{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,12]],"date-time":"2026-11-12T05:45:18Z","timestamp":1794462318161,"version":"4.9.1"},"publisher-location":"Berlin, Heidelberg","reference-count":40,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642415005","type":"print"},{"value":"9783642415012","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-41501-2_61","type":"book-chapter","created":{"date-parts":[[2013,11,8]],"date-time":"2013-11-08T10:39:27Z","timestamp":1383907167000},"page":"619-629","source":"Crossref","is-referenced-by-count":11,"title":["Building Information Modeling (BIM) and the Construction Management Body of Knowledge"],"prefix":"10.1007","author":[{"given":"Mehmet","family":"Yalcinkaya","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"David","family":"Arditi","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"issue":"12","key":"61_CR1","doi-asserted-by":"publisher","first-page":"1370","DOI":"10.1061\/(ASCE)CO.1943-7862.0000115","volume":"135","author":"A. Arditi","year":"2009","unstructured":"Arditi, A., Ongkasuwan, D.: Duties and responsibilities of construction managers: perception of parties involved in construction. Journal of Construction Engineering and Management\u00a0135(12), 1370\u20131374 (2009)","journal-title":"Journal of Construction Engineering and Management"},{"key":"61_CR2","unstructured":"Fisher, M., Kunz J.: The scope and role of information technology in construction (2004), \n                    \n                      http:\/\/cife.stanford.edu\/online.publications\/TR156.pdf\n                    \n                    \n                   (retrieved August 25, 2010)"},{"key":"61_CR3","unstructured":"National Institute of Building and Science (NIBS) National building information modelling standards. Facilities information council national BIM standards, Washington, DC (2007)"},{"key":"61_CR4","unstructured":"Haltenhoff, C.E.: The CM contracting system, ch. 9, pp. 128\u2013140. Prentice Hall (1998)"},{"issue":"1","key":"61_CR5","first-page":"243","volume":"17","author":"S. Staub-Frenc","year":"2003","unstructured":"Staub-Frenc, S., Fischer, M., Kunz, J., Paulson, B.: A generic feature driven activity-based cost estimation process. Advanced Engineering Informatics\u00a017(1), 243\u2013254 (2003)","journal-title":"Advanced Engineering Informatics"},{"issue":"3","key":"61_CR6","doi-asserted-by":"publisher","first-page":"413","DOI":"10.1016\/j.cie.2004.01.004","volume":"46","author":"H.A. Gabbar","year":"2004","unstructured":"Gabbar, H.A., Aoyama, A., Naka, Y.: Model-based computer-aided design environment for operational design. Computers and Industrial Engineering\u00a046(3), 413\u2013430 (2004)","journal-title":"Computers and Industrial Engineering"},{"issue":"3","key":"61_CR7","doi-asserted-by":"publisher","first-page":"294","DOI":"10.1016\/j.autcon.2008.09.004","volume":"18","author":"X. Zhang","year":"2009","unstructured":"Zhang, X., Bakis, N., Lukins, T.C., Ibrahim, Y.M., Wu, S., Kagioglu, M., Aouad, G., Kaka, A.P., Trucco, E.: Automating progress measurement of construction projects. Automation in Construction\u00a018(3), 294\u2013301 (2009)","journal-title":"Automation in Construction"},{"key":"61_CR8","first-page":"176","volume-title":"BIM and construction management. Proven tools, methods, and workflows","author":"B. Hardin","year":"2009","unstructured":"Hardin, B.: BIM and construction management. Proven tools, methods, and workflows, pp. 176\u2013177. Wiley Publishing Inc., Indianapolis (2009)"},{"issue":"3","key":"61_CR9","doi-asserted-by":"publisher","first-page":"357","DOI":"10.1016\/j.autcon.2009.12.005","volume":"19","author":"V. Popov","year":"2010","unstructured":"Popov, V., Juocevicius, V., Migilinskas, D., Ustinovichius, L., Mikalauskas, S.: The use of a virtual building design and construction model for developing an effective project in 5D environment. Automation in Construction\u00a019(3), 357\u2013367 (2010)","journal-title":"Automation in