{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,13]],"date-time":"2026-07-13T08:10:23Z","timestamp":1783930223879,"version":"3.55.0"},"publisher-location":"Singapore","reference-count":16,"publisher":"Springer Nature Singapore","isbn-type":[{"value":"9789819234318","type":"print"},{"value":"9789819234325","type":"electronic"}],"license":[{"start":{"date-parts":[[2026,7,14]],"date-time":"2026-07-14T00:00:00Z","timestamp":1783987200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2026,7,14]],"date-time":"2026-07-14T00:00:00Z","timestamp":1783987200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2027]]},"DOI":"10.1007\/978-981-92-3432-5_16","type":"book-chapter","created":{"date-parts":[[2026,7,13]],"date-time":"2026-07-13T07:40:46Z","timestamp":1783928446000},"page":"189-201","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Joint Scheduling in Cascaded Flowshop Manufacturing Systems Using a Learning-Guided Iterated Greedy Algorithm"],"prefix":"10.1007","author":[{"given":"Huan","family":"Liu","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Shilu","family":"Di","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Chi","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Haizhu","family":"Bao","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xuan","family":"He","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2026,7,14]]},"reference":[{"key":"16_CR1","doi-asserted-by":"crossref","unstructured":"Bao, H., Pan, Q., Chew, C.-M., Wang, L., Gao, L.: An end-to-end framework for energy-efficient cascaded dual-shop collaborative scheduling with mating operations. IEEE Trans.  Cybern. 55(10), 4929--4942 (2025)","DOI":"10.1109\/TCYB.2025.3594063"},{"key":"16_CR2","doi-asserted-by":"crossref","unstructured":"Bao, H., Pan, Q., Chew, C.-M., Wang, L., Gao, L.: Energy efficient distributed heterogeneous hybrid flow-shop scheduling using graph neural network and deep reinforcement learning. IEEE Trans. Autom. Sci. Eng. 23, 3619\u20133635 (2026)","DOI":"10.1109\/TASE.2025.3591984"},{"key":"16_CR3","doi-asserted-by":"crossref","unstructured":"Fernandez-Viagas, V., Framinan, J.M.: A bounded-search iterated greedy algorithm for the distributed permutation flowshop scheduling problem. Int. J. Prod. Res. 53(4), 1111\u20131123 (2015)","DOI":"10.1080\/00207543.2014.948578"},{"key":"16_CR4","doi-asserted-by":"crossref","unstructured":"Pan, Q.-K., Gao, L., Wang, L., Liang, J., Li, X.-Y.: Effective heuristics and metaheuristics to minimize total flowtime for the distributed permutation flowshop problem. Expert Syst. Appl. 124, 309\u2013324 (2019)","DOI":"10.1016\/j.eswa.2019.01.062"},{"key":"16_CR5","doi-asserted-by":"crossref","unstructured":"Gupta, J.N.D.: Two-stage, hybrid flowshop scheduling problem. J. Oper. Res. Soc. 39(4), 359\u2013364 (1988)","DOI":"10.1057\/jors.1988.63"},{"key":"16_CR6","doi-asserted-by":"crossref","unstructured":"Gao, J., Chen, R.: A hybrid genetic algorithm for the distributed permutation flowshop scheduling problem. Int. J. Comput.  Intell. Syst. 4(4), 497\u2013508 (2011)","DOI":"10.1080\/18756891.2011.9727808"},{"key":"16_CR7","doi-asserted-by":"crossref","unstructured":"Wang, S., Wang, L., Liu, M., Xu, Y.: An effective estimation of distribution algorithm for solving the distributed permutation flow-shop scheduling problem. Int.  J. Prod. Econ. 145(1), 387\u2013396 (2013)","DOI":"10.1016\/j.ijpe.2013.05.004"},{"key":"16_CR8","doi-asserted-by":"crossref","unstructured":"Lin, S.-W., Ying, K.-C., Huang, C.-Y.: Minimising makespan in distributed permutation flowshops using a modified iterated greedy algorithm. Int. J. Prod. Res.  51(16), 5029\u20135038 (2013)","DOI":"10.1080\/00207543.2013.790571"},{"key":"16_CR9","doi-asserted-by":"crossref","unstructured":"Naderi, B., Ruiz, R.: A scatter search algorithm for the distributed permutation flowshop scheduling problem. Eur.  