{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,25]],"date-time":"2026-09-25T16:02:25Z","timestamp":1790352145856,"version":"4.1.0"},"reference-count":21,"publisher":"Springer Science and Business Media LLC","issue":"3-4","license":[{"start":{"date-parts":[[1996,12,1]],"date-time":"1996-12-01T00:00:00Z","timestamp":849398400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Glob Optim"],"published-print":{"date-parts":[[1996,12]]},"DOI":"10.1007\/bf00121679","type":"journal-article","created":{"date-parts":[[2004,10,31]],"date-time":"2004-10-31T07:16:35Z","timestamp":1099206995000},"page":"357-377","source":"Crossref","is-referenced-by-count":25,"title":["The master-slave paradigm in parallel computer and industrial settings"],"prefix":"10.1007","volume":"9","author":[{"given":"Sartaj","family":"Sahni","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"George","family":"Vairaktarakis","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"key":"CR1","volume-title":"Introduction to Sequencing and Scheduling","author":"K. Baker","year":"1974","unstructured":"K. Baker, Introduction to Sequencing and Scheduling, John Wiley, New York, 1974."},{"key":"CR2","volume-title":"Computer & Job\/Shop Scheduling Theory","author":"E. Coffman","year":"1976","unstructured":"E. Coffman, Computer & Job\/Shop Scheduling Theory, John Wiley, New York, 1976."},{"key":"CR3","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1016\/0020-0190(88)90209-8","volume":"28","author":"G. Chen","year":"1988","unstructured":"G. Chen and T. Lai, Preemptive scheduling of independent jobs on a hypercube, Information Processing Letters, 28, 201?206, 1988.","journal-title":"Information Processing Letters"},{"key":"CR4","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1016\/0743-7315(91)90031-4","volume":"12","author":"G. Chen","year":"1991","unstructured":"G. Chen and T. Lai, Scheduling independent jobs on partitionable hypercubes, Jr. of Parallel & Distributed Computing, 12, 74?78, 1991.","journal-title":"Jr. of Parallel & Distributed Computing"},{"key":"CR5","doi-asserted-by":"crossref","unstructured":"M. Dell'Amico, Shop problems with two machine and time lags, Operation Research, to appear.","DOI":"10.1287\/opre.44.5.777"},{"key":"CR6","volume-title":"Computers and Intractability: A guide to the theory of NP-completeness","author":"M. Garey","year":"1979","unstructured":"M. Garey and D. Johnson, Computers and Intractability: A guide to the theory of NP-completeness, W. H. Freeman and Co., New York, 1979."},{"key":"CR7","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R. Graham","year":"1979","unstructured":"R. Graham, E. Lawler, J. Lenstra, and A. Rinnooy Kan, Optimization and approximation in deterministic sequencing and scheduling: A survey, Annals of Discrete Mathematics, 5, 287?326, 1979.","journal-title":"Annals of Discrete Mathematics"},{"key":"CR8","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1287\/mnsc.5.3.299","volume":"5","author":"S.M. Johnson","year":"1959","unstructured":"S.M. Johnson, Discussion: Sequencing n jobs on two machines with arbitrary time lags, Management Science, 5, 299?303, 1959.","journal-title":"Management Science"},{"key":"CR9","unstructured":"W. Kern and W. Nawijn, Scheduling multi-operation jobs with time lags on a single machine, University of Twente, 1993."},{"issue":"5","key":"CR10","doi-asserted-by":"crossref","first-page":"488","DOI":"10.1109\/71.282559","volume":"5","author":"P. Krueger","year":"1994","unstructured":"P. Krueger, T. Lai, and V. Dixit-Radiya, Job scheduling is more important than processor allocation for hypercube computers, IEEE Trans. on Parallel & Distributed Systems, 5, 5, 488?497, 1994.","journal-title":"IEEE Trans. on Parallel & Distributed Systems"},{"key":"CR11","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/0167-6377(94)90026-4","volume":"16","author":"C.