{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T21:55:37Z","timestamp":1743112537195,"version":"3.40.3"},"publisher-location":"Singapore","reference-count":28,"publisher":"Springer Nature Singapore","isbn-type":[{"type":"print","value":"9789819972425"},{"type":"electronic","value":"9789819972432"}],"license":[{"start":{"date-parts":[[2023,10,13]],"date-time":"2023-10-13T00:00:00Z","timestamp":1697155200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,10,13]],"date-time":"2023-10-13T00:00:00Z","timestamp":1697155200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024]]},"DOI":"10.1007\/978-981-99-7243-2_3","type":"book-chapter","created":{"date-parts":[[2023,10,12]],"date-time":"2023-10-12T11:03:23Z","timestamp":1697108603000},"page":"29-39","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Solving a Mobile Robot Scheduling Problem using Metaheuristic Approaches"],"prefix":"10.1007","author":[{"given":"Erlianasha","family":"Samsuria","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mohd Saiful Azimi","family":"Mahmud","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Norhaliza Abdul","family":"Wahab","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2023,10,13]]},"reference":[{"issue":"4","key":"3_CR1","doi-asserted-by":"publisher","first-page":"441","DOI":"10.1109\/JPROC.2020.3032633","volume":"109","author":"D Baumann","year":"2021","unstructured":"Baumann, D., Mager, F., Wetzker, U., Thiele, L., Zimmerling, M., Trimpe, S.: Wireless control for smart manufacturing: recent approaches and open challenges. Proc. IEEE 109(4), 441\u2013467 (2021)","journal-title":"Proc. IEEE"},{"key":"3_CR2","doi-asserted-by":"crossref","unstructured":"Gania, I.P., Stachowiak, A., Ole\u015bk\u00f3w-Sz\u0142apka, J.: Flexible manufacturing systems: industry 4.0 solution. 24th International Conference Prod. Res. ICPR 2017, pp. 57\u201362 (2017)","DOI":"10.12783\/dtetr\/icpr2017\/17583"},{"issue":"4","key":"3_CR3","doi-asserted-by":"publisher","first-page":"403","DOI":"10.1023\/A:1008930403506","volume":"11","author":"MG Mehrabi","year":"2000","unstructured":"Mehrabi, M.G., Ulsoy, A.G., Koren, Y.: Reconfigurable manufacturing systems: key to future manufacturing. J. Intell. Manuf. 11(4), 403\u2013419 (2000)","journal-title":"J. Intell. Manuf."},{"key":"3_CR4","unstructured":"Chang, G.A.: Modeling and analysis of flexible manufacturing systems\u202f: a simulation study modeling and analysis of flexible manufacturing systems\u202f: a simulation study. In: 122nd ASEE Annual Conference & Exposition, p. 12726 (2015)"},{"issue":"4","key":"3_CR5","doi-asserted-by":"publisher","first-page":"202","DOI":"10.1504\/IJAMECHS.2017.089605","volume":"7","author":"YM Mejthab","year":"2017","unstructured":"Mejthab, Y.M., Al-aubidy, K.M.: Design and implementation of real-time scheduling algorithms for flexible manufacturing systems. Int. J. Adv. Mechatron. Syst. 7(4), 202\u2013212 (2017)","journal-title":"Int. J. Adv. Mechatron. Syst."},{"issue":"1\u20132","key":"3_CR6","doi-asserted-by":"publisher","first-page":"125","DOI":"10.1007\/s10479-020-03526-7","volume":"308","author":"G Fragapane","year":"2022","unstructured":"Fragapane, G., Ivanov, D., Peron, M., Sgarbossa, F., Strandhagen, J.O.: Increasing flexibility and productivity in Industry 4.0 production networks with autonomous mobile robots and smart intralogistics. Ann. Oper. Res. 308(1\u20132), 125\u2013143 (2022)","journal-title":"Ann. Oper. Res."},{"key":"3_CR7","doi-asserted-by":"crossref","unstructured":"Kumar, S., Manjrekar, V., Singh, V., Kumar, B.: Integrated yet distributed operations planning approach: a next generation manufacturing planning system. J. Manuf. Syst. 54(June 2019), 103\u2013122 (2020)","DOI":"10.1016\/j.jmsy.2019.12.001"},{"key":"3_CR8","doi-asserted-by":"publisher","first-page":"78","DOI":"10.2507\/IJSIMM10(2)3.176","volume":"10","author":"BSP Reddy","year":"2011","unstructured":"Reddy, B.S.P., Rao, B.S.P.: Flexible manufacturing systems modelling and performance evaluation using automod. Int. J. Simul. Model 10, 78\u201390 (2011)","journal-title":"Int. J. Simul. Model"},{"key":"3_CR9","doi-asserted-by":"publisher","first-page":"390","DOI":"10.1016\/j.procir.2016.01.073","volume":"40","author":"QV Dang","year":"2016","unstructured":"Dang, Q.V., Nguyen, L.: A heuristic approach to schedule mobile robots in flexible manufacturing environments. Procedia CIRP 40, 390\u2013395 (2016)","journal-title":"Procedia CIRP"},{"key":"3_CR10","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2019.105520","volume":"81","author":"M Petrovi\u0107","year":"2019","unstructured":"Petrovi\u0107, M., Miljkovi\u0107, Z., Joki\u0107, A.: A novel methodology for optimal single mobile robot scheduling using whale optimization algorithm. Appl. Soft Comput. J. 81, 105520 (2019)","journal-title":"Appl. Soft Comput. J."