{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,8]],"date-time":"2024-09-08T03:22:55Z","timestamp":1725765775139},"publisher-location":"Berlin, Heidelberg","reference-count":22,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642537028"},{"type":"electronic","value":"9783642537035"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-53703-5_33","type":"book-chapter","created":{"date-parts":[[2013,12,19]],"date-time":"2013-12-19T07:37:54Z","timestamp":1387438674000},"page":"313-322","source":"Crossref","is-referenced-by-count":0,"title":["Research on Rule of Project Risk Transfer"],"prefix":"10.1007","author":[{"given":"Li","family":"Xiaosong","sequence":"first","affiliation":[]},{"given":"Lv","family":"Bin","sequence":"additional","affiliation":[]},{"given":"Zhan","family":"Ming","sequence":"additional","affiliation":[]},{"given":"Han","family":"Li","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"33_CR1","first-page":"37","volume-title":"Project Risk Element Transmission Theory and Application","author":"L. Cunbin","year":"2009","unstructured":"Cunbin, L.: Project Risk Element Transmission Theory and Application, pp. 37\u201340. China Water Power Press, Beijing (2009)"},{"key":"33_CR2","first-page":"96","volume":"31","author":"M. Li","year":"2007","unstructured":"Li, M., Guangming, Z., Ping, L.: Research on the Transmission Mechanism and Transmission Path of Supply Chain Risk. Sci-Tech Information Development & Economy\u00a031, 96\u201398 (2007)","journal-title":"Sci-Tech Information Development & Economy"},{"key":"33_CR3","first-page":"480","volume":"5","author":"X. Li","year":"2009","unstructured":"Li, X., Cai, W.: The Application of Risk Matrix to Software project Risk management. 2009 International Forum on Information Technology and Applications\u00a05, 480\u2013483 (2009)","journal-title":"2009 International Forum on Information Technology and Applications"},{"issue":"2","key":"33_CR4","first-page":"106","volume":"33","author":"X.-K. Su","year":"2006","unstructured":"Su, X.-K., et al.: Stochastic Simulation and Risk Analysis of the Xiang-jiang River Water Quality. Journal of Hunan University (Natural Sciences)\u00a033(2), 106\u2013109 (2006)","journal-title":"Journal of Hunan University (Natural Sciences)"},{"issue":"1","key":"33_CR5","first-page":"539","volume":"15","author":"C. Li","year":"2008","unstructured":"Li, C., Wang, J.: Model of Generic Project Risk Element Transmission Theory Based on Date Mining. Journal of Central South University of Technology\u00a015(1), 539\u2013546 (2008)","journal-title":"Journal of Central South University of Technology"},{"key":"33_CR6","volume-title":"Random process","author":"Z. Zhuokui","year":"2003","unstructured":"Zhuokui, Z., Huichan, C.: Random process, vol.\u00a0140. Xidian University Press, Xian (2003)"},{"key":"33_CR7","series-title":"CCIS","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1007\/978-3-642-20370-1_7","volume-title":"Advanced Research on Electronic Commerce, Web Application, and Communication","author":"C. Yang","year":"2011","unstructured":"Yang, C.: Analysis Model of Cooperatively Technical Innovation Risk. In: Shen, G., Huang, X. (eds.) ECWAC 2011, Part II. CCIS, vol.\u00a0144, pp. 37\u201343. Springer, Heidelberg (2011)"},{"key":"33_CR8","doi-asserted-by":"crossref","unstructured":"Yang, P.C., Weeb, H.M., Liu, B.S., Fong, O.K.: Mitigating Hi-tech Products Risks due to Rapid Technological Innovation. Omega\u00a039 (2011)","DOI":"10.1016\/j.omega.2010.09.007"},{"issue":"2","key":"33_CR9","doi-asserted-by":"publisher","first-page":"114","DOI":"10.1016\/j.jom.2009.02.001","volume":"27","author":"R. Narasimhan","year":"2009","unstructured":"Narasimhan, R., Talluri, S.: Perspectives on risk management in supply chains. Journal of Operations Management\u00a027(2), 114\u2013118 (2009)","journal-title":"Journal of Operations Management"},{"issue":"8","key":"33_CR10","doi-asserted-by":"crossref","first-page":"1291","DOI":"10.1016\/j.automatica.2005.11.008","volume":"42","author":"Y.J. Chen","year":"2006","unstructured":"Chen, Y.J., Seshadri, S.: Supply chain structure and demand risk. Automatica (Oxford)\u00a042(8), 1291\u20131299 (2006)","journal-title":"Automatica (Oxford)"},{"issue":"7","key":"33_CR11","doi-asserted-by":"publisher","first-page":"1057","DOI":"10.1016\/j.ijproman.2013.03.001","volume":"31","author":"C. Chang","year":"2013","unstructured":"Chang, C.: A critical analysis of recent advances in the techniques for the evaluation of renewable energy projects. International Journal of Project Management\u00a031(7), 1057\u20131067 (2013)","journal-title":"International Journal of Project Management"},{"key":"33_CR12","doi-asserted-by":"publisher","first-page":"172","DOI":"10.1016\/j.enpol.2013.05.098","volume":"61","author":"S. Dave","year":"2013","unstructured":"Dave, S., Sooriyabandara, M., Yearworth, M.: