{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,12]],"date-time":"2026-11-12T05:43:40Z","timestamp":1794462220147,"version":"4.9.1"},"publisher-location":"Berlin, Heidelberg","reference-count":28,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642415005","type":"print"},{"value":"9783642415012","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-41501-2_60","type":"book-chapter","created":{"date-parts":[[2013,11,8]],"date-time":"2013-11-08T10:39:27Z","timestamp":1383907167000},"page":"606-618","source":"Crossref","is-referenced-by-count":8,"title":["Developing a Building Information Modelling Educational Framework for the Tertiary Sector in New Zealand"],"prefix":"10.1007","author":[{"given":"Garry","family":"Miller","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Shubham","family":"Sharma","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Claire","family":"Donald","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Robert","family":"Amor","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"key":"60_CR1","unstructured":"Autodesk, Transitioning to BIM (2007), http:\/\/static.ziftsolutions.com\/files\/8a7c9fef2693aa1e0126d28c29d806ac"},{"key":"60_CR2","unstructured":"Bernstein, P.: Integrated Practice: It\u2019s not just about the technology. The American Institute of Architects (2005), http:\/\/info.aia.org\/aiarchitect\/thisweek05\/tw0930\/tw0930bp_notjusttech.cfm (accessed October 31, 2012)"},{"key":"60_CR3","doi-asserted-by":"publisher","first-page":"347","DOI":"10.1007\/BF00138871","volume":"32","author":"J. Biggs","year":"1996","unstructured":"Biggs, J.: Enhancing teaching through constructive alignment. Higher Education\u00a032, 347\u2013364 (1996)","journal-title":"Higher Education"},{"issue":"2","key":"60_CR4","first-page":"104","volume":"2","author":"A. Blake","year":"2008","unstructured":"Blake, A., Doherty, I.: An Instructional Design Course for Clinical Educators: First Iteration Design Research Reflections. Journal of Learning Design\u00a02(2), 104\u2013115 (2008)","journal-title":"Journal of Learning Design"},{"issue":"1","key":"60_CR5","doi-asserted-by":"publisher","first-page":"32","DOI":"10.3102\/0013189X018001032","volume":"18","author":"J. Brown","year":"1989","unstructured":"Brown, J., Collins, A., Duguid, P.: Situated cognition and the culture of learning. Educational Researcher\u00a018(1), 32\u201342 (1989)","journal-title":"Educational Researcher"},{"key":"60_CR6","unstructured":"Dick, W., Carey, L., Carey, J.: The systematic design of instruction. Pearson (2005)"},{"key":"60_CR7","doi-asserted-by":"publisher","first-page":"517","DOI":"10.1061\/(ASCE)0733-9364(2008)134:7(517)","volume":"134","author":"C.M. Eastman","year":"2008","unstructured":"Eastman, C.M., Sacks, R.: Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities. Journal of Construction Engineering and Management\u00a0134, 517\u2013526 (2008)","journal-title":"Journal of Construction Engineering and Management"},{"key":"60_CR8","doi-asserted-by":"publisher","DOI":"10.1002\/9780470261309","volume-title":"BIM handbook: A guide to building information modeling for owners, managers, architects, engineers, contractors and fabricators","author":"C.M. Eastman","year":"2008","unstructured":"Eastman, C.M., Teicholz, P., Sacks, R., Liston, K.: BIM handbook: A guide to building information modeling for owners, managers, architects, engineers, contractors and fabricators. John Wiley and Sons, Hoboken (2008)"},{"key":"60_CR9","unstructured":"Gier, D.: Does learning building information modeling improve the plan reading skills of construction management students? (2007), http:\/\/ascpro0.ascweb.org\/archives\/2007\/CEUE146002007.pdf"},{"key":"60_CR10","unstructured":"Gledson, B., Henry, D., Bleanch, P.: Does Size Matter? Experiences and Perspectives of BIM Implementation From Large and Sme Construction Contractors. In: 1st UK Academic Conference on Building Information Management (BIM), Northumbria University, Newcastle upon Tyne, UK (2012)"},{"key":"60_CR11","volume-title":"A guide to authentic learning","author":"J. Herrington","year":"2010","unstructured":"Herrington, J., Reeves, T., Oliver, R.: A guide to authentic learning. Routledge, New York (2010)"},{"key":"60_CR12","unstructured":"Huber, R.: New Zealand National BIM Survey 2012. Masterspec - Construction Information Ltd. (2012)"},{"key":"60_CR13","unstructured":"Jayasena, H.S., Weddikkara, C.: Building Information Modelling for Sri Lankan Construction Industry (2012), http:\/\/www.academia.edu\/1772647\/Building_Information_Modelling_for_Sri_Lankan_Construction_Industry"},{"key":"60_CR14","unstructured":"Kane, C.: Productivity Roadmap. Building and Construction Sector Productivity Partnership (2012)"},{"key":"60_CR15","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1080\/08956308.1998.11671182","volume":"41","author":"D.H. Lester","year":"1998","unstructured":"Lester, D.H.: Critical success factors for new product development. Research Technology Management\u00a041, 36\u201343 (1998)","journal-title":"Research Technology Management"},{"key":"60_CR16","unstructured":"Mom, M.: On Decision-making and Technology Implementing Factors for BIM Adoption (2011), http:\/\/www.academia.edu\/894660\/On_Decision-making_and_Technology-implementing_Factors_for_BIM_Adoption"},{"key":"60_CR17","unstructured":"National Institute of Building Sciences 2007, NIST, National building information modeling standard. Version 1 - Part 1: Overview, principles and methodologies (2007)"},{"key":"60_CR18","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1109\/TEM.1987.6498856","volume":"34","author":"J.K. Pinto","year":"1987","unstructured":"Pinto, J.K., Slevin, D.P.: Critical Factors in Successful Project Implementation. IEEE Transactions on Engineering Management EM-34, 22\u201327 (1987)","journal-title":"IEEE Transactions on Engineering Management EM-"},{"key":"60_CR19","unstructured":"Sebastian, R., Haak, W., Vos, E.: BIM application for integrated design and engineering in small-scale housing development: a pilot project in The Netherlands. In: Proceedings of International Symposium CIB-W096 Future Trends in Architectural Management, Tainan, Taiwan, November 2-3 (2009)"},{"key":"60_CR20","first-page":"381","volume":"12","author":"S. Staub-French","year":"2007","unstructured":"Staub-French, S., Khanzode, A.: 3D and 4D modeling for design and construction coordination: issues and lessons learned. ITcon\u00a012, 381\u2013407 (2007)","journal-title":"ITcon"},{"key":"60_CR21","doi-asserted-by":"publisher","first-page":"357","DOI":"10.1016\/j.autcon.2008.10.003","volume":"18","author":"B. Succar","year":"2009","unstructured":"Succar, B.: Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction\u00a018, 357\u2013375 (2009)","journal-title":"Automation in Construction"},{"key":"60_CR22","unstructured":"Times Higher Education, World University Rankings (2012), http:\/\/www.timeshighereducation.co.uk\/world-university-rankings\/2012-13\/subject-ranking\/subject\/engineering-and-IT (accessed December 9, 2012)"},{"key":"60_CR23","volume-title":"Designing Courses for Higher Education","author":"S. Toohey","year":"1999","unstructured":"Toohey, S.: Designing Courses for Higher Education. Open University Press, Philadelphia (1999)"},{"key":"60_CR24","doi-asserted-by":"crossref","first-page":"66","DOI":"10.14424\/ijcscm201012-66-79","volume":"2","author":"V. Tran","year":"2012","unstructured":"Tran, V., Tookey, J.E., Roberti, J.: Shaving BIM: Establishing a Framework for Future BIM Research in New Zealand. International Journal of Construction Supply Chain Management\u00a02, 66\u201379 (2012)","journal-title":"International Journal of Construction Supply Chain Management"},{"key":"60_CR25","unstructured":"Wong, K.A., Wong, K.F., Nadeem, A.: Building information modelling for tertiary construction education in Hong Kong. ITcon (2011)"},{"key":"60_CR26","unstructured":"Woo, J.H.: BIM (Building Information Modeling) and Pedagogical Challenges. In: Proceedings of the 43rd Annual Conference by Associated Schools of Construction (2007)"},{"key":"60_CR27","doi-asserted-by":"crossref","unstructured":"Zhang, L., Lee, M.K.O., Zhang, Z., Banerjee, P.: Critical success factors of enterprise resource planning systems implementation success in China. In: Proceedings of the 36th Annual Hawaii International Conference on System Sciences, 10 p. IEEE (2003)","DOI":"10.1109\/HICSS.2003.1174613"},{"key":"60_CR28","doi-asserted-by":"crossref","unstructured":"Zhang, Y., Guangbin, W.: Cooperation between Building Information Modeling and Integrated Project Delivery Method Leads to Paradigm Shift of AEC Industry. In: Management and Service Science, September 20-22, pp. 1\u20134 (2009)","DOI":"10.1109\/ICMSS.2009.5305337"}],"container-title":["IFIP Advances in Information and Communication Technology","Product Lifecycle Management for Society"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-41501-2_60","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,4,30]],"date-time":"2025-04-30T15:57:21Z","timestamp":1746028641000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-41501-2_60"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642415005","9783642415012"],"references-count":28,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-41501-2_60","relation":{"is-part-of":[{"id-type":"doi","id":"https:\/\/doi.org\/10.1007\/978-3-642-41501-2","asserted-by":"object"}]},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013]]}}}