-Y. Lee","year":"1994","unstructured":"C.-Y. Lee and G.L. Vairaktarakis, Minimizing makespan in hybrid flowshops, Operations Research Letters, 16, 149?158, 1994.","journal-title":"Operations Research Letters"},{"key":"CR12","doi-asserted-by":"crossref","unstructured":"S. Leutenegger and M. Vernon, The performance of multiprogrammed multiprocessor scheduling policies, Proc. 1990 ACM SIGMETRICS Conference on Measurement & Modeling of Computer Systems, 226?236, 1990.","DOI":"10.1145\/98457.98761"},{"issue":"4","key":"CR13","doi-asserted-by":"crossref","first-page":"764","DOI":"10.1287\/opre.40.4.764","volume":"40","author":"C.-Y. Lee","year":"1992","unstructured":"C.-Y. Lee, R. Uzsoy and L.A.M. Vega, Efficient algorithms for scheduling semiconductor burn-in operations, Operations Research, 40, 4, 764?775, 1992.","journal-title":"Operations Research"},{"key":"CR14","unstructured":"S. Majumdar, D. Eager, and R. Bunt, Scheduling in multiprogrammed parallel systems, Proc. 1988 ACM SIGMETRICS, 104?113, 1988."},{"key":"CR15","doi-asserted-by":"crossref","unstructured":"C. McCreary, A. Khan, J. Thompson, and M. McArdle, A comparison of heuristics for scheduling DAGS on multiprocessors, 8th International Parallel Processing Symposium, 446?451, 1994.","DOI":"10.1109\/IPPS.1994.288264"},{"key":"CR16","doi-asserted-by":"crossref","first-page":"293","DOI":"10.1287\/mnsc.5.3.293","volume":"5","author":"L.G. Mitten","year":"1959","unstructured":"L.G. Mitten, Sequencing n jobs on two machines with arbitrary time lags, Management Science, 5, 293?298, 1959.","journal-title":"Management Science"},{"key":"CR17","doi-asserted-by":"crossref","unstructured":"A. Orman and C. Potts On the complexity of coupled-task scheduling, Discrete Applied Mathematics, To appear.","DOI":"10.1016\/S0166-218X(96)00041-8"},{"issue":"7","key":"CR18","doi-asserted-by":"crossref","first-page":"637","DOI":"10.1109\/TC.1984.5009337","volume":"33","author":"S. Sahni","year":"1984","unstructured":"S. Sahni, Scheduling multipipeline and multiprocessor computers, IEEE Trans on Computers, C-33, 7, 637?645, 1984.","journal-title":"IEEE Trans on Computers"},{"key":"CR19","doi-asserted-by":"crossref","unstructured":"S. Sahni, Scheduling master-slave multiprocessor systems, Proceedings, First International EURO-PAR Conference, Lecture Notes In Computer Science, Vol. 966, Springer, 1995, pp 611?622.","DOI":"10.1007\/BFb0020496"},{"key":"CR20","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1002\/nav.3800150202","volume":"15","author":"W. Szwarc","year":"1968","unstructured":"W. Szwarc, On some sequencing problems, Naval Research Logistics Quarterly, 15, 127?155, 1968.","journal-title":"Naval Research Logistics Quarterly"},{"key":"CR21","unstructured":"Y. Zhu and M. Ahuja, Preemptive job scheduling on a hypercube, Proc. 1990 International Conference on Parallel Processing, 301?304, 1990."}],"container-title":["Journal of Global Optimization"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF00121679.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF00121679\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF00121679","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,3]],"date-time":"2019-04-03T09:14:21Z","timestamp":1554282861000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF00121679"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1996,12]]},"references-count":21,"journal-issue":{"issue":"3-4","published-print":{"date-parts":[[1996,12]]}},"alternative-id":["BF00121679"],"URL":"https:\/\/doi.org\/10.1007\/bf00121679","relation":{},"ISSN":["0925-5001","1573-2916"],"issn-type":[{"value":"0925-5001","type":"print"},{"value":"1573-2916","type":"electronic"}],"subject":[],"published":{"date-parts":[[1996,12]]}}}