{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T20:04:45Z","timestamp":1743019485176,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":14,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783662447321"},{"type":"electronic","value":"9783662447338"}],"license":[{"start":{"date-parts":[[2014,1,1]],"date-time":"2014-01-01T00:00:00Z","timestamp":1388534400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-662-44733-8_35","type":"book-chapter","created":{"date-parts":[[2014,8,25]],"date-time":"2014-08-25T22:56:37Z","timestamp":1409007397000},"page":"280-287","source":"Crossref","is-referenced-by-count":0,"title":["Flow Disturbance Analysis in Workshops with High Reworks Rate"],"prefix":"10.1007","author":[{"given":"M\u00e9lanie","family":"Noyel","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Philippe","family":"Thomas","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Andr\u00e9","family":"Thomas","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Patrick","family":"Charpentier","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Thomas","family":"Brault","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"35_CR1","unstructured":"Abouzahir, O., Gautier, R., Gidel, T.: Pilotage de l\u2019am\u00e9lioration des process par les co\u00fbts de non-qualit\u00e9. In: 10i\u00e8me S\u00e9minaire CONFERE, Belfort, France, Juillet 3-4 (2003)"},{"issue":"3","key":"35_CR2","doi-asserted-by":"publisher","first-page":"375","DOI":"10.1007\/BF03167589","volume":"21","author":"S.W. Chiu","year":"2004","unstructured":"Chiu, S.W., Gong, D.C., Wee, H.M.: Effects of random defective rate and imperfect rework process on economic production quantity model. Japan Journal of Industrial and Applied Mathematics\u00a021(3), 375\u2013389 (2004)","journal-title":"Japan Journal of Industrial and Applied Mathematics"},{"issue":"12","key":"35_CR3","first-page":"979","volume":"66","author":"S.W. Chiu","year":"2007","unstructured":"Chiu, S.W.: Production run time problem with machine breakdowns under AR control policy and rework. Journal of Scientific and Industrial Research\u00a066(12), 979 (2007)","journal-title":"Journal of Scientific and Industrial Research"},{"issue":"3","key":"35_CR4","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1080\/13873950902808602","volume":"15","author":"S.W. Chiu","year":"2009","unstructured":"Chiu, S.W., Chen, K.K., Yang, J.C.: Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown. Mathematical and Computer Modelling of Dynamical Systems\u00a015(3), 255\u2013274 (2009)","journal-title":"Mathematical and Computer Modelling of Dynamical Systems"},{"issue":"1","key":"35_CR5","doi-asserted-by":"publisher","first-page":"453","DOI":"10.1016\/S0007-8506(07)60457-0","volume":"55","author":"M. Colledani","year":"2006","unstructured":"Colledani, M., Tolio, T.: Impact of quality control on production system performance. CIRP Annals-Manufacturing-Technology\u00a055(1), 453\u2013456 (2006)","journal-title":"CIRP Annals-Manufacturing-Technology"},{"key":"35_CR6","volume-title":"Quality control: Principles, practice and administration: An industrial management tool for improving product quality and design and for reducing operating costs and losses","author":"A.V. Feigenbaum","year":"1951","unstructured":"Feigenbaum, A.V.: Quality control: Principles, practice and administration: An industrial management tool for improving product quality and design and for reducing operating costs and losses. McGraw-Hill, New York (1951)"},{"issue":"1","key":"35_CR7","first-page":"25","volume":"26","author":"D. Garvin","year":"1984","unstructured":"Garvin, D.: What does product quality really mean. Sloan Management Review\u00a026(1), 25\u201348 (1984)","journal-title":"Sloan Management Review"},{"issue":"1","key":"35_CR8","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0969-7012(98)00017-3","volume":"5","author":"P.E.D. Love","year":"1999","unstructured":"Love, P.E.D., Li, H., Mandal, P.: Rework: a symptom of a dysfunctional supply chain. European Journal of Purchasing & Supply Management\u00a05(1), 1\u201311 (1999)","journal-title":"European Journal of Purchasing & Supply Management"},{"key":"35_CR9","unstructured":"Noyel, M., Thomas, P., Charpentier, P., Thomas, A., Brault, T.: Implantation of an on-line quality process monitoring. In: 5th International Conference on Industrial Engineering and Systems Management, IESM 2013, Rabat, Maroc, Octobre 28-30 (2013)"},{"issue":"24","key":"35_CR10","doi-asserted-by":"publisher","first-page":"7428","DOI":"10.1080\/00207543.2011.652747","volume":"50","author":"M. Rabiee","year":"2012","unstructured":"Rabiee, M., Zandies, M., Jafarian, A.: Scheduling a no-wait two-machine flow shop with sequence-dependent setup times and probable rework using robust meta-heuristics. International Journal of Production Research\u00a050(24), 7428\u20137446 (2012)","journal-title":"International Journal of Production Research"},{"issue":"2","key":"35_CR11","doi-asserted-by":"publisher","first-page":"188","DOI":"10.1080\/07408178508975291","volume":"17","author":"A. Skidmann","year":"1985","unstructured":"Skidmann, A., Nof, S.Y.: Unitary manufacturing cell design with random product feedback flow. IIE Transactions\u00a017(2), 188\u2013193 (1985)","journal-title":"IIE Transactions"},{"issue":"6","key":"35_CR12","doi-asserted-by":"publisher","first-page":"1171","DOI":"10.1080\/00207548508904774","volume":"23","author":"A. Skidmann","year":"1985","unstructured":"Skidmann, A., Schweitzer, P., Nof, S.Y.: Performance evaluation of a flexible manufacturing cell with random multiproduct feedback flow. International Journal of Production Research\u00a023(6), 1171\u20131184 (1985)","journal-title":"International Journal of Production Research"},{"issue":"1","key":"35_CR13","doi-asserted-by":"publisher","first-page":"111","DOI":"10.1016\/j.ejor.2003.08.042","volume":"161","author":"A. Thomas","year":"2005","unstructured":"Thomas, A., Charpentier, P.: Reducing simulation models for scheduling manufacturing facilities. European Journal of Operational Research\u00a0161(1), 111\u2013125 (2005)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"35_CR14","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1016\/0360-8352(95)00078-F","volume":"29","author":"A.M. Zargar","year":"1995","unstructured":"Zargar, A.M.: Effect of rework strategies on cycle time. Computers & Industrial Engineering\u00a029(1), 239\u2013243 (1995)","journal-title":"Computers & Industrial Engineering"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-662-44733-8_35","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,20]],"date-time":"2019-05-20T14:05:00Z","timestamp":1558361100000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-662-44733-8_35"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783662447321","9783662447338"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/978-3-662-44733-8_35","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2014]]}}}