Construction"},{"key":"61_CR10","unstructured":"AIA, American Institute of Architects Contract documents, Integrated project delivery (IPD) family (2008), \n                    \n                      http:\/\/www.aia.org\/contractdocs\/AIAS076706\n                    \n                    \n                   (retrieved August 23, 2010)"},{"key":"61_CR11","doi-asserted-by":"crossref","unstructured":"Underwood, J., Isikdag, U.: Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies. IGI Global (2010)","DOI":"10.4018\/978-1-60566-928-1"},{"key":"61_CR12","doi-asserted-by":"publisher","first-page":"651","DOI":"10.1016\/S0926-5805(98)00110-1","volume":"8","author":"A.N. Baldwin","year":"1999","unstructured":"Baldwin, A.N., Thorpe, A., Carter, C.: The use of electronic information exchange on construction alliance projects. Automation in Construction\u00a08, 651\u2013662 (1999)","journal-title":"Automation in Construction"},{"issue":"12","key":"61_CR13","doi-asserted-by":"publisher","first-page":"1328","DOI":"10.1061\/(ASCE)0733-9364(2005)131:12(1328)","volume":"131","author":"R. Navon","year":"2005","unstructured":"Navon, R., Berkovich, O.: Development and On-Site Evaluation of an Automated Materials Management and Control Model. Journal of Construction Engineering and Management\u00a0131(12), 1328\u20131336 (2005)","journal-title":"Journal of Construction Engineering and Management"},{"key":"61_CR14","volume-title":"Project management for construction, Fundamental concepts for owners, engineers, architects and builders","author":"C. Hendrickson","year":"2008","unstructured":"Hendrickson, C.: Project management for construction, Fundamental concepts for owners, engineers, architects and builders. Prentice Hall Publishing, Pitsburg (2008)"},{"issue":"2","key":"61_CR15","doi-asserted-by":"publisher","first-page":"148","DOI":"10.1016\/j.autcon.2009.11.015","volume":"19","author":"A. Mahalingham","year":"2010","unstructured":"Mahalingham, A., Kashyap, R., Mahajan, C.: An evaluation of the applicability of 4D CAD on construction projects. Automation in Construction\u00a019(2), 148\u2013159 (2010)","journal-title":"Automation in Construction"},{"key":"61_CR16","doi-asserted-by":"crossref","unstructured":"Zhang, J., Anson, M., Wang, Q.: A new 4D management approach to construction planning and site space utilization. In: 8th International Conference on Computing in Civil and Building Engineering, ASCE. Stanford University, California, pp. 14\u201317 (2000)","DOI":"10.1061\/40513(279)3"},{"key":"61_CR17","unstructured":"Akinci, B., Fischer, M., Kunz, J., Levitt, R.: Representing Work Spaces Generically in Construction Method Models. Working Paper #57. CIFE, Stanford University (2000)"},{"key":"61_CR18","unstructured":"Dawood, N., Scott, D., Sriprasert, E., Mallasi, Z.: The virtual construction site (VIRCON) tools: an industrial evaluation. Journal of Information Technology in Construction, 43\u201354 (2005)"},{"key":"61_CR19","unstructured":"Sriprasert, E., Dawood, N.: Genetic algorithms for multi-constraint scheduling: an application for the construction industry. In: Proceedings of CIB w78 Conference 2003, Auckland, New Zealand (2003)"},{"issue":"8","key":"61_CR20","doi-asserted-by":"publisher","first-page":"1045","DOI":"10.1016\/j.autcon.2009.05.006","volume":"18","author":"A.D. Russel","year":"2009","unstructured":"Russel, A.D., Chiu, C.Y., Korde, T.: Visual representation of construction management data. Automation in Construction\u00a018(8), 1045\u20131062 (2009)","journal-title":"Automation in Construction"},{"key":"61_CR21","first-page":"147","volume-title":"ASCE International Conference on Computing in Civil Engineering","author":"K. Song","year":"2005","unstructured":"Song, K., Pollalis, S.N., Pena-Mora, F.: Project dashboard: concurrent visual representation method of project metrics on 3D building models. In: ASCE International Conference on Computing in Civil Engineering, pp. 147\u2013153. American Society of Civil Engineers, Reston (2005)"},{"key":"61_CR22","unstructured":"Project