J. Oper. Res. 239(2), 323\u2013334 (2014)","DOI":"10.1016\/j.ejor.2014.05.024"},{"key":"16_CR10","doi-asserted-by":"crossref","unstructured":"Nawaz, M., Emory Enscore, E., Ham, I.: A heuristic algorithm for the M-machine, n-job flow-shop sequencing problem. Omega 11(1), 91\u201395 (1983)","DOI":"10.1016\/0305-0483(83)90088-9"},{"key":"16_CR11","doi-asserted-by":"crossref","unstructured":"Wang, Y., Han, Y., Wang, Y., Li, J., Gao, K., Liu, Y.: An effective two-stage iterated greedy algorithm for distributed flowshop group scheduling problem with setup time. Expert Syst. Appl. 233, 120909 (2023)","DOI":"10.1016\/j.eswa.2023.120909"},{"key":"16_CR12","doi-asserted-by":"crossref","unstructured":"Huang, Y.-Y., Pan, Q.-K., Gao, L.: An effective memetic algorithm for the distributed flowshop scheduling problem with an assemble machine. Int. J. Prod. Res. 61(6), 1755\u20131770  (2023)","DOI":"10.1080\/00207543.2022.2047238"},{"key":"16_CR13","doi-asserted-by":"crossref","unstructured":"Sang, H.-Y., et al.: Effective invasive weed optimization algorithms for distributed assembly permutation flowshop problem with total flowtime criterion. Swarm and Evol. Comput. 44, 64\u201373 (2019)","DOI":"10.1016\/j.swevo.2018.12.001"},{"key":"16_CR14","doi-asserted-by":"crossref","unstructured":"Zhao, F., Xu, Z., Wang, L., Zhu, N., Xu, T., Jonrinaldi, J.: A population-based iterated greedy algorithm for distributed assembly no-wait flow-shop scheduling problem. IEEE Trans. Ind.  Inform. 19(5), 6692\u20136705 (2023)","DOI":"10.1109\/TII.2022.3192881"},{"key":"16_CR15","doi-asserted-by":"crossref","unstructured":"Garc\u00eda, S., Molina, D., Lozano, M., Herrera, F.: A study on the use of non-parametric tests for analyzing the evolutionary algorithms\u2019 behaviour: a case study on the CEC\u20192005 special session on real parameter optimization. J. Heuristics 15(6), 617\u2013644 (2009)","DOI":"10.1007\/s10732-008-9080-4"},{"key":"16_CR16","doi-asserted-by":"crossref","unstructured":"Zhao, F., Zhang, L., Cao, J., Tang, J.: A cooperative water wave optimization algorithm with reinforcement learning for the distributed assembly no-idle flowshop scheduling problem. Comput.  Ind. Eng. 153, 107082 (2021)","DOI":"10.1016\/j.cie.2020.107082"}],"container-title":["Lecture Notes in Computer Science","Advanced Intelligent Computing Technology and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-981-92-3432-5_16","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,7,13]],"date-time":"2026-07-13T07:40:48Z","timestamp":1783928448000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-981-92-3432-5_16"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,7,14]]},"ISBN":["9789819234318","9789819234325"],"references-count":16,"URL":"https:\/\/doi.org\/10.1007\/978-981-92-3432-5_16","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2026,7,14]]},"assertion":[{"value":"14 July 2026","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICIC","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Intelligent Computing","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Toronto","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Canada","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2026","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"22 July 2026","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"26 July 2026","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"22","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"icic2026a","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.ic-icc.cn\/2026\/index.htm","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}