{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,5,4]],"date-time":"2025-05-04T17:10:07Z","timestamp":1746378607704,"version":"3.40.4"},"publisher-location":"Cham","reference-count":40,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319125671"},{"type":"electronic","value":"9783319125688"}],"license":[{"start":{"date-parts":[[2014,1,1]],"date-time":"2014-01-01T00:00:00Z","timestamp":1388534400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-662-44654-6_33","type":"book-chapter","created":{"date-parts":[[2014,9,15]],"date-time":"2014-09-15T01:13:21Z","timestamp":1410743601000},"page":"335-343","source":"Crossref","is-referenced-by-count":2,"title":["Application of Evolutionary Algorithms in Project Management"],"prefix":"10.1007","author":[{"given":"Christos","family":"Kyriklidis","sequence":"first","affiliation":[]},{"given":"Georgios","family":"Dounias","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"33_CR1","unstructured":"Holsapple, C.W., Jacob, V.S., Whinston, A.B.: Operations Research and Artificial Intelligence. Ablex Publishing Corporation (1994)"},{"key":"33_CR2","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1007\/s10489-010-0248-x","volume":"36","author":"S.-M. Soak","year":"2012","unstructured":"Soak, S.-M., Lee, S.-W.: A memetic algorithm for the quadratic multiple container packing problem. Applied Intelligence\u00a036, 119\u2013135 (2012)","journal-title":"Applied Intelligence"},{"key":"33_CR3","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1007\/s10489-005-4604-1","volume":"23","author":"M.G. Ippolito","year":"2005","unstructured":"Ippolito, M.G., Morana, G., Riva Sanseverino, E., Vuinovich, F.: Ant Colony Search Algorithm for Optimal Strategical Planning of Electrical Distribution Systems Expansion. Applied Intelligence\u00a023, 139\u2013152 (2005)","journal-title":"Applied Intelligence"},{"key":"33_CR4","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1007\/s10489-006-0019-x","volume":"26","author":"A. Lim","year":"2007","unstructured":"Lim, A., Lin, J., Xiao, F.: Particle Swarm Optimization and Hill Climbing for the bandwidth minimization problem. Applied Intelligence\u00a026, 175\u2013182 (2007)","journal-title":"Applied Intelligence"},{"key":"33_CR5","doi-asserted-by":"publisher","first-page":"591","DOI":"10.1016\/S0377-2217(98)00272-0","volume":"117","author":"K. Neumann","year":"1999","unstructured":"Neumann, K., Zimmermann, J.: Resource levelling for projects with schedule-dependent time windows. European Journal of Operational Research\u00a0117, 591\u2013605 (1999)","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"33_CR6","doi-asserted-by":"publisher","first-page":"167","DOI":"10.1061\/(ASCE)0733-9364(1999)125:3(167)","volume":"125","author":"T. Hegazy","year":"1999","unstructured":"Hegazy, T.: Optimization of Resource Allocation and Leveling using Genetic Algorithm. Journal of Construction Engineering and Management\u00a0125(3), 167\u2013175 (1999)","journal-title":"Journal of Construction Engineering and Management"},{"key":"33_CR7","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0360-8352(96)00116-7","volume":"31","author":"M.A. Younis","year":"1996","unstructured":"Younis, M.A., Saad, B.: Optimal resource leveling of multi-resource projects. Computers and Industrial Engineering\u00a031, 1\u20134 (1996)","journal-title":"Computers and Industrial Engineering"},{"key":"33_CR8","doi-asserted-by":"publisher","first-page":"415","DOI":"10.1016\/S0360-8352(98)00122-3","volume":"35","author":"M.H. Elwany","year":"1998","unstructured":"Elwany, M.H., Korish, I.E., Barakat, M.A., Hafez, S.M.: Resource smoothening in repetitive projects. Computers and Industrial Engineering\u00a035, 415\u2013418 (1998)","journal-title":"Computers and Industrial