{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T17:25:57Z","timestamp":1725643557696},"publisher-location":"Berlin, Heidelberg","reference-count":9,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540003878"},{"type":"electronic","value":"9783642555374"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2003]]},"DOI":"10.1007\/978-3-642-55537-4_35","type":"book-chapter","created":{"date-parts":[[2011,12,15]],"date-time":"2011-12-15T15:12:30Z","timestamp":1323961950000},"page":"217-222","source":"Crossref","is-referenced-by-count":0,"title":["Scheduling Problems with Optimal Due Interval Assignment Subject to Some Generalized Criteria"],"prefix":"10.1007","author":[{"given":"Adam","family":"Janiak","sequence":"first","affiliation":[]},{"given":"Marcin","family":"Marek","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"35_CR1","doi-asserted-by":"publisher","first-page":"156","DOI":"10.1016\/0377-2217(89)90100-8","volume":"38","author":"TCE Cheng","year":"1989","unstructured":"Cheng T.C.E., Gupta M.C. (1989). Survey of scheduling research involving due date determination decision. European Journal of Operational Research. 38, 156\u2013166.","journal-title":"European Journal of Operational Research"},{"key":"35_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0377-2217(01)00181-3","volume":"139","author":"C Chengbin","year":"2002","unstructured":"Chengbin C., Gordon V., Proth J.-M. (2002). A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research, 139, 1\u201325.","journal-title":"European Journal of Operational Research"},{"key":"35_CR3","doi-asserted-by":"publisher","first-page":"117","DOI":"10.1080\/09537280110069621","volume":"13","author":"C Chengbin","year":"2002","unstructured":"Chengbin C., Gordon V., Proth J.-M. (2002). Due date assignment and scheduling: SLK, TWK and other due date assignment models. Production Planning & Control. 13, 117\u2013132.","journal-title":"Production Planning& Control"},{"key":"35_CR4","series-title":"Horwood, Chichester.","volume-title":"Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop","author":"S French","year":"1982","unstructured":"French S. (1982). Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop. Horwood, Chichester."},{"key":"35_CR5","first-page":"263","volume":"17","author":"RL Graham","year":"1969","unstructured":"Graham R.L. (1969). Bounds on multiprocessing timing anomalies. SIAM J. Appl. Math. 17 263\u2013369.","journal-title":"J. Appl. Math"},{"key":"35_CR6","series-title":"Operations Research Procedings 2001. Springer","first-page":"207","volume-title":"Multi-machine scheduling problem with optimal due interval assignment subject to generalized sum type criterion","author":"A Janiak","year":"2001","unstructured":"Janiak A., Marek M. (2001). Multi-machine scheduling problem with optimal due interval assignment subject to generalized sum type criterion. Operations Research Procedings 2001. Springer, 207\u2013212."},{"key":"35_CR7","doi-asserted-by":"publisher","first-page":"68","DOI":"10.1016\/0377-2217(95)00181-6","volume":"93","author":"SD Liman","year":"1996","unstructured":"Liman S.D., Panwalkar S.S., Thongmee S. (1996). Determination of common due window location in a single machine scheduling problem. European Journal of Operational Research. 93, 68\u201374.","journal-title":"European Journal of Operational Research"},{"key":"35_CR8","doi-asserted-by":"crossref","first-page":"1007","DOI":"10.1057\/palgrave.jors.2600601","volume":"49","author":"SD Liman","year":"1998","unstructured":"Liman S.D., Panwalkar S.S., Thongmee S. (1998). Common due window size and location determination in a single machine scheduling problem. Journal of the Operational Research Society. 49, 1007\u20131010.","journal-title":"Journal of the Operational Research Society"},{"key":"35_CR9","doi-asserted-by":"publisher","first-page":"116","DOI":"10.1145\/321921.321934","volume":"23","author":"S Sahni","year":"1976","unstructured":"Sahni S. (1976). Algorithm for scheduling indenpendent tasks. J. Assoc. Comput. Mach. 23, 116\u2013127.","journal-title":"J. Assoc. Comput. Mach"}],"container-title":["Operations Research Proceedings 2002"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-55537-4_35","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,21]],"date-time":"2019-04-21T23:38:15Z","timestamp":1555889895000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-55537-4_35"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003]]},"ISBN":["9783540003878","9783642555374"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-55537-4_35","relation":{},"subject":[],"published":{"date-parts":[[2003]]}}}