{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,8]],"date-time":"2024-09-08T14:25:51Z","timestamp":1725805551162},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783662452882"},{"type":"electronic","value":"9783662452899"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-662-45289-9_29","type":"book-chapter","created":{"date-parts":[[2014,9,25]],"date-time":"2014-09-25T21:12:51Z","timestamp":1411679571000},"page":"333-344","source":"Crossref","is-referenced-by-count":1,"title":["Gantt Chart Simulation for FAB Scheduling"],"prefix":"10.1007","author":[{"given":"Taedong","family":"Kim","sequence":"first","affiliation":[]},{"given":"Byoung K.","family":"Choi","sequence":"additional","affiliation":[]},{"given":"Keyhoon","family":"Ko","sequence":"additional","affiliation":[]},{"given":"Donghun","family":"Kang","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"29_CR1","doi-asserted-by":"publisher","first-page":"1163","DOI":"10.1007\/s00170-004-2296-z","volume":"27","author":"A.K. Gupta","year":"2006","unstructured":"Gupta, A.K., Sivakumar, A.I.: Job Shop Scheduling Techniques in Semiconductor Manufacturing. International Journal of Advanced Manufacturing Technology\u00a027, 1163\u20131169 (2006)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"29_CR2","doi-asserted-by":"publisher","first-page":"583","DOI":"10.1007\/s10951-010-0222-9","volume":"14","author":"L. Monch","year":"2011","unstructured":"Monch, L., Fowler, J.W., Dauzere-Peres, S., Mason, S.J., Rose, O.: A Survey of Problems, Solution Techniques, and Future Challenges in Scheduling Semiconductor Manufacturing Operations. Journal of Scheduling\u00a014, 583\u2013599 (2011)","journal-title":"Journal of Scheduling"},{"key":"29_CR3","doi-asserted-by":"publisher","first-page":"298","DOI":"10.1016\/0377-2217(87)90243-8","volume":"29","author":"J. Carlier","year":"1987","unstructured":"Carlier, J.: Scheduling Jobs with Release Dates and Tails on Identical Machines to Minimize the Makespan. European Journal of Operational Research\u00a029, 298\u2013306 (1987)","journal-title":"European Journal of Operational Research"},{"key":"29_CR4","doi-asserted-by":"publisher","first-page":"6814","DOI":"10.1016\/j.eswa.2010.12.064","volume":"38","author":"S. Balin","year":"2011","unstructured":"Balin, S.: Non-identical Parallel Machine Scheduling using Genetic Algorithm. Expert Systems with Applications\u00a038, 6814\u20136821 (2011)","journal-title":"Expert Systems with Applications"},{"key":"29_CR5","doi-asserted-by":"crossref","unstructured":"Cakar, T., Koker, R., Sari, Y.: Parallel Robot Scheduling to Minimize Mean Tardiness with Unequal Release Date and Precedence Constraints using a Hybrid Intelligent System. International Journal of Advanced Robotic Systems\u00a09 (2012), \n                    \n                      http:\/\/cdn.intechopen.com\/pdfs\/41481.pdf","DOI":"10.5772\/54381"},{"key":"29_CR6","unstructured":"Acosta, J.H.T., Gonzalez, V.A.P., Bello, C.A.L.: A Genetic Algorithm for Simultaneous Scheduling Problem in Flexible Flow Shop Environments with Unrelated Parallel Machines, Setup Time and Multiple Criteria. In: Archenti, A., Maffei, A. (eds.) International Conference on Advanced Manufacturing Engineering and Technologies, pp. 203\u2013210 (2013)"},{"issue":"6","key":"29_CR7","doi-asserted-by":"publisher","first-page":"1425","DOI":"10.1080\/00207540701486082","volume":"47","author":"V. Vinod","year":"2009","unstructured":"Vinod, V., Sridharan, R.: Simulation-based Metamodels for Scheduling a Dynamic Job Shop with Sequence-dependent Setup Times. International Journal of Production Research\u00a047(6), 1425\u20131447 (2009)","journal-title":"International Journal of Production Research"},{"key":"29_CR8","doi-asserted-by":"publisher","first-page":"2271","DOI":"10.1109\/WSC.2008.4736330","volume-title":"2008 Winter Simulation Conference","author":"B.C. Park","year":"2008","unstructured":"Park, B.C., Park, E.S., Kim, B.H., Choi, B.K., Lee, J.H.: Simulation Based Planning and Scheduling Systems for TFT-LCD FAB. In: Mason, S.J., Hill, R.R., M\u00f6nch, L., Rose, O., Jefferson, T., Fowler, J.W. (eds.) 2008 Winter Simulation Conference, pp. 2271\u20132276. IEEE Press, New York (2008)"},{"key":"29_CR9","doi-asserted-by":"publisher","first-page":"40","DOI":"10.1109\/WSC.2010.5679175","volume-title":"2010 Winter Simulation Conference","author":"K. Ko","year":"2010","unstructured":"Ko, K., Yoo, S.K., Kim, B.H., Park, B.C., Park, E.S.: Simulation Based FAB Scheduler: SeePlan\u00ae. In: Johansson, B., Jain, S., Montoya-Torres, J., Hugan, J., Y\u00fccesan, E. (eds.) 2010 Winter Simulation Conference, pp. 40\u201348. IEEE Press, New York (2010)"},{"key":"29_CR10","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1016\/0305-0483(90)90017-4","volume":"18","author":"R. Ramasesh","year":"1990","unstructured":"Ramasesh, R.: Dynamic Job Shop Scheduling: a Survey of Simulation Research. Omega\u00a018, 43\u201357 (1990)","journal-title":"Omega"},{"issue":"4","key":"29_CR11","doi-asserted-by":"publisher","first-page":"383","DOI":"10.1080\/09511920500407541","volume":"19","author":"B.K. Choi","year":"2006","unstructured":"Choi, B.K., You, N.K.: Dispatching Rules for Dynamic Scheduling of One-of-a-kind Production. International Journal of Computer Integrated Manufacturing\u00a019(4), 383\u2013392 (2006)","journal-title":"International Journal of Computer Integrated Manufacturing"}],"container-title":["Communications in Computer and Information Science","AsiaSim 2014"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-662-45289-9_29","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,1,20]],"date-time":"2019-01-20T19:08:49Z","timestamp":1548011329000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-662-45289-9_29"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783662452882","9783662452899"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/978-3-662-45289-9_29","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2014]]}}}