{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T17:26:12Z","timestamp":1725643572399},"publisher-location":"Berlin, Heidelberg","reference-count":5,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540003878"},{"type":"electronic","value":"9783642555374"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2003]]},"DOI":"10.1007\/978-3-642-55537-4_14","type":"book-chapter","created":{"date-parts":[[2011,12,15]],"date-time":"2011-12-15T15:12:30Z","timestamp":1323961950000},"page":"89-94","source":"Crossref","is-referenced-by-count":0,"title":["Determination of Economic Production Quantity for a Multi-Stage Production System with Limited Storage Capacity"],"prefix":"10.1007","author":[{"given":"U.","family":"Buscher","sequence":"first","affiliation":[]},{"given":"G.","family":"Lindner","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"14_CR1","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1016\/S0305-0483(00)00040-2","volume":"29","author":"R Bogaschewsky","year":"2001","unstructured":"Bogaschewsky R, Buscher U and Lindner G (2001) Optimizing Multi-Stage Production with Constant Lot Size and Varying Number of Unequal Sized Batches. Omega 29:183\u2013191","journal-title":"Omega"},{"key":"14_CR2","volume-title":"Working Paper","author":"U Buscher","year":"2002","unstructured":"Buscher U and Lindner G (2002) Simultane Bestimmung von Fertigungs-und Transportlosgr\u00f6\u00dfen bei beschr\u00e4nkter Lagerkapazit\u00e4t\u2013Planung stufenbezogener Transporth\u00e4ufigkeiten. Working Paper, Bayerische Julius-Maximilians University W\u00fcrzburg, Germany"},{"key":"14_CR3","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1016\/0377-2217(84)90237-6","volume":"17","author":"Z Drezner","year":"1984","unstructured":"Drezner Z, Szendrovits AZ and Wesolowsky GO (1984) Multi-Stage Production with Variable Lot Sizes and Transportation of Partial Lots. European Journal of Operational Research 17:227\u2013237","journal-title":"European Journal of Operational Research"},{"key":"14_CR4","doi-asserted-by":"publisher","first-page":"298","DOI":"10.1287\/mnsc.22.3.298","volume":"22","author":"AZ Szendrovits","year":"1975","unstructured":"Szendrovits AZ (1975) Manufacturing Cycle Time Determination for a MultiStage Economic Production Quantity Model. Management Science 22: 298\u2013308","journal-title":"Management Science"},{"key":"14_CR5","doi-asserted-by":"publisher","first-page":"623","DOI":"10.1016\/0305-0483(80)90003-1","volume":"8","author":"AZ Szendrovits","year":"1980","unstructured":"Szendrovits AZ and Drezner Z (1980) Optimizing Multi-Stage Production with Constant Lot Size and Varying Number of Batches. Omega 8:623\u2013629","journal-title":"Omega"}],"container-title":["Operations Research Proceedings 2002"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-55537-4_14","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,21]],"date-time":"2019-04-21T22:47:40Z","timestamp":1555886860000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-55537-4_14"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003]]},"ISBN":["9783540003878","9783642555374"],"references-count":5,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-55537-4_14","relation":{},"subject":[],"published":{"date-parts":[[2003]]}}}