{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T02:30:07Z","timestamp":1743042607936,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":15,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783662452363"},{"type":"electronic","value":"9783662452370"}],"license":[{"start":{"date-parts":[[2014,1,1]],"date-time":"2014-01-01T00:00:00Z","timestamp":1388534400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-662-45237-0_35","type":"book-chapter","created":{"date-parts":[[2014,10,25]],"date-time":"2014-10-25T10:37:20Z","timestamp":1414233440000},"page":"375-386","source":"Crossref","is-referenced-by-count":10,"title":["Event Based Approaches for Solving Multi-mode Resource Constraints Project Scheduling Problem"],"prefix":"10.1007","author":[{"given":"Ripon Kumar","family":"Chakrabortty","sequence":"first","affiliation":[]},{"given":"Ruhul Amin","family":"Sarker","sequence":"additional","affiliation":[]},{"given":"Daryl L.","family":"Essam","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"1","key":"35_CR1","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S. Hartmann","year":"2010","unstructured":"Hartmann, S., Briskorn, D.: A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research\u00a0207(1), 1\u201314 (2010)","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"35_CR2","doi-asserted-by":"publisher","first-page":"2101","DOI":"10.1002\/aic.11522","volume":"54","author":"J.C. Zapata","year":"2008","unstructured":"Zapata, J.C., Hodge, B.M., Reklaitis, G.V.: The multimode resource constrained multiproject scheduling problem: Alternative formulations. AIChE Journal\u00a054(8), 2101\u20132119 (2008)","journal-title":"AIChE Journal"},{"issue":"1-2","key":"35_CR3","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1007\/s10696-012-9152-5","volume":"25","author":"O. Kon\u00e9","year":"2013","unstructured":"Kon\u00e9, O., Artigues, C., Lopez, P., Mongeau, M.: Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources. Flexible Services and Manufacturing Journal\u00a025(1-2), 25\u201347 (2013)","journal-title":"Flexible Services and Manufacturing Journal"},{"issue":"1","key":"35_CR4","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1287\/mnsc.16.1.93","volume":"16","author":"A.A.B. Pritsker","year":"1969","unstructured":"Pritsker, A.A.B., Waiters, L.J., Wolfe, P.M.: Multiproject scheduling with limited resources: A zero-one programming approach. Management Science\u00a016(1), 93\u2013108 (1969)","journal-title":"Management Science"},{"issue":"2","key":"35_CR5","doi-asserted-by":"publisher","first-page":"322","DOI":"10.1016\/S0377-2217(97)00442-6","volume":"112","author":"R. Klein","year":"1999","unstructured":"Klein, R., Scholl, A.: Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling. European Journal of Operational Research\u00a0112(2), 322\u2013346 (1999)","journal-title":"European Journal of Operational Research"},{"key":"35_CR6","unstructured":"Lawler, E.L.: Combinatorial optimization: networks and matroids. Courier Dover Publications (1976)"},{"issue":"3","key":"35_CR7","doi-asserted-by":"publisher","first-page":"257","DOI":"10.1007\/s11227-007-0158-9","volume":"44","author":"M. Sabzehparvar","year":"2007","unstructured":"Sabzehparvar, M., Seyed-Hosseini, S.M.: A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags. The Journal of Supercomputing\u00a044(3), 257\u2013273 (2007)","journal-title":"The Journal of Supercomputing"},{"issue":"2","key":"35_CR8","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1016\/j.ejor.2004.04.002","volume":"165","author":"W. Herroelen","year":"2005","unstructured":"Herroelen, W., Leus, R.: Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research\u00a0165(2), 289\u2013306 (2005)","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"35_CR9","doi-asserted-by":"publisher","first-page":"614","DOI":"10.1057\/palgrave.jors.2601563","volume":"54","author":"J. Alcaraz","year":"2003","unstructured":"Alcaraz, J., Maroto, C., Ruiz, R.: Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms. Journal of the Operational Research Society\u00a054(6), 614\u2013626 (2003)","journal-title":"Journal of the Operational Research Society"},{"issue":"1","key":"35_CR10","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/j.cor.2009.12.011","volume":"38","author":"O. Kon\u00e9","year":"2011","unstructured":"Kon\u00e9, O., Artigues, C., Lopez, P., Mongeau, M.: Event-based MILP models for resource-constrained project scheduling problems. Computers & Operations Research\u00a038(1), 3\u201313 (2011)","journal-title":"Computers & Operations Research"},{"key":"35_CR11","doi-asserted-by":"crossref","unstructured":"Pinto, J., Grossmann, I.: A continuous time MILP model for short term scheduling of batch plants with pre-ordering constraints. Computers & Chemical Engineering, 20, S1197\u2013S1202 (1996)","DOI":"10.1016\/0098-1354(96)00207-4"},{"issue":"4","key":"35_CR12","doi-asserted-by":"publisher","first-page":"538","DOI":"10.1287\/moor.8.4.538","volume":"8","author":"H.W. Lenstra Jr","year":"1983","unstructured":"Lenstra Jr, H.W.: Integer programming with a fixed number of variables. Mathematics of Operations Research\u00a08(4), 538\u2013548 (1983)","journal-title":"Mathematics of Operations Research"},{"key":"35_CR13","unstructured":"Be\u015fik\u00e7i, U., Bilge, \u00dc., Ulusoy, G.: Different resource management policies in multi-mode resource constrained multi-project scheduling. In: 2011 World Congress on Engineering and Technology, Shanghai, China (2011)"},{"issue":"10","key":"35_CR14","doi-asserted-by":"publisher","first-page":"1197","DOI":"10.1287\/mnsc.28.10.1197","volume":"28","author":"F.B. Talbot","year":"1982","unstructured":"Talbot, F.B.: Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case. Management Science\u00a028(10), 1197\u20131210 (1982)","journal-title":"Management Science"},{"issue":"10","key":"35_CR15","doi-asserted-by":"publisher","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R. Kolisch","year":"1995","unstructured":"Kolisch, R., Sprecher, A., Drexl, A.: Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science\u00a041(10), 1693\u20131703 (1995)","journal-title":"Management Science"}],"container-title":["Lecture Notes in Computer Science","Computer Information Systems and Industrial Management"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-662-45237-0_35","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,28]],"date-time":"2019-05-28T05:23:57Z","timestamp":1559021037000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-662-45237-0_35"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783662452363","9783662452370"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-662-45237-0_35","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2014]]}}}