{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,8]],"date-time":"2026-02-08T20:27:54Z","timestamp":1770582474035,"version":"3.49.0"},"publisher-location":"Berlin, Heidelberg","reference-count":15,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783662459362","type":"print"},{"value":"9783662459379","type":"electronic"}],"license":[{"start":{"date-parts":[[2014,1,1]],"date-time":"2014-01-01T00:00:00Z","timestamp":1388534400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014]]},"DOI":"10.1007\/978-3-662-45937-9_37","type":"book-chapter","created":{"date-parts":[[2014,12,17]],"date-time":"2014-12-17T08:41:35Z","timestamp":1418805695000},"page":"377-386","source":"Crossref","is-referenced-by-count":1,"title":["Future Product Development Cost Prediction Model for Integrated Lifecycle Assessment"],"prefix":"10.1007","author":[{"given":"Jan","family":"Erik Heller","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Manuel","family":"L\u00f6wer","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"J\u00f6rg","family":"Feldhusen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"37_CR1","volume-title":"Feature-basiertes Konstruieren und Kalkulieren","author":"M. Wolfram","year":"1994","unstructured":"Wolfram, M.: Feature-basiertes Konstruieren und Kalkulieren. Hanser, M\u00fcnchen (1994)"},{"key":"37_CR2","unstructured":"Reischl, C.: Simul. von Produktkosten in der Entwicklungsphase. Diss. TU M\u00fcnchen (2001)"},{"key":"37_CR3","volume-title":"Kosteng\u00fcnstig Entwickeln und Konstruieren: Kostenmanagement bei der integrierten Produktentwicklung","author":"K. Ehrlenspiel","year":"2007","unstructured":"Ehrlenspiel, K., Kiewert, A., Lindemann, U.: Kosteng\u00fcnstig Entwickeln und Konstruieren: Kostenmanagement bei der integrierten Produktentwicklung. Springer, Berlin (2007)"},{"key":"37_CR4","unstructured":"Feldhusen, J., et al.: Methode zur Produktivit\u00e4tsmessung f\u00fcr Entw. und Konstr. Konstruktion, pp. 49\u201354 (2002)"},{"key":"37_CR5","unstructured":"Hichert, R.: Praktische Ans\u00e4tze zur Termin-, Kapazit\u00e4ts- und Kostenplanung in Entwicklung u. Konstruktion. In: Moll, H.H. (ed.) RKW-Handbuch Forschung, Entw. Schmidt, Berlin (1976)"},{"key":"37_CR6","volume-title":"Software Engineering Economics","author":"B. Boehm","year":"1981","unstructured":"Boehm, B.: Software Engineering Economics. Prentice-Hall, Englewood Cliffs (1981)"},{"key":"37_CR7","unstructured":"Boehm, B., Abts, C., et al.: Software Cost Estimation with COCOMO II. Prentice Hall (2000)"},{"key":"37_CR8","unstructured":"Feldhusen, J., et al.: Progn. des Entwicklungsaufwands: Adaption des COCOMO Modells auf die Produktentwicklung. In: Br\u00f6kel, K., et al. (eds.) Proceedings KT 2010. docupoint (2010)"},{"key":"37_CR9","unstructured":"Hauschild, J., Schlaak, T.: Zur Messung des Innovationsgrades neuartiger Produkte. Zeit-schrift f\u00fcr Betriebswirtschaft 71 (2001)"},{"key":"37_CR10","series-title":"AIAA Education Series","volume-title":"Aircraft Design: A Conceptual Approach","author":"D.. Raymer","year":"2006","unstructured":"Raymer, D.: Aircraft Design: A Conceptual Approach, 4th edn. AIAA Education Series. American Institute of Aeronautics and Astronautics, Reston (2006)","edition":"4"},{"key":"37_CR11","unstructured":"Roskam, J.: Airplane Design: Airplane Cost Estimation, Ottawa, vol.\u00a08 (1990)"},{"key":"37_CR12","doi-asserted-by":"crossref","unstructured":"Duverlie, P., Castelain, J.M.: Cost Estimation During Design Step. Parametric Method versus Case Based Reasoning Method. Intl. J. Adv. Manuf. Technol.\u00a0(15), 895\u2013906 (1999)","DOI":"10.1007\/s001700050147"},{"key":"37_CR13","unstructured":"Franz, K., Ewert, A., et al.: Interdisziplin\u00e4re Bewertungsplattform zur Lebenszyklusanalyse im Flugzeugvorentwurf. In: Proceedings of DLRK 2013 Stuttgart (2013)"},{"key":"37_CR14","doi-asserted-by":"publisher","first-page":"473","DOI":"10.1007\/978-3-642-29069-5_80","volume-title":"Leveraging Technology for a Sustainable World: Proc. of the 19th CIRP Conf. on Life Cycle Eng.","author":"K. Franz","year":"2012","unstructured":"Franz, K., H\u00f6rnschemeyer, R., et al.: Life Cycle Engineering in Preliminary Aircraft Design. In: Dornfeld, D.A., Linke, B.S. (eds.) Leveraging Technology for a Sustainable World: Proc. of the 19th CIRP Conf. on Life Cycle Eng., pp. 473\u2013478. Springer, Heidelberg (2012)"},{"key":"37_CR15","doi-asserted-by":"crossref","unstructured":"Risse, K., et al.: An Integrated Environment for Preliminary Aircraft Design and Optimization. In: 53rd AIAA\/ASME\/ASCE\/AHS\/ASC Conference (2012)","DOI":"10.2514\/6.2012-1675"}],"container-title":["IFIP Advances in Information and Communication Technology","Product Lifecycle Management for a Global Market"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-662-45937-9_37","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,28]],"date-time":"2019-05-28T21:36:53Z","timestamp":1559079413000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-662-45937-9_37"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014]]},"ISBN":["9783662459362","9783662459379"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-662-45937-9_37","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"value":"1868-4238","type":"print"},{"value":"1868-422X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014]]}}}