Management Institute (PMI) Construction extention to a guide to the project management body of knowledge. Project Management Institute, Newtown Square, Pennsylvania (2000)"},{"issue":"10","key":"61_CR23","doi-asserted-by":"publisher","first-page":"776","DOI":"10.1061\/(ASCE)0733-9364(2008)134:10(776)","volume":"134","author":"T. Hartman","year":"2008","unstructured":"Hartman, T., Gao, J., Fischer, M.: Areas of application for 3D and 4D models on construction projects. Journal of Construction Engineering and Management\u00a0134(10), 776\u2013785 (2008)","journal-title":"Journal of Construction Engineering and Management"},{"issue":"4","key":"61_CR24","doi-asserted-by":"publisher","first-page":"443","DOI":"10.1016\/j.aei.2006.03.001","volume":"20","author":"I.K. Brilakis","year":"2006","unstructured":"Brilakis, I.K., Soibelman, L., Shinagawa, Y.: Construction site image retrieval based on material cluster recognition. Advanced Engineering Informatics\u00a020(4), 443\u2013452 (2006)","journal-title":"Advanced Engineering Informatics"},{"issue":"4","key":"61_CR25","doi-asserted-by":"publisher","first-page":"254","DOI":"10.1111\/1467-8667.00315","volume":"18","author":"H. Kim","year":"2003","unstructured":"Kim, H., Haas, C.T., Rauch, A.F.: 3D image segmentation of aggregates from laser profiling. Computer Aided Civil Infrastructure Engineering\u00a018(4), 254\u2013263 (2003)","journal-title":"Computer Aided Civil Infrastructure Engineering"},{"issue":"2","key":"61_CR26","doi-asserted-by":"publisher","first-page":"124","DOI":"10.1016\/j.autcon.2005.01.008","volume":"15","author":"B. Akinci","year":"2006","unstructured":"Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., Park, K.: A formalism for utilization of sensor systems and integrated project models for active construction quality control. Automation in Construction\u00a015(2), 124\u2013138 (2006)","journal-title":"Automation in Construction"},{"issue":"5","key":"61_CR27","doi-asserted-by":"publisher","first-page":"539","DOI":"10.1016\/j.autcon.2009.11.005","volume":"19","author":"N.C. Babic","year":"2010","unstructured":"Babic, N.C., Podbreznik, P., Rebolj, D.: Integrating resource production and construction using BIM. Automation in Construction\u00a019(5), 539\u2013543 (2010)","journal-title":"Automation in Construction"},{"issue":"5","key":"61_CR28","doi-asserted-by":"publisher","first-page":"575","DOI":"10.1016\/j.autcon.2004.04.003","volume":"13","author":"H.J. Wang","year":"2004","unstructured":"Wang, H.J., Zhang, J.P., Chau, K.W., Anson, M.: 4D dynamic management for construction planning and resource utilization. Automation in Construction\u00a013(5), 575\u2013589 (2004)","journal-title":"Automation in Construction"},{"issue":"3","key":"61_CR29","doi-asserted-by":"publisher","first-page":"342","DOI":"10.1016\/j.autcon.2007.05.012","volume":"17","author":"S.H. Han","year":"2008","unstructured":"Han, S.H., Kim, D.Y., Kim, H., Jang, W.S.: A web-based integrated system for international project risk management. Automation in Construction\u00a017(3), 342\u2013356 (2008)","journal-title":"Automation in Construction"},{"key":"61_CR30","unstructured":"Sulavinki, K., Kahkonen, K., Makela T., Kiviniemi, M.: 4D-BIM for construction safety planning (2010), \n                    \n                      www.cib2010.org\/post\/files\/papers\/1167.pdf\n                    \n                    \n                   (retrieved August 24, 2010)"},{"issue":"5","key":"61_CR31","doi-asserted-by":"publisher","first-page":"539","DOI":"10.1016\/S0360-1323(01)00056-7","volume":"37","author":"O.A. Jannadi","year":"2002","unstructured":"Jannadi, O.A., Bu-Khamsin, M.S.: Safety factors considered by industrial contractors in Saudi Arabia. Building and Environment\u00a037(5), 539\u2013547 (2002)","journal-title":"Building and Environment"},{"key":"61_CR32","unstructured":"Alshawi, M., Goulding, J., Nadim, W.: Training and education for open building manufacturing: Closing the skills gap. ManuBuild in collaboration