},{"key":"3_CR11","doi-asserted-by":"publisher","first-page":"58","DOI":"10.2507\/IJSIMM16(1)5.368","volume":"16","author":"M Mousavi","year":"2017","unstructured":"Mousavi, M., Yap, H.J., Musa, S.N.: A fuzzy hybrid ga-pso algorithm for multi- objective agv scheduling in fms. Int. J. Simul. Model. 16, 58\u201371 (2017)","journal-title":"Int. J. Simul. Model."},{"issue":"2","key":"3_CR12","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1080\/0020754032000123579","volume":"42","author":"TF Abdelmaguid","year":"2004","unstructured":"Abdelmaguid, T.F., Nassef, A.O., Badawia, A.: A hybrid GA \/ heuristic approach to the simultaneous scheduling of machines and automated guided vehicles. Int. J. Prod. Res. 42(2), 267\u2013281 (2004)","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"3_CR13","doi-asserted-by":"publisher","first-page":"503","DOI":"10.1016\/j.ejor.2017.08.021","volume":"265","author":"L Shen","year":"2018","unstructured":"Shen, L., Dauz\u00e8re-P\u00e9r\u00e8s, S., Neufeld, J.S.: Solving the flexible job shop scheduling problem with sequence-dependent setup times. Eur. J. Oper. Res. 265(2), 503\u2013516 (2018)","journal-title":"Eur. J. Oper. Res."},{"key":"3_CR14","unstructured":"Rashmi, M., Bansal, S.: Task scheduling of automated guided vehicle in flexible manufacturing system using ant colony optimization. Int. J. Latest Trends Eng. Technol. 4(1), 177\u2013181 (2014)"},{"key":"3_CR15","doi-asserted-by":"crossref","unstructured":"Sharma, D., Singh, V., Sharma, C.: GA based scheduling of FMS using roulette wheel selection process. Adv. Intell. Soft Comput. 131(2), 931\u2013940 (2012)","DOI":"10.1007\/978-81-322-0491-6_86"},{"key":"3_CR16","first-page":"118","volume":"365","author":"QV Dang","year":"2013","unstructured":"Dang, Q.V., Nielsen, I.: Simultaneous scheduling of machines and mobile robots. Commun. Comput. Inf. Sci. 365, 118\u2013128 (2013)","journal-title":"Commun. Comput. Inf. Sci."},{"key":"3_CR17","doi-asserted-by":"crossref","unstructured":"Sanches, D.S., da Silva Rocha, J., Castoldi, M.F., Morandin, O., Kato, E.R.R.: An adaptive genetic algorithm for production scheduling on manufacturing systems with simultaneous use of machines and AGVs. J. Control. Autom. Electr. Syst. 26(3), 225\u2013234 (2015)","DOI":"10.1007\/s40313-015-0174-6"},{"key":"3_CR18","doi-asserted-by":"publisher","first-page":"507","DOI":"10.1016\/j.asoc.2018.04.001","volume":"68","author":"N Sharma","year":"2018","unstructured":"Sharma, N., Sharma, H., Sharma, A.: Beer froth artificial bee colony algorithm for job-shop scheduling problem. Appl. Soft Comput. J. 68, 507\u2013524 (2018)","journal-title":"Appl. Soft Comput. J."},{"key":"3_CR19","doi-asserted-by":"publisher","first-page":"569","DOI":"10.1016\/j.eswa.2016.08.019","volume":"64","author":"M Petrovi\u0107","year":"2016","unstructured":"Petrovi\u0107, M., Vukovi\u0107, N., Miti\u0107, M., Miljkovi\u0107, Z.: Integration of process planning and scheduling using chaotic particle swarm optimization algorithm. Expert Syst. Appl. 64, 569\u2013588 (2016)","journal-title":"Expert Syst. Appl."},{"key":"3_CR20","doi-asserted-by":"crossref","unstructured":"Sreekara Reddy, M.B.S., Ratnam, C., Rajyalakshmi, G., Manupati, V.K.: An effective hybrid multi objective evolutionary algorithm for solving real time event in flexible job shop scheduling problem. Meas. J. Int. Meas. Confed. 114, 78\u201390 (2018)","DOI":"10.1016\/j.measurement.2017.09.022"},{"issue":"3","key":"3_CR21","doi-asserted-by":"publisher","first-page":"897","DOI":"10.1080\/00207543.2014.939244","volume":"53","author":"G Candan","year":"2015","unstructured":"Candan, G., Yazgan, H.R.: Genetic algorithm parameter optimisation using Taguchi method for a flexible manufacturing system scheduling problem. Int. J. Prod. Res. 53(3), 897\u2013915 (2015)","journal-title":"Int. J. Prod. Res."