{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,12]],"date-time":"2026-11-12T05:38:54Z","timestamp":1794461934698,"version":"4.9.1"},"publisher-location":"Berlin, Heidelberg","reference-count":24,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642415005","type":"print"},{"value":"9783642415012","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-41501-2_62","type":"book-chapter","created":{"date-parts":[[2013,11,8]],"date-time":"2013-11-08T10:39:27Z","timestamp":1383907167000},"page":"630-640","source":"Crossref","is-referenced-by-count":15,"title":["Incomplete BIM Implementation: Exploring Challenges and the Role of Product Lifecycle Management Functions"],"prefix":"10.1007","author":[{"given":"Julie Rose","family":"Jupp","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"key":"62_CR1","doi-asserted-by":"publisher","first-page":"357","DOI":"10.1016\/j.autcon.2008.10.003","volume":"18","author":"B. Succar","year":"2009","unstructured":"Succar, B.: Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction\u00a018, 357\u2013375 (2009)","journal-title":"Automation in Construction"},{"key":"62_CR2","doi-asserted-by":"publisher","DOI":"10.1002\/9780470261309","volume-title":"BIM Handbook: A Guide to Building Information Modeling, for Owners, Managers, Designers, Engineers, and Contractors","author":"C. Eastman","year":"2008","unstructured":"Eastman, C., Teicholz, P., Sacks, R., Liston, K.: BIM Handbook: A Guide to Building Information Modeling, for Owners, Managers, Designers, Engineers, and Contractors. John Wiley & Sons, Hoboken (2008)"},{"key":"62_CR3","doi-asserted-by":"crossref","unstructured":"Anderson, A., Marsters, A., Sturts Dossick, C., Neff, G.: Construction to Operations Exchange: Challenges of Implementation COBie and BIM in a Large Owner Organization. Construction Research Congress, 15 p. Purdue University, IN (2012)","DOI":"10.1061\/9780784412329.070"},{"key":"62_CR4","unstructured":"Reefman, R., van Nederveen, S.: A Controlled Integral Product Model (IPM\u00ae) in Building and Construction. In: Proceedings of CIB W78-W102 2011: Intl Conf., France (2012)"},{"key":"62_CR5","volume-title":"Building product models: Computer environments supporting design and construction","author":"C.M. Eastman","year":"1999","unstructured":"Eastman, C.M.: Building product models: Computer environments supporting design and construction. CRC Press, Boca Raton (1999)"},{"key":"62_CR6","doi-asserted-by":"crossref","unstructured":"East, W.E.: Construction Operation Building Information Exchange. USACE ERDC (2007)","DOI":"10.21236\/ADA491899"},{"key":"62_CR7","unstructured":"Bonandrini, S., Cruz, C., Nicolle, C.: Building lifecycle management. In: Bouras, A., Gurumoorthy, B., Sudarsan, R. (eds.) Proceedings of the International Conference on Product Lifecycle Management, PLM 2005, Lyon, pp. 461\u2013471 (2005)"},{"key":"62_CR8","unstructured":"Drogemuller, R., Schevers, H.: Sydney Opera House - FM Exemplar Project: Building Information Modelling for FM at Sydney Opera House (2006)"},{"issue":"1","key":"62_CR9","doi-asserted-by":"publisher","first-page":"70","DOI":"10.1016\/j.autcon.2008.05.001","volume":"18","author":"R. Vanlande","year":"2008","unstructured":"Vanlande, R., Nicolle, C., Cruz, C.: IFC and building lifecycle management. Automation in Construction\u00a018(1), 70\u201378 (2008)","journal-title":"Automation in Construction"},{"issue":"1","key":"62_CR10","doi-asserted-by":"publisher","first-page":"55","DOI":"10.4018\/ij3dim.2012010104","volume":"1","author":"Y. Arayici","year":"2012","unstructured":"Arayici, Y., Onyenobi, T., Egbu, C.: Building information modelling (BIM) for facilities management (FM): The MediaCity case study approach. International Journal of 3-D Information Modeling (IJ3DIM)\u00a01(1), 55\u201373 (2012)","journal-title":"International Journal of 3-D Information Modeling (IJ3DIM)"},{"issue":"5\/6","key":"62_CR11","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1108\/02632771211208477","volume":"30","author":"M. Ebinger","year":"2012","unstructured":"Ebinger, M., Madritsch, T.: A Classification Framework for Facilities and Real Estate Management: The Built Environment Management Model (BEM2). Facilities\u00a030(5\/6), 1 (2012)","journal-title":"Facilities"},{"key":"62_CR12","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1016\/j.autcon.2012.04.003","volume":"25","author":"W. Shen","year":"2012","unstructured":"Shen, W., Hao, Q., Xue, Y.: A loosely coupled system integration approach for decision support in facility management and maintenance. Automation in Construction\u00a025, 41\u201348 (2012)","journal-title":"Automation in Construction"},{"key":"62_CR13","unstructured":"Kiviniemi, A.: Requirements management interface to building product models (CIFE Technical Report No. 161, PhD thesis), Stanford University, Stanford, CA (2005)"},{"issue":"2","key":"62_CR14","doi-asserted-by":"publisher","first-page":"185","DOI":"10.1016\/S0926-5805(00)00097-2","volume":"11","author":"Y. Song","year":"2002","unstructured":"Song, Y., Clayton, M.J., Johnson, R.E.: Anticipating reuse: Documenting buildings for operations using web technology. Automation in Construction\u00a011(2), 185\u2013197 (2002)","journal-title":"Automation in Construction"},{"key":"62_CR15","volume-title":"BIM and FM: The Portal to Lifecycle Facility Management","author":"D.A. Jordani","year":"2010","unstructured":"Jordani, D.A.: BIM and FM: The Portal to Lifecycle Facility Management. National Institute of Building Sciences and buildingSMART Alliance, Washington (2010)"},{"key":"62_CR16","unstructured":"Whyte, J., Lindkvist, C., Ibrahim, N.H.: From Projects into Operations: Lessons for Data Handover. Uni. of Reading, DIRC. Working Paper (2011), \n                    \n                      www.reading.ac.uk\/designinnovation\/for-industry\/di-for-industry-workingpapers.aspx\n                    \n                    \n                   (accessed February 15, 2013)"},{"key":"62_CR17","unstructured":"Xuesong, L., Eybpoosh, M., Akinci, B.: Developing As-built Building Information Model Using Construction Process History Captured by a Laser Scanner and a Camera. Construction Research Congress (2012)"},{"key":"62_CR18","unstructured":"American Institute of Architects, Integrated Project Delivery: A Guide. CA Council (2007)"},{"key":"62_CR19","unstructured":"Glick, S., Guggemos, A.: IPD and BIM: Benefits and opportunities for regulatory agencies. In: Proc. of 45th Associated Schools of Construction National Conference, Gainesville (2009)"},{"key":"62_CR20","doi-asserted-by":"crossref","unstructured":"Bew, M., Underwood, J.: Delivering BIM to the UK Market. In: Underwood, J., Umit, I. (eds.) Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies, pp. 30\u201364. IGI Global (2010)","DOI":"10.4018\/978-1-60566-928-1.ch003"},{"key":"62_CR21","unstructured":"London, K., Singh, V., Taylor, C., Gu, N., Brankovic, L.: Building information modelling project decision support framework. In: Dainty, A. (ed.) Proc. 24th Annual ARCOM Conference, Cardiff, UK, vol.\u00a02, pp. 655\u2013664. Assoc. of Researchers in Const. Mgmt (2008)"},{"key":"62_CR22","volume-title":"Case Study Research: Design and Methods","author":"R.K. Yin","year":"2009","unstructured":"Yin, R.K.: Case Study Research: Design and Methods, 4th edn. Sage Pub., CA (2009)","edition":"4"},{"key":"62_CR23","unstructured":"East, W.E.: Performance Specification for Building Information Exchange. National Institute of Building Sciences and buildingSMART Alliance (2009)"},{"key":"62_CR24","unstructured":"Penttil\u00e4, H.: Describing the changes in architectural information technology to understand design complexity and free-form architectural expression. ITcon 11 Special Issue: The Effects of CAD on Building Form and Design Quality, 395\u2013408 (2006)"}],"container-title":["IFIP Advances in Information and Communication Technology","Product Lifecycle Management for Society"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-41501-2_62","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,24]],"date-time":"2019-05-24T00:00:55Z","timestamp":1558656055000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-41501-2_62"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642415005","9783642415012"],"references-count":24,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-41501-2_62","relation":{"is-part-of":[{"id-type":"doi","id":"https:\/\/doi.org\/10.1007\/978-3-642-41501-2","asserted-by":"object"}]},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013]]}}}