with VTT \u2013 Technical Research Centre of Finland, Finland (2007)"},{"issue":"3","key":"61_CR33","first-page":"395","volume":"48","author":"B. Vacharapoom","year":"2009","unstructured":"Vacharapoom, B., Sdhabbon, B.: An integrated safety management with construction management using 4D CAD model. Safety Science\u00a048(3), 395\u2013403 (2009)","journal-title":"Safety Science"},{"key":"61_CR34","doi-asserted-by":"publisher","first-page":"266","DOI":"10.1016\/S1007-0214(08)70160-3","volume":"13","author":"Z. Hu","year":"2008","unstructured":"Hu, Z., Zhang, J., Deng, Z.: Construction process simulation and safety analysis based on building information modeling and 4D technology. Tsingua Science and Technology\u00a013, 266\u2013272 (2008)","journal-title":"Tsingua Science and Technology"},{"issue":"4","key":"61_CR35","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1061\/(ASCE)0733-9364(2000)126:4(251)","volume":"126","author":"B. Koo","year":"2000","unstructured":"Koo, B., Fischer, M.: Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management\u00a0126(4), 251\u2013260 (2000)","journal-title":"Journal of Construction Engineering and Management"},{"issue":"3","key":"61_CR36","doi-asserted-by":"publisher","first-page":"347","DOI":"10.1016\/j.autcon.2009.12.009","volume":"19","author":"C.W. Feng","year":"2010","unstructured":"Feng, C.W., Chen, Y.J., Huang, J.H.: Using the MD CAD model to develop the time-cost integrated schedule for construction projects. Automation in Construction\u00a019(3), 347\u2013356 (2010)","journal-title":"Automation in Construction"},{"issue":"2","key":"61_CR37","doi-asserted-by":"publisher","first-page":"189","DOI":"10.1016\/j.autcon.2006.04.001","volume":"16","author":"B. Koo","year":"2007","unstructured":"Koo, B., Fischer, M., Kunz, J.: A formal identidication and re-sequencing process of location-based scheduling and 4D CAD. Automation in Construction\u00a016(2), 189\u2013198 (2007)","journal-title":"Automation in Construction"},{"issue":"5","key":"61_CR38","doi-asserted-by":"publisher","first-page":"557","DOI":"10.1016\/S0926-5805(01)00066-8","volume":"11","author":"N. Dawood","year":"2002","unstructured":"Dawood, N., Akinsola, A., Hobbs, B.: Development of automated communicated of system for managing site information using internet technology. Automation in Construction\u00a011(5), 557\u2013572 (2002)","journal-title":"Automation in Construction"},{"issue":"4","key":"61_CR39","doi-asserted-by":"publisher","first-page":"512","DOI":"10.1016\/j.autcon.2004.11.002","volume":"14","author":"K.W. Chau","year":"2005","unstructured":"Chau, K.W., Anson, M., Zhang, J.P.: 4D dynamic construction management and visualization software: 1. Development. Automation in Construction\u00a014(4), 512\u2013514 (2005)","journal-title":"Automation in Construction"},{"key":"61_CR40","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"242","DOI":"10.1007\/11863649_30","volume-title":"Cooperative Design, Visualization, and Engineering","author":"D. Migilinskas","year":"2006","unstructured":"Migilinskas, D., Ustinovichius, L.: Computer-aided modeling, evaluation and management of construction projects according to PLM concept. In: Luo, Y. (ed.) CDVE 2006. LNCS, vol.\u00a04101, pp. 242\u2013250. Springer, Heidelberg (2006)"}],"container-title":["IFIP Advances in Information and Communication Technology","Product Lifecycle Management for Society"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-41501-2_61","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,23]],"date-time":"2019-05-23T23:56:10Z","timestamp":1558655770000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-41501-2_61"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642415005","9783642415012"],"references-count":40,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-41501-2_61","relation":{"is-part-of":[{"id-type":"doi","id":"https:\/\/doi.org\/10.1007\/978-3-642-41501-2","asserted-by":"object"}]},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013]]}}}