Engineering"},{"key":"33_CR9","doi-asserted-by":"publisher","first-page":"125","DOI":"10.1061\/(ASCE)0733-9364(1996)122:2(125)","volume":"122","author":"W.T. Chan","year":"1996","unstructured":"Chan, W.T., Chua, D.K.H., Kannan, G.: Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management\u00a0122, 125\u2013132 (1996)","journal-title":"Journal of Construction Engineering and Management"},{"key":"33_CR10","doi-asserted-by":"publisher","first-page":"2300","DOI":"10.1016\/j.camwa.2010.09.058","volume":"61","author":"J.Q. Geng","year":"2011","unstructured":"Geng, J.Q., Weng, L.P., Liu, S.H.: An improved ant colony optimization algorithm for nonlinear resource-leveling problems. Computers and Mathematics with Applications\u00a061, 2300\u20132305 (2011)","journal-title":"Computers and Mathematics with Applications"},{"issue":"2","key":"33_CR11","first-page":"76","volume":"13","author":"A. Burges","year":"1962","unstructured":"Burges, A., Killebrew, J.: Variation in activity level in a cyclical arrow diagram. Journal of Industrial Engineering\u00a013(2), 76\u201383 (1962)","journal-title":"Journal of Industrial Engineering"},{"issue":"1","key":"33_CR12","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1061\/JCCEAZ.0000122","volume":"91","author":"R. Galbreath","year":"1965","unstructured":"Galbreath, R.: Computer program for leveling resource usage. J. Constr. Div., ASCE\u00a091(1), 107\u2013124 (1965)","journal-title":"J. Constr. Div., ASCE"},{"key":"33_CR13","volume-title":"The critical path method","author":"L. Shaffer","year":"1965","unstructured":"Shaffer, L., Ritter, J., Mayer, W.: The critical path method. McGraw- Hill Book C, NY (1965)"},{"key":"33_CR14","volume-title":"A Management Guide to PERT\/CPM","author":"J.D. Wiest","year":"1977","unstructured":"Wiest, J.D., Levy, F.K.: A Management Guide to PERT\/CPM. Prentice-Hall, NJ (1977)"},{"issue":"2","key":"33_CR15","doi-asserted-by":"publisher","first-page":"331","DOI":"10.1061\/(ASCE)0733-9364(1990)116:2(331)","volume":"116","author":"R.B. Harris","year":"1990","unstructured":"Harris, R.B.: Packing method for resource leveling _PACK. Journal of Construction Engineering and Management, ASCE\u00a0116(2), 331\u2013350 (1990)","journal-title":"Journal of Construction Engineering and Management, ASCE"},{"key":"33_CR16","unstructured":"Antill, J.M., Woodhead, R.W.: Critical Path Methods in Construction Practice, 3rd edn. Wiley (1982)"},{"key":"33_CR17","volume-title":"Project Management with CPM, PERT and Precedence Diagramming","author":"J.J. Moder","year":"1983","unstructured":"Moder, J.J., Philips, C.R., Davis, E.W.: Project Management with CPM, PERT and Precedence Diagramming, 3rd edn. Van Nostrand-Reinhold, New York (1983)","edition":"3"},{"key":"33_CR18","doi-asserted-by":"publisher","first-page":"425","DOI":"10.1016\/S0377-2217(99)00498-1","volume":"127","author":"K. Neumann","year":"2000","unstructured":"Neumann, K., Zimmermann, J.: Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research\u00a0127, 425\u2013443 (2000)","journal-title":"European Journal of Operational Research"},{"key":"33_CR19","doi-asserted-by":"publisher","first-page":"420","DOI":"10.1061\/(ASCE)0733-9364(1999)125:6(420)","volume":"125","author":"S.S. Leu","year":"1999","unstructured":"Leu, S.S., Yang, C.H.: GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering & Management\u00a0125, 420\u2013427 (1999)","journal-title":"Journal of Construction Engineering & Management"},{"key":"33_CR20","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1139\/l02-007","volume":"29","author":"S.S. Leu","year":"2002","unstructured":"Leu, S.S., Hung, T.H.: An optimal construction resource leveling scheduling simulation model. Canadian Journal of Civil Engineering\u00a029, 267\u2013275 (2002)","journal-title":"Canadian Journal of Civil Engineering"},{"key":"33_CR21","first-page":"1916","volume":"5","author":"J.W. Huang","year":"2010","unstructured":"Huang, J.W., Wang, X.X., Chen, R.: Genetic algorithms for optimization of