{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,1]],"date-time":"2022-04-01T13:50:09Z","timestamp":1648821009307},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[1995,4,1]],"date-time":"1995-04-01T00:00:00Z","timestamp":796694400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[1995,4]]},"DOI":"10.1007\/bf00123679","type":"journal-article","created":{"date-parts":[[2004,10,31]],"date-time":"2004-10-31T10:43:15Z","timestamp":1099219395000},"page":"79-85","source":"Crossref","is-referenced-by-count":6,"title":["Hierarchical production management applied to an iron and steel industry"],"prefix":"10.1007","volume":"6","author":[{"given":"Marie -Claude","family":"Portmann","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Dominique","family":"Rohr","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"CR1","doi-asserted-by":"crossref","unstructured":"Axsater, S. (1981) Aggregation of product data for hierarchical production planning. Operations Research, 29(4), July.","DOI":"10.1287\/opre.29.4.744"},{"issue":"4","key":"CR2","first-page":"60","volume":"23","author":"B. M. Guay","year":"1990","unstructured":"Guay, B. M. (1990) A backward, forward and midpoint scheduling system for multiple bottleneck operations. Wire Journal International, 23(4), April, 60, 63?64, 67, 69, 71.","journal-title":"Wire Journal International"},{"issue":"6","key":"CR3","doi-asserted-by":"crossref","first-page":"497","DOI":"10.1016\/0305-0548(88)90046-9","volume":"15","author":"T. L. Jacobs","year":"1988","unstructured":"Jacobs, T. L., Wright, J. R. and Cobbs, A. E. (1988) Optimal inter-process steel production scheduling. Computers & Operations Research, 15(6), 497?507.","journal-title":"Computers & Operations Research"},{"key":"CR4","unstructured":"Kirkpatrick, S., Gelatt, C. D. and Vecchi, M. P. (1982) Optimization by simulated annealing, IBM Research Report RC 9355."},{"key":"CR5","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S. Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, C. D. and Vecchi, M. P. (1983) Optimization by simulated annealing. Science, 220, May, 671?680.","journal-title":"Science"},{"key":"CR6","unstructured":"Lu, Y. Z., Bao, L. W., Yang, Y. Y. and Li, B. Y. (1990) An integrated computer control system for a steel plate mill, in Automation in Mining, Mineral and Metal Processing, Selected Papers from the 6th IFAC Symposium, pp. 293?297."},{"key":"CR7","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1109\/HICSS.1990.205370","volume":"3","author":"M. L. Manheim","year":"1990","unstructured":"Manheim, M. L., Srivastava, S., Vlahos, N., Hsu J. and Jones, P. (1990) A symbiotic decision support system for production planning and scheduling: issues and approaches, in Proceedings of the Twenty-Third Annual Hawaii International Conference on System Sciences, 3, pp. 383?390.","journal-title":"Proceedings of the Twenty-Third Annual Hawaii International Conference on System Sciences"},{"key":"CR8","unstructured":"Nambiar, P. V. N. and Acharya, D. (1988) Decision support system for production planning: a steel plant experience, in Operational Research '87: Proceedings of the 11th International Conference, pp 145?160."},{"key":"CR9","first-page":"133","volume":"24","author":"M. Nakagawa","year":"1980","unstructured":"Nakagawa, M., Tanimoto, Y., Kiba, M. and Koriki, M. (1980) Production control system of hot strip mill. Sumitomo Search, 24, 133?143.","journal-title":"Sumitomo Search"},{"key":"CR10","unstructured":"Portmann, M. C. and Camps, J. J. (1993) Steel coils scheduling in a flow shop with parallel tools and tight constraints, in Advances in Factories of the Future, CIM and Robotics, Cotsaftis, M. and Vernadat, F. (eds) Manufacturing Research and Technology, 16, 489?495."},{"key":"CR11","unstructured":"Rohr, D. (1992) Gestion de production hi\u00e9rarchis\u00e9e appliqu\u00e9e en sid\u00e9rurgie, Th\u00e8se CNAM, Centre R\u00e9gional de Nancy."},{"key":"CR12","doi-asserted-by":"crossref","first-page":"108","DOI":"10.1109\/CAIA.1990.89178","volume":"1","author":"M. J. Shah","year":"1990","unstructured":"Shah, M. J., Damian, R. and Silverman, J. (1990) Knowledge based dynamic scheduling in a steel plant, in 6th Conference on Artificial Intelligence Application, 1, pp. 108?113.","journal-title":"6th Conference on Artificial Intelligence Application"},{"issue":"3","key":"CR13","doi-asserted-by":"crossref","first-page":"164","DOI":"10.1016\/0307-904X(91)90026-L","volume":"15","author":"M. T. Tabucanon","year":"1991","unstructured":"Tabucanon, M. T. and Sasiwong, B. (1991) Production planning and scheduling for a iron and steel production system. Applied Mathematical Modelling, 15(3), 164?168.","journal-title":"Applied Mathematical Modelling"},{"issue":"3","key":"CR14","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1016\/0377-2217(91)90305-F","volume":"51","author":"M. N. Thorsen","year":"1991","unstructured":"Thorsen, M. N. and Vidal, R. V. V. (1991) Operational research in the Danish steel industry. European Journal of Operational Research, 51(3), 301?309.","journal-title":"European Journal of Operational Research"},{"key":"CR15","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1080\/05695558208974580","volume":"1","author":"F. J. Vasko","year":"1982","unstructured":"Vasko, F. J. and Friedel, D. C. (1982) A dynamic programming model for determining continuous-caster configurations. IIE Transactions, (1), 38?43.","journal-title":"IIE Transactions"},{"key":"CR16","doi-asserted-by":"crossref","unstructured":"Wright, J. R. and Houck, M. H. (1985) An application of systems modelling in steel production scheduling, in Proceedings of the 4th International Conference on Engineering Software, pp. 127?140.","DOI":"10.1007\/978-3-662-21877-8_75"},{"key":"CR17","unstructured":"Yasuda, H., Tokuyama, H. and Tarui, K. (1984) Two-stage algorithm for production scheduling of hot strip mill, in Operational Research '84: Proceedings of the 10th International Conference, pp. 588?600."}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF00123679.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF00123679\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF00123679","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,3]],"date-time":"2019-04-03T09:16:53Z","timestamp":1554283013000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF00123679"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1995,4]]},"references-count":17,"journal-issue":{"issue":"2","published-print":{"date-parts":[[1995,4]]}},"alternative-id":["BF00123679"],"URL":"https:\/\/doi.org\/10.1007\/bf00123679","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[1995,4]]}}}