{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,6]],"date-time":"2025-08-06T12:36:57Z","timestamp":1754483817653},"publisher-location":"Singapore","reference-count":14,"publisher":"Springer Singapore","isbn-type":[{"type":"print","value":"9789811004476"},{"type":"electronic","value":"9789811004483"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-981-10-0448-3_69","type":"book-chapter","created":{"date-parts":[[2016,3,19]],"date-time":"2016-03-19T03:34:03Z","timestamp":1458358443000},"page":"833-842","source":"Crossref","is-referenced-by-count":2,"title":["A Heuristic Based on AHP and TOPSIS for Disassembly Line Balancing"],"prefix":"10.1007","author":[{"family":"Shwetank Avikal","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,3,15]]},"reference":[{"issue":"5-6","key":"69_CR1","doi-asserted-by":"crossref","first-page":"481","DOI":"10.1007\/s00170-005-0037-6","volume":"30","author":"Seamus M. McGovern","year":"2005","unstructured":"McGovern, S.M., Gupta, S.M.: Ant colony optimization for disassembly sequencing with multiple objectives. Int. J. Adv. Manuf. Technol. 30, 481\u2013496 (2006)","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"18-19","key":"69_CR2","doi-asserted-by":"crossref","first-page":"4485","DOI":"10.1080\/00207540701476281","volume":"45","author":"S. M. Mcgovern","year":"2007","unstructured":"McGovern, S.M., Gupta, S.M.: Combinatorial optimization analysis of the unary NP- complete disassembly line balancing problem. Int. J. Prod. Res. 45(18\u201319), 4485\u20134511 (2007)","journal-title":"International Journal of Production Research"},{"issue":"6","key":"69_CR3","doi-asserted-by":"crossref","first-page":"1405","DOI":"10.1080\/00207540600943985","volume":"46","author":"S. Agrawal","year":"2008","unstructured":"Agrawal, S., Tiwari, M.K.: A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. Int. J. Prod. Res. 46(6), 1405\u20131429 (2008)","journal-title":"International Journal of Production Research"},{"issue":"10","key":"69_CR4","doi-asserted-by":"crossref","first-page":"2675","DOI":"10.1080\/00207540601137207","volume":"46","author":"F. Tevhide Altekin","year":"2008","unstructured":"Altekin, F.T., Kandiller, L., Ozdemirel, N.E.: Profit-oriented disassembly-line balancing. Int. J. Prod. Res. 46(10), 2675\u20132693","journal-title":"International Journal of Production Research"},{"issue":"10","key":"69_CR5","doi-asserted-by":"crossref","first-page":"866","DOI":"10.1080\/07408170802510390","volume":"41","author":"Ali Koc","year":"2009","unstructured":"Koc, A., Sabuncuoglu, I., Erel, E.: Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND\/OR graph. IIE Trans. Oper. Eng. 41, 866\u2013881 (2009)","journal-title":"IIE Transactions"},{"issue":"5-8","key":"69_CR6","doi-asserted-by":"crossref","first-page":"761","DOI":"10.1007\/s00170-009-2303-5","volume":"48","author":"Li-Ping Ding","year":"2010","unstructured":"Ding, L.P., Feng, Y.X., Tan, J.R., Gao, Y.C.: A new multi-objective ant colony algorithm for solving the disassembly line balancing problems. Int. J. Adv. Manuf. Technol. 48, 761\u2013771","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"69_CR7","unstructured":"Karadag, A.A., Turkbey, O.: Multi-objective optimization of stochastic disassembly line balancing with station paralleling. Comput. Indus. Eng. 65(3), 413\u2013425 (2013)"},{"issue":"18","key":"69_CR8","doi-asserted-by":"crossref","first-page":"7231","DOI":"10.1016\/j.eswa.2013.06.067","volume":"40","author":"Can B. Kalayci","year":"2013","unstructured":"Kalayci, C.B., Gupta, S.M.: Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem. Expert Syst. Appl. 40(18), 7231\u20137241 (2013)","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"69_CR9","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1016\/0097-3165(71)90024-0","volume":"10","author":"Thomas L Saaty","year":"1971","unstructured":"Saaty, T.L.: On polynomials and crossing numbers of complete graphs. J. Combin. Theor. 10, 183\u2013184 (1971)","journal-title":"Journal of Combinatorial Theory, Series A"},{"issue":"7","key":"69_CR10","doi-asserted-by":"crossref","first-page":"6388","DOI":"10.1016\/j.eswa.2011.12.030","volume":"39","author":"Sangjae Lee","year":"2012","unstructured":"Lee, S., Kim, W., Kim, Y.M., Oh, K.J.: Using AHP to determine intangible priority factors for technology transfer adoption. Expert Syst. Appl. 39, 6388\u20136395 (2012)","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"69_CR11","doi-asserted-by":"crossref","first-page":"900","DOI":"10.1016\/j.asoc.2010.01.010","volume":"11","author":"I. Chamodrakas","year":"2011","unstructured":"Chamodrakas, I., Leftheriotis, I., Martakos, D.: In-depth analysis and simulation study of an innovative fuzzy approach for ranking alternatives in multiple attribute decision making problems based on TOPSIS. Appl. Soft Comput. 11, 900\u2013907 (2011)","journal-title":"Applied Soft Computing"},{"key":"69_CR12","doi-asserted-by":"crossref","first-page":"58","DOI":"10.1007\/978-3-642-48318-9_3","volume-title":"Multiple Attribute Decision Making","author":"Ching-Lai Hwang","year":"1981","unstructured":"Hwang, C.L., Yoon, K.: Multiple attribute decision making: methods and applications. Springer, Heidelberg (1981)"},{"issue":"1","key":"69_CR13","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1016\/j.compind.2007.05.013","volume":"59","author":"Ming-Chyuan Lin","year":"2008","unstructured":"Lin, M.C., Wang, C.C., Chen, M.S., Chang, C.A.: Using AHP and TOPSIS approaches in customer-driven product design process. Comput. Indus. 59, 17\u201331 (2008)","journal-title":"Computers in Industry"},{"key":"69_CR14","unstructured":"McGovern, S.M., Gupta, S.M.: 2-Opt heuristic for the disassembly line balancing problem. In: Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III, Providence, RI, pp. 71\u201384, 2003."}],"container-title":["Advances in Intelligent Systems and Computing","Proceedings of Fifth International Conference on Soft Computing for Problem Solving"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-981-10-0448-3_69","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,1]],"date-time":"2019-06-01T19:52:07Z","timestamp":1559418727000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-981-10-0448-3_69"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9789811004476","9789811004483"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/978-981-10-0448-3_69","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2016]]}}}