{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T17:01:47Z","timestamp":1725642107738},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540559603"},{"type":"electronic","value":"9783642778100"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[1992]]},"DOI":"10.1007\/978-3-642-77810-0_42","type":"book-chapter","created":{"date-parts":[[2011,12,9]],"date-time":"2011-12-09T20:17:31Z","timestamp":1323461851000},"page":"463-472","source":"Crossref","is-referenced-by-count":0,"title":["Ereignissensitive Umdisposition von Ablaufpl\u00e4nen"],"prefix":"10.1007","author":[{"given":"H.","family":"Henseler","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"H.-J.","family":"Appelrath","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"42_CR1","unstructured":"Bruns, R., Appelrath, H.-J.: \u201cEin universelles Modell f\u00fcr Ablaufplanungsprobleme\u201d, Wirtschaftsinformatik 6\/91, Verlag Vieweg."},{"key":"42_CR2","series-title":"Interner Bericht IS","volume-title":"Ereignisbasiertes Umdisponieren in Produktionsplanungssysternen","author":"H Henseler","year":"1992","unstructured":"Henseler, H.: \u201cEreignisbasiertes Umdisponieren in Produktionsplanungssysternen\u201d, Interner Bericht IS 10, Fachbereich Informatik, Universit\u00e4t Oldenburg, 1992."},{"key":"42_CR3","volume-title":"Wissensbasierte \u00dcberwachung und Planung in der Fertigung","author":"A Huber","year":"1990","unstructured":"Huber, A.: \u201cWissensbasierte \u00dcberwachung und Planung in der Fertigung\u201d, Erich Schmidt Verlag 1990."},{"key":"42_CR4","series-title":"Interner Bericht IS8","volume-title":"Endbericht der Projektgruppe PUSSY (Wissensbasierte Produktionsplanungs- und -Steuerungssysteme","author":"J Sauer","year":"1990","unstructured":"Sauer, J., Appelrath, H.-J. et al.:\u201cEndbericht der Projektgruppe PUSSY (Wissensbasierte Produktionsplanungs- und -Steuerungssysteme)\u201d, Interner Bericht IS8, Fachbereich Informatik, Universit\u00e4t Oldenburg, 1990."},{"key":"42_CR5","doi-asserted-by":"crossref","DOI":"10.1515\/9783110847055","volume-title":"Interaktive betriebswirtschaftliche Informations- und Steuerungssysteme","author":"K Kurbel","year":"1989","unstructured":"Kurbel, K., Meynert, J.: \u201cEngpa\u00dforientierte Auftragsterminierung und Kapazit\u00e4ts-disposition\u201d, in: Kurbel, K.: \u201cInteraktive betriebswirtschaftliche Informations- und Steuerungssysteme\u201d, de Gruyter, 1989."},{"key":"42_CR6","volume-title":"Interaktive betriebswirtschaftliche Informations- und Steuerungssysteme","author":"P Mertens","year":"1989","unstructured":"Mertens, P., Helmer, J., Rose, H., Wedel, T.: \u201cEin Ansatz zu kooperierenden Exper-tensystemen bei der Produktionsplanung und -Steuerung\u201d, in: Kurbel, K.: \u201cInteraktive betriebswirtschaftliche Informations- und Steuerungssysteme\u201d, de Gruyter, 1989."},{"key":"42_CR7","unstructured":"Ow, P. S., Smith, S. F., Thiriez, A.: \u201cReactive Plan Revision\u201d, AAAI 88."},{"key":"42_CR8","volume-title":"Dissertation, N\u00fcrnberg","author":"H Rose","year":"1989","unstructured":"Rose, H.: \u201cComputergest\u00fctzte St\u00f6rungsbew\u00e4ltigung beim Durchlauf von Produktionsauftr\u00e4gen unter besonderer Ber\u00fccksichtigung wissensbasierter Elemente\u201d, Dissertation, N\u00fcrnberg, 1989."},{"key":"42_CR9","volume-title":"Interaktive betriebswirtschaftliche Informations- und Steuerungssysteme","author":"A-W Scheer","year":"1989","unstructured":"Scheer, A.-W., Herterich, R., Zell, M.: \u201cInteraktive Fertigungssteuerung teilautonomer Bereiche\u201d, in: Kurbel, K.: \u201cInteraktive betriebswirtschaftliche Informations- und Steuerungssysteme\u201d, de Gruyter, 1989."},{"key":"42_CR10","volume-title":"OPIS: An Opportunistic Factory Scheduling System","author":"FS Smith","year":"1989","unstructured":"Smith, F. S., Ow, P. S., Matthys, D. C, Potvin, J. Y.: \u201cOPIS: An Opportunistic Factory Scheduling System\u201d, Carnegie-Mellon University Pittsburgh, U. S. A., 1989."},{"key":"42_CR11","volume-title":"Einf\u00fchrung in die allgemeine Betriebswirtschaftslehre","author":"G W\u00f6he","year":"1986","unstructured":"W\u00f6he, G.: \u201cEinf\u00fchrung in die allgemeine Betriebswirtschaftslehre\u201d, 16. Aufl., Verlag Vahlen, 1986.","edition":"16"}],"container-title":["Informatik aktuell","Information als Produktionsfaktor"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-77810-0_42.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,6]],"date-time":"2021-05-06T12:55:41Z","timestamp":1620305741000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-77810-0_42"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1992]]},"ISBN":["9783540559603","9783642778100"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-77810-0_42","relation":{},"ISSN":["1431-472X"],"issn-type":[{"type":"print","value":"1431-472X"}],"subject":[],"published":{"date-parts":[[1992]]}}}