{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,17]],"date-time":"2026-03-17T00:23:55Z","timestamp":1773707035013,"version":"3.50.1"},"publisher-location":"Singapore","reference-count":25,"publisher":"Springer Singapore","isbn-type":[{"value":"9789811075896","type":"print"},{"value":"9789811075902","type":"electronic"}],"license":[{"start":{"date-parts":[[2018,5,9]],"date-time":"2018-05-09T00:00:00Z","timestamp":1525824000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-981-10-7590-2_14","type":"book-chapter","created":{"date-parts":[[2018,5,8]],"date-time":"2018-05-08T02:23:32Z","timestamp":1525746212000},"page":"187-203","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["An Integrated Imperfect Production\u2013Inventory Model with Optimal Vendor Investment and Backorder Price Discount"],"prefix":"10.1007","author":[{"given":"Anindita","family":"Mukherjee","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Oshmita","family":"Dey","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"B. C.","family":"Giri","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2018,5,9]]},"reference":[{"key":"14_CR1","doi-asserted-by":"publisher","first-page":"292","DOI":"10.1111\/j.1540-5915.1986.tb00228.x","volume":"17","author":"A Banerjee","year":"1986","unstructured":"Banerjee, A.: A joint economic-lot-size model for purchaser and vendor. Decis. Sci. 17, 292\u2013311 (1986)","journal-title":"Decis. Sci."},{"key":"14_CR2","doi-asserted-by":"publisher","first-page":"875","DOI":"10.1057\/palgrave.jors.2600974","volume":"51","author":"M Ben-Daya","year":"2000","unstructured":"Ben-Daya, M., Hariga, M.: Economic lot scheduling problem with imperfect production process. J. Oper. Res. Soc. 51, 875\u2013881 (2000)","journal-title":"J. Oper. Res. Soc."},{"key":"14_CR3","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1016\/j.ijpe.2003.09.012","volume":"92","author":"M Ben-Daya","year":"2004","unstructured":"Ben-Daya, M., Hariga, M.: Integrated single vendor single buyer model with stochastic demand and variable lead-time. Int. J. Prod. Econ. 92, 75\u201380 (2004)","journal-title":"Int. J. Prod. Econ."},{"key":"14_CR4","doi-asserted-by":"publisher","first-page":"222","DOI":"10.1016\/j.ijpe.2014.02.004","volume":"155","author":"O Dey","year":"2014","unstructured":"Dey, O., Giri, B.C.: Optimal vendor investment for reducing defect rate in a vendor?buyer integrated system with imperfect production process. Int. J. Prod. Econ. 155, 222\u2013228 (2014)","journal-title":"Int. J. Prod. Econ."},{"key":"14_CR5","doi-asserted-by":"publisher","first-page":"790","DOI":"10.1016\/j.ijpe.2009.06.032","volume":"122","author":"CH Glock","year":"2009","unstructured":"Glock, C.H.: A comment: integrated single vendor-single buyer model with stochastic demand and variable lead time. Int. J. Prod. Econ. 122, 790\u2013792 (2009)","journal-title":"Int. J. Prod. Econ."},{"key":"14_CR6","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/j.ijpe.2011.09.007","volume":"136","author":"CH Glock","year":"2012","unstructured":"Glock, C.H.: Lead timer eduction strategies in a single-vendorsingle-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. Int. J. Prod. Econ. 136, 37\u201344 (2012)","journal-title":"Int. J. Prod. Econ."},{"key":"14_CR7","doi-asserted-by":"publisher","first-page":"107","DOI":"10.1080\/00207547708943107","volume":"15","author":"SK Goyal","year":"1976","unstructured":"Goyal, S.K.: An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 15, 107\u2013111 (1976)","journal-title":"Int. J. Prod. Res."},{"key":"14_CR8","doi-asserted-by":"publisher","first-page":"236","DOI":"10.1111\/j.1540-5915.1988.tb00264.x","volume":"19","author":"SK Goyal","year":"1988","unstructured":"Goyal, S.K.: A joint economic-lot-size model for purchaser and vendor: a comment. Decis. Sci. 19, 236\u2013241 (1988)","journal-title":"Decis. Sci."},{"key":"14_CR9","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1016\/S0925-5273(00)00068-2","volume":"70","author":"LE Goyal-Cardenas-Barron","year":"2002","unstructured":"Goyal-Cardenas-Barron, L.E.: The economic production quantity (EPQ) with shortage derived algebraically. Int. J. Prod. Econ. 70, 289\u2013292 (2002)","journal-title":"Int. J. Prod. Econ."},{"key":"14_CR10","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1080\/095372897235415","volume":"8","author":"D Ha","year":"1997","unstructured":"Ha, D., Kim, S.L.: Implementation of JIT purchasing: an integrated approach. Prod. Plan. Control. 8, 152\u2013157 (1997)","journal-title":"Prod. Plan. Control."},{"key":"14_CR11","doi-asserted-by":"publisher","first-page":"2463","DOI":"10.1080\/002075499190617","volume":"37","author":"RM Hill","year":"1999","unstructured":"Hill, R.M.: The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. Int. J. Prod. Res. 37, 2463\u20132475 (1999)","journal-title":"Int. J. Prod. Res."},{"key":"14_CR12","doi-asserted-by":"publisher","first-page":"229","DOI":"10.1016\/j.ijpe.2008.06.004","volume":"115","author":"Y-C Hsiao","year":"2008","unstructured":"Hsiao, Y.-C.: Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information. Int. J. Prod. Econ. 115, 229\u2013235 (2008)","journal-title":"Int. J. Prod. Econ."