{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,6,1]],"date-time":"2022-06-01T19:19:01Z","timestamp":1654111141288},"reference-count":12,"publisher":"Springer Science and Business Media LLC","issue":"3-4","license":[{"start":{"date-parts":[[1996,12,1]],"date-time":"1996-12-01T00:00:00Z","timestamp":849398400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Glob Optim"],"published-print":{"date-parts":[[1996,12]]},"DOI":"10.1007\/bf00121677","type":"journal-article","created":{"date-parts":[[2004,10,31]],"date-time":"2004-10-31T07:16:35Z","timestamp":1099206995000},"page":"321-344","source":"Crossref","is-referenced-by-count":5,"title":["Three stage generalized flowshop: Scheduling civil engineering projects"],"prefix":"10.1007","volume":"9","author":[{"given":"Moshe","family":"Dror","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Paul A.","family":"Mullaseril","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"CR1","first-page":"5","volume":"4","author":"J. Blazewicz","year":"1991","unstructured":"Blazewicz, J., Eiselt, H., Finke, G., Laporte, G., and Weglarz, J. (1991). ?Scheduling jobs and vehicles in flexible manufacturing systems?, The International Journal of FMS, 4, 5?16.","journal-title":"The International Journal of FMS"},{"key":"CR2","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-00074-8","volume-title":"Scheduling in Computer and Manufacturing Systems","author":"J. Blazewicz","year":"1993","unstructured":"Blazewicz, J., Ecker, K., Schmidt, G., and Weglarz, J., (1993). Scheduling in Computer and Manufacturing Systems. Springer-Verlag, Berlin 1993."},{"key":"CR3","first-page":"159","volume":"19","author":"J. Blazewicz","year":"1994","unstructured":"Blazewicz, J., Dror, M., Pawlak, G., and Stecke, K.E., (1994). ?A note on flexible flowshop scheduling with two-stages?, Foundation of Computing and Decision Science 19, 159?172.","journal-title":"Foundation of Computing and Decision Science"},{"key":"CR4","unstructured":"Dell'Olmo, P., Dror, M., and Kubiak, W., (1993). ??Strong?-?Weak? Chain Constrained Scheduling.? working paper. MIS dept., University of Arizona."},{"key":"CR5","doi-asserted-by":"crossref","first-page":"701","DOI":"10.1287\/opre.17.4.701","volume":"17","author":"H. Emmons","year":"1969","unstructured":"Emmons, H. (1969). ?One-machine sequencing to minimize certain functions of job tardiness. Operations Research, 17, 701?715.","journal-title":"Operations Research"},{"key":"CR6","doi-asserted-by":"crossref","unstructured":"Garey, M.R., Johnson, D.S., and Sethi, R., (1976). ?The complexity of flowshop and jobhop scheduling?, Mathematics of Operations Research, 117?129.","DOI":"10.1287\/moor.1.2.117"},{"key":"CR7","doi-asserted-by":"crossref","first-page":"535","DOI":"10.1002\/nav.3800290316","volume":"29","author":"N. Hefetz","year":"1982","unstructured":"Hefetz, N. and Adiri, I., (1982). ?A note on the influence of missing operations on scheduling problems?, Naval Research Logistics Quarterly 29, 535?539.","journal-title":"Naval Research Logistics Quarterly"},{"key":"CR8","series-title":"Research Report","volume-title":"Scheduling a production line to minimize maximum tardiness","author":"J.R. Jackson","year":"1955","unstructured":"Jackson, J.R. (1955). ?Scheduling a production line to minimize maximum tardiness?, Research Report 43, Management Science Research Project, University of California, Los Angeles."},{"key":"CR9","unstructured":"Kouvelis, P. and Vairaktarakis, G.L., (1994). ?A two stage flexible job shop scheduling problem?, Operations Research Letters, (in press)."},{"key":"CR10","volume-title":"Simulation Modeling & Analysis","author":"Averill M. Law","year":"1991","unstructured":"Law, Averill M. and Kelton, David W. (1991). ?Simulation Modeling & Analysis?, cond Edition, McGraw-Hill, Inc. New York.","edition":"cond Edition"},{"key":"CR11","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1016\/0377-2217(89)90208-7","volume":"43","author":"C. Sriskandarajah","year":"1989","unstructured":"Sriskandarajah, C. and Sethi, S.P., (1989). ?Scheduling algorithms for flexible flowshops: Worst and average case performance?, EJOR. 43, 143?160.","journal-title":"EJOR"},{"key":"CR12","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1287\/opre.36.3.445","volume":"36","author":"R.J. Wittrock","year":"1988","unstructured":"Wittrock, R.J., (1988). ?An adaptable scheduling algorithm for flexible flow lines?, Operations Research, 36, 445?453.","journal-title":"Operations Research"}],"container-title":["Journal of Global Optimization"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF00121677.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF00121677\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF00121677","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,4,3]],"date-time":"2020-04-03T16:34:11Z","timestamp":1585931651000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF00121677"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1996,12]]},"references-count":12,"journal-issue":{"issue":"3-4","published-print":{"date-parts":[[1996,12]]}},"alternative-id":["BF00121677"],"URL":"https:\/\/doi.org\/10.1007\/bf00121677","relation":{},"ISSN":["0925-5001","1573-2916"],"issn-type":[{"value":"0925-5001","type":"print"},{"value":"1573-2916","type":"electronic"}],"subject":[],"published":{"date-parts":[[1996,12]]}}}