{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,25]],"date-time":"2026-02-25T12:09:27Z","timestamp":1772021367545,"version":"3.50.1"},"reference-count":12,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[1995,4,1]],"date-time":"1995-04-01T00:00:00Z","timestamp":796694400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[1995,4]]},"DOI":"10.1007\/bf00123681","type":"journal-article","created":{"date-parts":[[2004,10,31]],"date-time":"2004-10-31T10:43:15Z","timestamp":1099219395000},"page":"95-103","source":"Crossref","is-referenced-by-count":25,"title":["Scheduling independent jobs on uniform parallel machines to minimize tardiness criteria"],"prefix":"10.1007","volume":"6","author":[{"given":"Alain","family":"Guinet","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"CR1","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1080\/05695557708975117","volume":"9","author":"J. W. Barnes","year":"1977","unstructured":"Barnes, J. W. and Brennan, J. J. (1977) An improved algorithm for scheduling jobs on identical machines. AIIE Transactions, 9, 25?31.","journal-title":"AIIE Transactions"},{"key":"CR2","volume-title":"Probl\u00e8mes d'ordonnancement, mod\u00e9lisation, complexit\u00e9, algorithmes","author":"J. Carrier","year":"1988","unstructured":"Carrier, J. and Chretienne, P. (1988) Probl\u00e8mes d'ordonnancement, mod\u00e9lisation, complexit\u00e9, algorithmes, Masson Editor, ERI Collection, Paris."},{"key":"CR3","doi-asserted-by":"crossref","first-page":"535","DOI":"10.1080\/00207548408942477","volume":"22","author":"A. Dogramaci","year":"1984","unstructured":"Dogramaci, A. (1984) Production scheduling of independent jobs on parallel identical processors. International Journal of Production Research, 22, 535?548.","journal-title":"International Journal of Production Research"},{"key":"CR4","doi-asserted-by":"crossref","first-page":"1208","DOI":"10.1287\/mnsc.25.12.1208","volume":"25","author":"A. Dogramaci","year":"1979","unstructured":"Dogramaci, A. and Surkis, J. (1979) Evaluation of a heuristic for scheduling independent jobs on parallel identical processors. Management Science, 25, 1208?1216.","journal-title":"Management Science"},{"key":"CR5","first-page":"4","volume":"53","author":"G. Dreyfus","year":"1987","unstructured":"Dreyfus, G. (1987) Chaos et C.A.O. ou la m\u00e9thode du recruit simul\u00e9. AFCET\/Interfaces, 53, 4?9.","journal-title":"AFCET\/Interfaces"},{"key":"CR6","series-title":"Ph.D. Thesis","volume-title":"Probl\u00e8mes d'ordannancement sur machines paralleles: apport du recuit simul\u00e9","author":"F. P. Echalier","year":"1991","unstructured":"Echalier, F. P. (1991) Probl\u00e8mes d'ordannancement sur machines paralleles: apport du recuit simul\u00e9. Ph.D. Thesis, Lyon l University, France."},{"key":"CR7","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/05695557408974926","volume":"6","author":"S. E. Elmaghraby","year":"1974","unstructured":"Elmaghraby, S. E. and Park, S. H. (1974) Scheduling jobs on a number of identical machines. AIIE Transactions, 6, 1?13.","journal-title":"AIIE Transactions"},{"key":"CR8","doi-asserted-by":"crossref","first-page":"655","DOI":"10.1057\/jors.1991.132","volume":"42","author":"A Guinet","year":"1991","unstructured":"Guinet, A. (1991) Textile production systems: a succession of non-identical parallel processor shops. Journal of Operational Research Society, 42, 655?671.","journal-title":"Journal of Operational Research Society"},{"key":"CR9","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S. Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, C. D. and Vecchi, M. P. (1983) Optimization by simulated annealing. Science, 220, 671?680.","journal-title":"Science"},{"key":"CR10","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1016\/0167-6377(82)90021-9","volume":"1","author":"E. L. Lawler","year":"1982","unstructured":"Lawler, E. L., Luby, M. G. and Vazirani, V. V. (1982) Scheduling open shops with parallel machines. Operations Research Letters, 1, 161?164.","journal-title":"Operations Research Letters"},{"key":"CR11","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1080\/00207548208947755","volume":"20","author":"C. S. Sarin","year":"1982","unstructured":"Sarin, C. S. (1982) Scheduling independent projects against a single resource. International Journal of Production Research, 20, 135?146.","journal-title":"International Journal of Production Research"},{"key":"CR12","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1057\/jors.1978.50","volume":"29","author":"R. Tremoliere","year":"1978","unstructured":"Tremoliere, R. (1978) Scheduling jobs of equal durations with tardiness costs and resource limitations. Journal of Operational Research Society, 29, 229?233.","journal-title":"Journal of Operational Research Society"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF00123681.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF00123681\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF00123681","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,3]],"date-time":"2019-04-03T09:16:53Z","timestamp":1554283013000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF00123681"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1995,4]]},"references-count":12,"journal-issue":{"issue":"2","published-print":{"date-parts":[[1995,4]]}},"alternative-id":["BF00123681"],"URL":"https:\/\/doi.org\/10.1007\/bf00123681","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[1995,4]]}}}