System behaviour modelling for demand response provision in a smart grid. Energy Policy\u00a061, 172\u2013181 (2013)","journal-title":"Energy Policy"},{"issue":"5","key":"33_CR13","doi-asserted-by":"publisher","first-page":"471","DOI":"10.1080\/01446193.2013.800946","volume":"31","author":"D. Espinoza","year":"2013","unstructured":"Espinoza, D., Morris, J.: Decoupled NPV: a simple, improved method to value infrastructure investments. Construction Management and Economics\u00a031(5), 471\u2013496 (2013)","journal-title":"Construction Management and Economics"},{"key":"33_CR14","doi-asserted-by":"publisher","first-page":"114","DOI":"10.1016\/j.autcon.2012.11.012","volume":"31","author":"C. Yu","year":"2013","unstructured":"Yu, C., Lam, K.: A Decision Support System for the determination of concession period length in transportation project under BOT contract. Automation in Construction\u00a031, 114\u2013127 (2013)","journal-title":"Automation in Construction"},{"issue":"4","key":"33_CR15","doi-asserted-by":"publisher","first-page":"602","DOI":"10.1016\/j.ijproman.2012.10.003","volume":"31","author":"Y. Kuo","year":"2013","unstructured":"Kuo, Y., Lu, S.: Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects. International Journal of Project Management\u00a031(4), 602\u2013614 (2013)","journal-title":"International Journal of Project Management"},{"issue":"3","key":"33_CR16","doi-asserted-by":"publisher","first-page":"223","DOI":"10.1080\/01446193.2012.761715","volume":"31","author":"A. Park","year":"2013","unstructured":"Park, A., Chang, C.: Impacts of construction events on the project equity value of the Channel Tunnel project. Construction Management and Economics\u00a031(3), 223\u2013237 (2013)","journal-title":"Construction Management and Economics"},{"issue":"2","key":"33_CR17","doi-asserted-by":"publisher","first-page":"88","DOI":"10.1016\/j.iatssr.2012.11.001","volume":"36","author":"X. Zhang","year":"2013","unstructured":"Zhang, X., Chen, S.: A systematic framework for infrastructure development through public private partnerships. IATSS Research\u00a036(2), 88\u201397 (2013)","journal-title":"IATSS Research"},{"issue":"6","key":"33_CR18","doi-asserted-by":"publisher","first-page":"879","DOI":"10.3846\/13923730.2012.734856","volume":"18","author":"H. Abbasianjahromi","year":"2012","unstructured":"Abbasianjahromi, H., Rajaie, H.: Developing a project portfolio selection model for contractor firms considering the risk factor. Journal of Civil Engineering and Management\u00a018(6), 879\u2013889 (2012)","journal-title":"Journal of Civil Engineering and Management"},{"key":"33_CR19","doi-asserted-by":"publisher","first-page":"467","DOI":"10.1016\/j.apenergy.2012.04.010","volume":"98","author":"G. Lorenzo Di","year":"2012","unstructured":"Di Lorenzo, G., Pilidis, P., Witton, J., Probert, D.: Monte-Carlo simulation of investment integrity and value for power-plants with carbon-capture. Applied Energy\u00a098, 467\u2013478 (2012)","journal-title":"Applied Energy"},{"issue":"5","key":"33_CR20","doi-asserted-by":"publisher","first-page":"675","DOI":"10.3846\/13923730.2012.723380","volume":"18","author":"Y. Ke","year":"2012","unstructured":"Ke, Y., Wang, S., Chan, A.: Risk management practice in China\u2019s Public-Private Partnership projects. Journal of Civil Engineering and Management\u00a018(5), 675\u2013684 (2012)","journal-title":"Journal of Civil Engineering and Management"},{"key":"33_CR21","doi-asserted-by":"publisher","first-page":"368","DOI":"10.1016\/j.autcon.2011.09.015","volume":"22","author":"M. Khanzadi","year":"2012","unstructured":"Khanzadi, M., Nasirzadeh, F., Alipour, M.: Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects. Automation in Construction\u00a022, 368\u2013376 (2012)","journal-title":"Automation in Construction"},{"issue":"4","key":"33_CR22","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1080\/10286608.2011.604415","volume":"28","author":"H. Lee","year":"2011","unstructured":"Lee, H.: An integrated model for planning development projects using ACO and construction simulation. Civil Engineering and Environmental Systems\u00a028(4), 285\u2013300 (2011)","journal-title":"Civil Engineering and Environmental Systems"}],"container-title":["Communications in Computer and Information Science","Information Computing and Applications"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-53703-5_33","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,25]],"date-time":"2019-05-25T17:14:18Z","timestamp":1558804458000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-53703-5_33"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642537028","9783642537035"],"references-count":22,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-53703-5_33","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2013]]}}}