{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T17:25:48Z","timestamp":1725643548568},"publisher-location":"Berlin, Heidelberg","reference-count":10,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540003878"},{"type":"electronic","value":"9783642555374"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2003]]},"DOI":"10.1007\/978-3-642-55537-4_13","type":"book-chapter","created":{"date-parts":[[2011,12,15]],"date-time":"2011-12-15T15:12:30Z","timestamp":1323961950000},"page":"83-88","source":"Crossref","is-referenced-by-count":0,"title":["Scheduling of Rolling Ingots Production"],"prefix":"10.1007","author":[{"given":"Christoph","family":"Schwindt","sequence":"first","affiliation":[]},{"given":"Norbert","family":"Trautmann","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"13_CR1","volume-title":"Network Flows","author":"R Ahuja","year":"1993","unstructured":"Ahuja, R., Magnanti, T., Orlin, J. (1993): Network Flows. Prentice Hall, Englewood Cliffs"},{"key":"13_CR2","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker, P., Drexl, A., M\u00f6hring, R., Neumann, K, Pesch, E. (1999): Resourceconstrained project scheduling: notation, classification, models, and methods. European Journal of Operational Research 112, 3\u201341","journal-title":"European Journal of Operational Research"},{"key":"13_CR3","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1007\/BF01721356","volume":"7","author":"B Fleischmann","year":"1985","unstructured":"Fleischmann, B., Jess, H. (1985): Erfahrungen mit einem Simulationsmodell in einer AluminiumgieBerei. OR Spektrum 7, 175\u2013185","journal-title":"OR Spektrum"},{"key":"13_CR4","doi-asserted-by":"publisher","first-page":"1647","DOI":"10.1016\/S0098-1354(01)00729-3","volume":"25","author":"I Harjunkoski","year":"2001","unstructured":"Harjunkoski, I., Grossmann, I. (2001): A decomposition approach for the scheduling of a steel plant production. Computers & Chemical Engineering 25, 1647\u20131660","journal-title":"Computers& Chemical Engineering"},{"key":"13_CR5","volume-title":"1: Fundamentals and Materials","author":"C Kammer","year":"1999","unstructured":"Kammer, C. (1999): Aluminium Handbook Vol. 1: Fundamentals and Materials. Aluminium, Dsseldorf"},{"key":"13_CR6","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/S0278-6125(98)80008-3","volume":"17","author":"KG Kempf","year":"1998","unstructured":"Kempf, KG., Uzsoy, R., Wang, C.S. (1998): Scheduling a single batch processing machine with secondary resource const raints. Journal of Manufact uring Systems 17, 37\u201351","journal-title":"Journal of Manufact uring Systems"},{"key":"13_CR7","volume-title":"Project Scheduling with Time Windows and Scarce Resources","author":"K Neumann","year":"2001","unstructured":"Neumann, K, Schwindt, C., Zimmermann, J. (2001): Project Scheduling with Time Windows and Scarce Resources. Springer, Berlin"},{"key":"13_CR8","doi-asserted-by":"publisher","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C Potts","year":"2000","unstructured":"Pot ts, C., Kovalyov, M. (2000): Scheduling with batching: A review. European Journal of Operational Research 120, 228\u2013249","journal-title":"European Journal of Operational Research"},{"key":"13_CR9","volume-title":"Production Scheduling with Batching Resources: Industrial Context, Model, and Solution Method","author":"C Schwindt","year":"2002","unstructured":"Schwindt, C., Trautmann, N. (2002): Production Scheduling with Batching Resources: Industrial Context, Model, and Solution Method. Report WIOR618, University of Kar lsruhe"},{"key":"13_CR10","doi-asserted-by":"publisher","first-page":"2685","DOI":"10.1080\/00207549508904839","volume":"33","author":"R Uzsoy","year":"1995","unstructured":"Uzsoy, R. (1995): Scheduling batch processing machines with incompatible job families. International Journal of Production Research 33, 2685\u20132708","journal-title":"International Journal of Production Research"}],"container-title":["Operations Research Proceedings 2002"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-55537-4_13","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,21]],"date-time":"2019-04-21T22:44:27Z","timestamp":1555886667000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-55537-4_13"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003]]},"ISBN":["9783540003878","9783642555374"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-55537-4_13","relation":{},"subject":[],"published":{"date-parts":[[2003]]}}}