},{"key":"14_CR13","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/S0925-5273(03)00220-2","volume":"91","author":"CK Huang","year":"2004","unstructured":"Huang, C.K.: An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration. Int. J. Prod. Econ. 91, 91\u201398 (2004)","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"14_CR14","first-page":"53","volume":"3","author":"CK Jaggi","year":"2010","unstructured":"Jaggi, C.K., Arneja, N.: Periodic inventory model with unstable lead-time and set-up cost with backorder price discount. Int J. Appl. Decis. Sci. 3(1), 53\u201373 (2010)","journal-title":"Int J. Appl. Decis. Sci."},{"key":"14_CR15","doi-asserted-by":"crossref","unstructured":"Jauhari, W.A.: Lot size decisions for vendor-buyer system with quantity discount, partial backorder and stochastic demand. Adv. Oper. Res. Article ID-597626, 7p (2014)","DOI":"10.1155\/2014\/597626"},{"issue":"3","key":"14_CR16","doi-asserted-by":"publisher","first-page":"463","DOI":"10.5267\/j.ijec.2015.12.003","volume":"7","author":"PAS Jindal","year":"2016","unstructured":"Jindal, P.A.S.: Integrated supply chain inventory model with quality improvement involving controllable lead-time and Backorder price discount. Int. J. Ind. Eng. Comput. 7(3), 463\u2013480 (2016). \nhttps:\/\/doi.org\/10.5267\/j.ijec.2015.12.003","journal-title":"Int. J. Ind. Eng. Comput."},{"key":"14_CR17","doi-asserted-by":"publisher","first-page":"1597","DOI":"10.1016\/j.cie.2008.10.009","volume":"56","author":"Y-J Lin","year":"2009","unstructured":"Lin, Y.-J.: An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Comput. Ind. Eng. 56, 1597\u20131606 (2009)","journal-title":"Comput. Ind. Eng."},{"key":"14_CR18","doi-asserted-by":"publisher","first-page":"87","DOI":"10.2298\/YJOR110506019L","volume":"23","author":"HJ Lin","year":"2013","unstructured":"Lin, H.J.: An integrated supply chain inventory model with imperfect-quality items, controllable lead time demand and distribution-free demand. Yugoslav J. Oper. Res. 23, 87\u2013109 (2013)","journal-title":"Yugoslav J. Oper. Res."},{"key":"14_CR19","doi-asserted-by":"publisher","first-page":"1232","DOI":"10.1007\/s00170-005-0008-y","volume":"29","author":"LY Ouyang","year":"2006","unstructured":"Ouyang, L.Y., Wu, K.S., Ho, C.H.: Analysis of optimal vendor-buyer integrated inventory policy involving defective items. Int. J. Adv. Manuf. Technol. 29, 1232\u20131245 (2006)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"1","key":"14_CR20","doi-asserted-by":"publisher","first-page":"99","DOI":"10.2298\/YJOR120512017P","volume":"24","author":"Manisha Pal","year":"2014","unstructured":"Pal, M., Chandra, S.: Aperiodic review inventory model with stock dependent demand,permissible delay in payment and price discounts on backorder. Yugoslav J. Oper. Res. 24(1), 99\u2013110 (2012). \nhttps:\/\/doi.org\/10.2298\/YJOR120512017P","journal-title":"Yugoslav Journal of Operations Research"},{"key":"14_CR21","doi-asserted-by":"publisher","first-page":"1263","DOI":"10.1080\/00207540110105680","volume":"40","author":"JCH Pan","year":"2002","unstructured":"Pan, J.C.H., Yang, J.S.: A study of an integrated inventory with controllable lead time. Int. J. Prod. Res. 40, 1263\u20131273 (2002)","journal-title":"Int. J. Prod. Res."},{"key":"14_CR22","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1287\/opre.34.1.137","volume":"36","author":"EL Porteus","year":"1986","unstructured":"Porteus, E.L.: Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 36, 137\u2013144 (1986)","journal-title":"Oper. Res."},{"key":"14_CR23","doi-asserted-by":"publisher","first-page":"48","DOI":"10.1080\/07408178608975329","volume":"18","author":"MJ Rosenblatt","year":"1986","unstructured":"Rosenblatt, M.J., Lee, H.L.: Economic production cycles with imperfect production process. IIE Trans. 18, 48\u201355 (1986)","journal-title":"IIE Trans."},{"issue":"5","key":"14_CR24","doi-asserted-by":"publisher","first-page":"853","DOI":"10.1080\/00207540310001632448","volume":"42","author":"JS Yang","year":"2004","unstructured":"Yang, J.S., Pan, C.H.J.: Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. Int. J. Prod. Res. 42(5), 853\u2013863 (2004)","journal-title":"Int. J. Prod. Res."},{"key":"14_CR25","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1080\/07408179008964156","volume":"22","author":"X Zhang","year":"1990","unstructured":"Zhang, X., Gerchak, Y.: Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Trans. 22, 41\u201347 (1990)","journal-title":"IIE Trans."}],"container-title":["Advances in Intelligent Systems and Computing","Information Technology and Applied Mathematics"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-981-10-7590-2_14","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,5,8]],"date-time":"2018-05-08T02:28:59Z","timestamp":1525746539000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-981-10-7590-2_14"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,5,9]]},"ISBN":["9789811075896","9789811075902"],"references-count":25,"URL":"https:\/\/doi.org\/10.1007\/978-981-10-7590-2_14","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"value":"2194-5357","type":"print"},{"value":"2194-5365","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,5,9]]}}}