{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T15:15:45Z","timestamp":1725894945005},"publisher-location":"Berlin, Heidelberg","reference-count":8,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540502739"},{"type":"electronic","value":"9783642740510"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[1988]]},"DOI":"10.1007\/978-3-642-74051-0_61","type":"book-chapter","created":{"date-parts":[[2012,7,1]],"date-time":"2012-07-01T05:45:51Z","timestamp":1341121551000},"page":"416-421","source":"Crossref","is-referenced-by-count":1,"title":["Rechnergest\u00fctzte Modellbildung und Simulation flexibel automatisierter Montagesysteme"],"prefix":"10.1007","author":[{"given":"H.","family":"Hartberger","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"J.","family":"Milberg","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"3","key":"61_CR1","first-page":"6","volume":"35","author":"J Milberg","year":"1987","unstructured":"Milberg, J., B\u00fcrstner, H.: \u201cMontageautomatisierung, ein wirksamer Wettbewerbsfaktor\u201d, Planung und Produktion 35 (1987) 3, S. 6\u201315.","journal-title":"Planung und Produktion"},{"key":"61_CR2","first-page":"32","volume":"6","author":"J. Milberg","year":"1987","unstructured":"Milberg, J.: \u201cSammelbecken aller Fehler: Die Montageautomatisierung kommt nur langsam voran\u201d, Moderne Fertigung (1987) 6, S. 32\u201339.","journal-title":"Moderne Fertigung"},{"key":"61_CR3","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-72860-0","volume-title":"Montagegerechtes Konstruieren durch die Integration von Produkt-und Montageproze\u00dfgestaltung","author":"P Barthelme\u00df","year":"1987","unstructured":"Barthelme\u00df, P.: Montagegerechtes Konstruieren durch die Integration von Produkt-und Montageproze\u00dfgestaltung, Springer-Verlag, Berlin 1987."},{"key":"61_CR4","volume-title":"An Approach to General Systems Theory","author":"GJ Klir","year":"1969","unstructured":"Klir, G.J: An Approach to General Systems Theory, New York, Van Nostrand Reinhold Company 1969."},{"key":"61_CR5","unstructured":"o.V.: VDI 2221 (10\/86), Methodik zum Entwickeln und Konstruieren technischer Systeme und Produkte."},{"key":"61_CR6","unstructured":"Spur G.: Geometrische Methoden-und Modellbank, Forschungsbericht 1984\u201387, Teilprojekt AI des SFB: Rechnergest\u00fctzte Konstruktionsmodelle im Maschinenwesen, TU Berlin 1987."},{"key":"61_CR7","doi-asserted-by":"crossref","first-page":"484","DOI":"10.1515\/zwf-1986-810916","volume":"81","author":"J Milberg","year":"1986","unstructured":"Milberg, J.; Wrba, P.: \u201cRobotereinsatzplanung und Offline Programmierung mit USIS\u201d, ZwF 81 (1986), S. 484\u2013488.","journal-title":"ZwF"},{"key":"61_CR8","doi-asserted-by":"crossref","unstructured":"Riese, K.: Klipsmontage mit Industrierobotern, Springer-Verlag 1988.","DOI":"10.1007\/978-3-642-73613-1"}],"container-title":["Informatik-Fachberichte","Simulationstechnik"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-74051-0_61.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,19]],"date-time":"2022-01-19T19:25:24Z","timestamp":1642620324000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-74051-0_61"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1988]]},"ISBN":["9783540502739","9783642740510"],"references-count":8,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-74051-0_61","relation":{},"ISSN":["0343-3005"],"issn-type":[{"type":"print","value":"0343-3005"}],"subject":[],"published":{"date-parts":[[1988]]}}}