resource Allocation in Large Scale Construction Project Management. Journal of Computers\u00a05, 1916\u20131924 (2010)","journal-title":"Journal of Computers"},{"key":"33_CR22","first-page":"643","volume":"16","author":"J.H. Li","year":"2010","unstructured":"Li, J.H.: Combination of genetic & ant colony algorithms for multi-project resource leveling problem. Jisuanji Jicheng Zhizao Xitong\/Computer Integrated Manufacturing Systems, CIMS\u00a016, 643\u2013649 (2010)","journal-title":"Jisuanji Jicheng Zhizao Xitong\/Computer Integrated Manufacturing Systems, CIMS"},{"key":"33_CR23","doi-asserted-by":"crossref","unstructured":"Zhou, L., Peng, W., Zhang, Z.: An ant colony system for solving resource leveling problem. In: International Conference on Intelligent Computation Technology & Automation (ICICTA), China, pp. 489\u2013492 (2010)","DOI":"10.1109\/ICICTA.2010.694"},{"key":"33_CR24","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1016\/S0926-5805(99)00011-4","volume":"10","author":"S.S. Leu","year":"2000","unstructured":"Leu, S.S., Yang, C.H., Huang, J.C.: Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. Automation in Construction\u00a010, 27\u201341 (2000)","journal-title":"Automation in Construction"},{"key":"33_CR25","first-page":"24","volume":"21","author":"S.X. Liu","year":"2001","unstructured":"Liu, S.X., Wang, M.G.: Genetic algorithm for resource leveling problem in project scheduling. Xitong Gongcheng Lilun yu Shijian\/System Engineering Theory and Practice\u00a021, 24 (2001)","journal-title":"Xitong Gongcheng Lilun yu Shijian\/System Engineering Theory and Practice"},{"key":"33_CR26","doi-asserted-by":"publisher","first-page":"869","DOI":"10.1061\/(ASCE)0733-9364(2004)130:6(869)","volume":"130","author":"A.B. Senouci","year":"2004","unstructured":"Senouci, A.B., Eldin, N.N.: Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management\u00a0130, 869\u2013877 (2004)","journal-title":"Journal of Construction Engineering and Management"},{"key":"33_CR27","first-page":"93","volume":"40","author":"Z.Y. Chen","year":"2007","unstructured":"Chen, Z.Y., Du, Z.D., Zhou, H.: Research on the unlimited resource leveling optimization with PSO. Tumu Gongcheng Xuebao\/China Civil Engineering Journal\u00a040, 93\u201396 (2007)","journal-title":"Tumu Gongcheng Xuebao\/China Civil Engineering Journal"},{"key":"33_CR28","first-page":"789","volume":"25","author":"X. Guo","year":"2010","unstructured":"Guo, X., Li, N., Li, X.S.: Multi-resource leveling in multiple projects and vector evaluated particle swarm optimization based on Pareto. Kongzhi yu Juece\/Control and Decision\u00a025, 789\u2013793 (2010)","journal-title":"Kongzhi yu Juece\/Control and Decision"},{"key":"33_CR29","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1017\/S0890060498123053","volume":"12","author":"N. Kartam","year":"1998","unstructured":"Kartam, N., Tongthong, T.: An artificial neural network for resource leveling problems. Artificial Intelligence for Engineering Design, Analysis and Manufacturing: AIEDAM\u00a012, 273\u2013287 (1998)","journal-title":"Artificial Intelligence for Engineering Design, Analysis and Manufacturing: AIEDAM"},{"key":"33_CR30","doi-asserted-by":"publisher","first-page":"516","DOI":"10.1007\/s001700070059","volume":"16","author":"V.A. Jeetendra","year":"2000","unstructured":"Jeetendra, V.A., Krishnaiah, C.O.V., Prashanth, R.: Petri nets for project management and resource levelling. International Journal of Advanced Manufacturing Technology\u00a016, 516\u2013520 (2000)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"33_CR31","doi-asserted-by":"publisher","first-page":"317","DOI":"10.3844\/ajassp.2007.317.322","volume":"4","author":"K. Raja","year":"2007","unstructured":"Raja, K., Kumanan, S.: Resource leveling using Petrinet and memetic approach. American Journal of Applied Sciences\u00a04, 317\u2013322 (2007)","journal-title":"American