{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T17:26:06Z","timestamp":1725643566269},"publisher-location":"Berlin, Heidelberg","reference-count":7,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540003878"},{"type":"electronic","value":"9783642555374"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2003]]},"DOI":"10.1007\/978-3-642-55537-4_16","type":"book-chapter","created":{"date-parts":[[2011,12,15]],"date-time":"2011-12-15T15:12:30Z","timestamp":1323961950000},"page":"102-107","source":"Crossref","is-referenced-by-count":6,"title":["Lotsizing in a Production System with Rework and Product Deterioration"],"prefix":"10.1007","author":[{"given":"K.","family":"Inderfurth","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"G.","family":"Lindner","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"N. P.","family":"Rahaniotis","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"16_CR1","doi-asserted-by":"publisher","first-page":"26","DOI":"10.1080\/09537280110061548","volume":"13","author":"SDP Flapper","year":"2002","unstructured":"Flapper SDP, Fransoo JC, Broekmeulen RACM, and Inderfurth K (2002) Planning and control of rework in the process industries: a review. Production Planning & Control 13: 26-34","journal-title":"Production Planning & Control"},{"key":"16_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0377-2217(00)00248-4","volume":"134","author":"SK Goyal","year":"2001","unstructured":"Goyal SK and Giri BC (2001) Recent trends in modeling of deteriorating inventory. European Journal of Operational Research 134: 1-16","journal-title":"European Journal of Operational Research"},{"key":"16_CR3","volume-title":"Working Paper","author":"K Inderfurth","year":"2002","unstructured":"Inderfurth K, Lindner G and Rahaniotis NP (2002) Lotsizing in a Production System with Rework and Product Deterioration. Working Paper, Otto-vonGuericke-University Magdeburg, Germany"},{"key":"16_CR4","volume-title":"Working Paper","author":"G Lindner","year":"2002","unstructured":"Lindner G and Buscher U (2002) An Optimal Lot and Batch Size Policy for a Single Item Produced and Remanufactured on One Machine in the Presence of Limitations on the Manufacturing and Handling Capacity. Working Paper, Otto-von-Guericke-University Magdeburg, Germany"},{"key":"16_CR5","doi-asserted-by":"publisher","first-page":"328","DOI":"10.1007\/978-3-642-56656-1_52","volume-title":"Operations Research Proceedings 2000. Springer, Berlin et al.","author":"S Minner","year":"2001","unstructured":"Minner S (2001) Economic Production and Remanufacturing Lot-sizing Under Constant Demands and Returns. In: B. Fleischmann et al. (eds) Operations Research Proceedings 2000. Springer, Berlin et al., pp 328-332"},{"key":"16_CR6","doi-asserted-by":"publisher","first-page":"495","DOI":"10.1080\/00207547508943019","volume":"13","author":"RB Misra","year":"1975","unstructured":"Misra RB (1975) Optimum production lot size for a system with deteriorating inventory. International Journal of Production Research 13: 495-505","journal-title":"International Journal of Production Research"},{"key":"16_CR7","doi-asserted-by":"crossref","unstructured":"Teunter RH and Flapper SDP (2003) Lot-sizing for a single-stage singleproduct production system with rework of perishable rework defectives. OR Spectrum forthcoming","DOI":"10.1007\/s00291-002-0105-3"}],"container-title":["Operations Research Proceedings 2002"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-55537-4_16","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,20]],"date-time":"2019-06-20T20:28:18Z","timestamp":1561062498000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-55537-4_16"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003]]},"ISBN":["9783540003878","9783642555374"],"references-count":7,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-55537-4_16","relation":{},"subject":[],"published":{"date-parts":[[2003]]}}}