 (2009)","journal-title":"Construction Management and Economics"},{"key":"59_CR2","volume-title":"Green BIM","author":"E. Kriegel","year":"2008","unstructured":"Kriegel, E., Nies, B.: Green BIM. Wiley Publishing, Indianapolis (2008)"},{"key":"59_CR3","doi-asserted-by":"publisher","first-page":"513","DOI":"10.1201\/b12516-82","volume-title":"eWork and eBusiness in Architecture, Engineering and Construction","author":"R. Lavikka","year":"2012","unstructured":"Lavikka, R., Smeds, M., Smeds, R.: Towards coordinated BIM based design and construction process. In: Gudnason, Scherer (eds.) eWork and eBusiness in Architecture, Engineering and Construction, pp. 513\u2013520. Taylor & Francis Group, London (2012)"},{"key":"59_CR4","unstructured":"Eastman, C., et al.: BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors (2011)"},{"issue":"1","key":"59_CR5","first-page":"27","volume":"4","author":"S. Azhar","year":"2010","unstructured":"Azhar, S.: BIM for sustainable design: results of an industry survey. Journal of Building Information Modeling\u00a04(1), 27\u201328 (2010)","journal-title":"Journal of Building Information Modeling"},{"key":"59_CR6","volume-title":"37th Annual Conference of Australasian University Building Educators Association (AUBEA)","author":"J. Jupp","year":"2012","unstructured":"Jupp, J., Gandhi, S.: Clarifying the role of Building Information Modelling in Green Building Certification. In: 37th Annual Conference of Australasian University Building Educators Association (AUBEA). University of New South Wales, Sydney (2012)"},{"key":"59_CR7","doi-asserted-by":"crossref","unstructured":"Kiviniemi, A.: The Effects of Integrated BIM in Processes and Business Models. Distributed Intelligence in Design, 123\u2013135 (2011)","DOI":"10.1002\/9781444392395.ch9"},{"key":"59_CR8","unstructured":"McLennan, J.F.: The philosophy of sustainable design: The future of architecture. Ecotone Publishing (2004)"},{"key":"59_CR9","unstructured":"GBCA. Green Building Council Australia, Certification Process (December 2010) (2012)"},{"key":"59_CR10","unstructured":"USGBC. US Green Building Council, What LEED 2011 (2011)"},{"issue":"2","key":"59_CR11","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1016\/j.autcon.2010.09.019","volume":"20","author":"S. Azhar","year":"2011","unstructured":"Azhar, S., et al.: Building information modeling for sustainable design and LEED\u00ae rating analysis. Automation in Construction\u00a020(2), 217\u2013224 (2011)","journal-title":"Automation in Construction"},{"issue":"3","key":"59_CR12","doi-asserted-by":"publisher","first-page":"357","DOI":"10.1016\/j.autcon.2008.10.003","volume":"18","author":"B. Succar","year":"2009","unstructured":"Succar, B.: Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction\u00a018(3), 357\u2013375 (2009)","journal-title":"Automation in Construction"},{"key":"59_CR13","unstructured":"BEDP. Issues Paper: Australian Council of Built Environment Design Professions BEDP (September 2007)"},{"issue":"3","key":"59_CR14","first-page":"101","volume":"10","author":"B. Sodagar","year":"2008","unstructured":"Sodagar, B., Fieldson, R.: Towards a sustainable construction practice. Construction Information Quarterly\u00a010(3), 101\u2013108 (2008)","journal-title":"Construction Information Quarterly"},{"issue":"3","key":"59_CR15","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1080\/09613218.2011.561948","volume":"39","author":"T. H\u00e4kkinen","year":"2011","unstructured":"H\u00e4kkinen, T., Belloni, K.: Barriers and drivers for sustainable building. Building Research & Information\u00a039(3), 239\u2013255 (2011)","journal-title":"Building Research & Information"},{"key":"59_CR16","unstructured":"GBCA. Green Building Council Australia, Certification Process (December 2010)"},{"key":"59_CR17","unstructured":"AIA. Integrated Project Delivery: A Guide. version 1 (2007)"},{"issue":"2","key":"59_CR18","doi-asserted-by":"publisher","first-page":"121","DOI":"10.3763\/aedm.2008.0072","volume":"4","author":"A. Otter den","year":"2008","unstructured":"den Otter, A., Emmitt, S.: Design team communication and design task complexity: The preference for dialogues. Architectural Engineering and Design Management\u00a04(2), 121\u2013129 (2008)","journal-title":"Architectural Engineering and Design Management"},{"key":"59_CR19","unstructured":"NATSPEC. NATSPEC Construction Information \u2013 NATSPEC National BIM guide v.10 (2011)"},{"issue":"1","key":"59_CR20","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1080\/17452007.2007.9684626","volume":"3","author":"P. Tzortzopoulos-Fazenda","year":"2007","unstructured":"Tzortzopoulos-Fazenda, P., Cooper, R.: Design management from a contractor\u2019s perspective: The need for clarity. Architectural Engineering and Design Management\u00a03(1), 17\u201328 (2007)","journal-title":"Architectural Engineering and Design Management"},{"key":"59_CR21","unstructured":"Toth, B., et al.: Sky high and back again: the evolution of simulation-based design from aerospace to construction. IBPSA Australasia and AIRAH (2011)"},{"key":"59_CR22","unstructured":"Rohracher, H.: Technology Analysis and Strategic Management (2001)"},{"key":"59_CR23","unstructured":"Luthra, A.: Implementation of Building Information Modeling in Architectural Firms in India (2010)"},{"key":"59_CR24","unstructured":"ACG, A., Productivity in the buildings network: assessing the impacts of Building Information Models, report to the Built Environment Innovation and Industry Council: Sydney, Australia (2010)"},{"key":"59_CR25","unstructured":"AEC. AEC UK BIM Standard - A practical and pragmatic BIM standard for the Architectural, Engineering and Construction industry in the UK (2009)"},{"key":"59_CR26","unstructured":"NASFA, et al.: Integrated Project Delivery for Public and Private Owners (2010)"},{"key":"59_CR27","unstructured":"VABIMGuide. Department of Veterans Affairs \u2013 The VA BIM Guide, V.1.0 (2010)"},{"key":"59_CR28","unstructured":"London, K., et al.: Building information modelling project decision support framework. Association of Researchers in Construction Management, ARCOM (2008)"},{"key":"59_CR29","unstructured":"Volker, L., Prins, M.: Exploring the possibilities of correlating management with value in architectural design. In: Proceedings of CIB W096 Architectural Management. Lyngby, Denmark, pp. 8\u201313 (2005)"}],"container-title":["IFIP Advances in Information and Communication Technology","Product Lifecycle Management for Society"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-41501-2_59","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,24]],"date-time":"2019-05-24T00:06:59Z","timestamp":1558656419000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-41501-2_59"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642415005","9783642415012"],"references-count":29,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-41501-2_59","relation":{"is-part-of":[{"id-type":"doi","id":"https:\/\/doi.org\/10.1007\/978-3-642-41501-2","asserted-by":"object"}]},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013]]}}}