Journal of Applied Sciences"},{"key":"33_CR32","doi-asserted-by":"crossref","unstructured":"Pang, N., Shi, Y., You, Y.: Resource Leveling Optimization of Network Schedule Based on Particle Swarm Optimization with Constriction Factor. In: International Conference on Advanced Computer Theory and Engineering, pp. 652\u2013656 (2008)","DOI":"10.1109\/ICACTE.2008.124"},{"key":"33_CR33","doi-asserted-by":"publisher","first-page":"187","DOI":"10.1002\/nav.3800300202","volume":"30","author":"R.C. Leachman","year":"1983","unstructured":"Leachman, R.C.: Multiple Resource Leveling in Construction Systems Through Variation of Activity Intensities. Naval Research Logistic Quarterly\u00a030, 187\u2013198 (1983)","journal-title":"Naval Research Logistic Quarterly"},{"issue":"8","key":"33_CR34","doi-asserted-by":"publisher","first-page":"775","DOI":"10.1080\/095372800750038373","volume":"11","author":"E.O.P. Akpan","year":"2000","unstructured":"Akpan, E.O.P.: Resource smoothing: A cost minimization approach. Production Planning and Control\u00a011(8), 775\u2013780 (2000)","journal-title":"Production Planning and Control"},{"key":"33_CR35","doi-asserted-by":"crossref","unstructured":"Zhao, S.-L., Liu, Y., Zhao, H.-M., Zhou, R.-L.: GA based resource leveling optimization for construction project. In: Proceedings of the Fifth International Conference on Machine Learning and Cybernetics, Dalian, pp. 2363\u20132367 (2006)","DOI":"10.1109\/ICMLC.2006.258726"},{"key":"33_CR36","unstructured":"Xiong, Y., Kuang, Y.P.: Ant colony optimization algorithm for resource leveling problem of contruction problem. In: The CRIOCM 2006 International Symposium on: \u201cAdvancement of Construction Management and Real Estate\u201d (2006)"},{"key":"33_CR37","first-page":"289","volume":"4","author":"J. Roca","year":"2008","unstructured":"Roca, J., Pugnaghi, E., Libert, G.: Solving an Extended Resource Leveling Problem with Multiobjective Evolutionary Algorithms. International Journal of Computational Intelligence\u00a04, 289\u2013300 (2008)","journal-title":"International Journal of Computational Intelligence"},{"key":"33_CR38","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1080\/01446190903369907","volume":"28","author":"K.P. Anagnostopoulos","year":"2010","unstructured":"Anagnostopoulos, K.P., Kouklinas, G.: A simulated annealing hyperheuristic for construction resource leveling. Construction Management and Economics\u00a028, 163\u2013175 (2010)","journal-title":"Construction Management and Economics"},{"issue":"1","key":"33_CR39","doi-asserted-by":"publisher","first-page":"66","DOI":"10.1038\/scientificamerican0792-66","volume":"267","author":"J.H. Holland","year":"1992","unstructured":"Holland, J.H.: Genetic Algorithms. Scientific American\u00a0267(1), 66\u201372 (1992)","journal-title":"Scientific American"},{"issue":"2","key":"33_CR40","doi-asserted-by":"publisher","first-page":"461","DOI":"10.3130\/jaabe.4.461","volume":"4","author":"J. Kim","year":"2005","unstructured":"Kim, J., Kim, K., Jee, N., Yoon, Y.: Enhanced Resource Leveling Technique for Resource Scheduling. Journal of Asian Architecture and Building Engineering\u00a04(2), 461\u2013466 (2005)","journal-title":"Journal of Asian Architecture and Building Engineering"}],"container-title":["Lecture Notes in Computer Science","Progress in Pattern Recognition, Image Analysis, Computer Vision, and Applications"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-662-44654-6_33","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,5,4]],"date-time":"2025-05-04T16:32:25Z","timestamp":1746376345000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-662-44654-6_33"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783319125671","9783319125688"],"references-count":40,"URL":"https:\/\/doi.org\/10.1007\/978-3-662-44654-6_33","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2014]]}}}