},{"issue":"6","key":"3_CR22","doi-asserted-by":"publisher","first-page":"2407","DOI":"10.1007\/s10845-018-1403-1","volume":"30","author":"H Liu","year":"2019","unstructured":"Liu, H., Wang, Y., Tu, L., Ding, G., Hu, Y.: A modified particle swarm optimization for large-scale numerical optimizations and engineering design problems. J. Intell. Manuf. 30(6), 2407\u20132433 (2019)","journal-title":"J. Intell. Manuf."},{"issue":"6","key":"3_CR23","doi-asserted-by":"publisher","first-page":"1058","DOI":"10.1287\/opre.43.6.1058","volume":"43","author":"U Bilge","year":"1995","unstructured":"Bilge, U., Ulusoy, G.: Time window approach to simultaneous scheduling of machines and material handling system in an FMS. Oper. Res. 43(6), 1058\u20131070 (1995)","journal-title":"Oper. Res."},{"key":"3_CR24","doi-asserted-by":"crossref","unstructured":"Chakrabarti, S., Saha, H.N.: Simultaneous scheduling of machines and automated guided vehicles utilizing heuristic search algorithm. In: 2018 IEEE 8th Annual Computing and Communication Workshop and Conference (CCWC), pp. 54\u201359 (2018)","DOI":"10.1109\/CCWC.2018.8301705"},{"issue":"4","key":"3_CR25","first-page":"1364","volume":"23","author":"DC Optimization","year":"2013","unstructured":"Optimization, D.C.: A deterministic single exponential time algorithm for most lattice problems based on voronoi cell computations. SIAM J. Comput. 23(4), 1364\u20131391 (2013)","journal-title":"SIAM J. Comput."},{"key":"3_CR26","doi-asserted-by":"crossref","unstructured":"Wan, M., Xu, X., Nan, J.: Flexible job-shop scheduling with integrated genetic algorithm. In: Proceedings of 4th International Workshop on Advanced Computational Intelligence, IWACI 2011, pp. 13\u201316 (2011)","DOI":"10.1109\/IWACI.2011.6159965"},{"key":"3_CR27","doi-asserted-by":"publisher","first-page":"339","DOI":"10.1007\/s00170-010-2820-2","volume":"53","author":"MVS Kumar","year":"2011","unstructured":"Kumar, M.V.S., Janardhana, R., Rao, C.S.P.: Simultaneous scheduling of machines and vehicles in an FMS environment with alternative routing. Int. J. Adv. Manuf. Technol. 53, 339\u2013351 (2011)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"3_CR28","doi-asserted-by":"crossref","unstructured":"Kennedy, J., Eberhart, R.: Particle swarm optimization. Neural Networks, 1995. Proceedings., IEEE Int. Conf., 4, pp. 1942\u20131948 (1995)","DOI":"10.1109\/ICNN.1995.488968"}],"container-title":["Communications in Computer and Information Science","Methods and Applications for Modeling and Simulation of Complex Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-981-99-7243-2_3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T18:34:13Z","timestamp":1730313253000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-981-99-7243-2_3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,10,13]]},"ISBN":["9789819972425","9789819972432"],"references-count":28,"URL":"https:\/\/doi.org\/10.1007\/978-981-99-7243-2_3","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2023,10,13]]},"assertion":[{"value":"13 October 2023","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"AsiaSim","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Asia Simulation Conference","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Langkawi","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Malaysia","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2023","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"25 October 2023","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"26 October 2023","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"22","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"asiasim2023","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/www.asiasim2023.cmedutm.com\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Single-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"EDAS","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"164","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"77","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"47% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"3","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}},{"value":"Yes","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information (provided by the conference organizers)"}}]}}