{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,5]],"date-time":"2022-04-05T19:14:11Z","timestamp":1649186051736},"reference-count":31,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[1993,4,1]],"date-time":"1993-04-01T00:00:00Z","timestamp":733622400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[1993,4]]},"DOI":"10.1007\/bf00123908","type":"journal-article","created":{"date-parts":[[2004,10,31]],"date-time":"2004-10-31T10:50:12Z","timestamp":1099219812000},"page":"151-161","source":"Crossref","is-referenced-by-count":6,"title":["Application of the artificial memory approach to multicriteria scheduling problems"],"prefix":"10.1007","volume":"4","author":[{"given":"Chengbin","family":"Chu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Marie-Claude","family":"Portmann","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"CR1","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/0272-6963(82)90020-1","volume":"3","author":"K. R. Baker","year":"1982","unstructured":"Baker, K. R. and Bertrand, J. W. M. (1982) A dynamic priority rule for scheduling against due-dates. Journal of Operations Management, 3, 37?42.","journal-title":"Journal of Operations Management"},{"key":"CR2","unstructured":"Bechler, E., Proth, J.-M. and Voyiatzis, K. (1984) Artificial memory in production management, Research Report, INRIA, Rocquencourt, France, No. 336, September."},{"key":"CR3","unstructured":"Bel, G., Bensana, E. and Dubois, D. (1986) Un syst\u00e8me d'ordonnancement pr\u00e9visionnel d'atelier utilisant des connaissance th\u00e9oriques et pratiques, in Proceedings of Sixi\u00e8mes Journ\u00e9es Internationales Les Syst\u00e8mes Experts et leurs Applications, Avignon, France, pp. 757?770."},{"key":"CR4","doi-asserted-by":"crossref","unstructured":"Bensana, E., Bel, G. and Dubois, D. (1988) OPAL: a knowledge-based system for industrial job-shop scheduling, in NATO ASI Series, Vol. F49, Computer Integrated Manufacturing, Burhan Turksen, I. (ed.), Germany.","DOI":"10.1080\/00207548808947904"},{"key":"CR5","series-title":"Research Report","volume-title":"Application de r\u00e8gles de gestion \u00e0 un syst\u00e8me de fabrication: Classification des objectifs atteints en vue de leur utilisation","author":"F. Bonneau","year":"1983","unstructured":"Bonneau, F. and Proth, J.-M. (1983) Application de r\u00e8gles de gestion \u00e0 un syst\u00e8me de fabrication: Classification des objectifs atteints en vue de leur utilisation, Research Report, INRIA, Rocquencourt, France, No. 372, March."},{"key":"CR6","series-title":"Research Report","volume-title":"Analyse discriminante: M\u00e9thode du type plus proches voisins utilisant un pr\u00e9traitement des donn\u00e9es","author":"F. Bonneau","year":"1985","unstructured":"Bonneau, F. and Proth, J.-M. (1985) Analyse discriminante: M\u00e9thode du type plus proches voisins utilisant un pr\u00e9traitement des donn\u00e9es, Research Report, INRIA, Rocquencourt, France, No. 440, September."},{"key":"CR7","unstructured":"Boucon, D. (1991) Ordonnancement d'atelier: aide au choix de r\u00e8gle de priorit\u00e9, PhD Thesis, Ecole Nationale Sup\u00e9rieure de l'A\u00e9ronautique et de l'Espace de Toulouse."},{"key":"CR8","first-page":"189","volume":"17","author":"O. Charalambous","year":"1991","unstructured":"Charalambous, O. and Hindi, K. S. (1991) A review of artificial intelligence based job shop scheduling systems. Information and Decision Technologies, 17, 189?202.","journal-title":"Information and Decision Technologies"},{"issue":"3","key":"CR9","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1080\/09511929108944491","volume":"4","author":"G. Chryssolouris","year":"1991","unstructured":"Chryssolouris, G., Lee, M. and Dicke, K. (1991a) An approach to short interval scheduling for discrete parts manufacturing. International Journal of Computer Integrated Manufacturing, 4(3), 157?168.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"2","key":"CR10","doi-asserted-by":"crossref","first-page":"166","DOI":"10.1016\/0278-6125(91)90018-W","volume":"10","author":"G. Chryssolouris","year":"1991","unstructured":"Chryssolouris, G., Lee, M. and Domroese, M. (1991b) The use of neural networks in determining operational policies for manufacturing systems. Journal of Manufacturing Systems, 10(2), 166?175.","journal-title":"Journal of Manufacturing Systems"},{"issue":"5","key":"CR11","doi-asserted-by":"crossref","first-page":"368","DOI":"10.1016\/0278-6125(91)90055-7","volume":"10","author":"G. Chryssolouris","year":"1991","unstructured":"Chryssolouris, G., Pierce, J. and Dicke, K. (1991c) An approach for allocating manufacturing resources to production tasks. Journal of Manufacturing Systems, 10(5), 368?382.","journal-title":"Journal of Manufacturing Systems"},{"key":"CR12","unstructured":"Chu, C. (1990a) Nouvelles approches analytiques et concept de m\u00e9moire artificielle pour divers probl\u00e8mes d'ordonnancement, PhD Thesis, University of Metz."},{"key":"CR13","doi-asserted-by":"crossref","unstructured":"Chu, C. (1990b) Minimizing total flow time subject to release dates, in Proceedings of the Rensselaer's Second International Conference on Computer Integrated Manufacturing, Troy, NY, 21?23 May, pp. 570?576.","DOI":"10.1109\/CIM.1990.128164"},{"key":"CR14","series-title":"Research Report, INRIA, Rocquencourt, France, No. 1232","volume-title":"Single machine scheduling problems with release dates","author":"C. Chu","year":"1990","unstructured":"Chu, C. and Portmann, M. C. (1990) Single machine scheduling problems with release dates, Research Report, INRIA, Rocquencourt, France, No. 1232 and EURO WG-PMS, Compi\u00e8gne, France, June."},{"key":"CR15","doi-asserted-by":"crossref","first-page":"404","DOI":"10.1016\/0377-2217(92)90071-G","volume":"58","author":"C. Chu","year":"1992","unstructured":"Chu, C. and Portmann, M. C. (1992) Some new efficient methods to solve the n\/1\/r i ,\/?T i scheduling problem. European Journal of Operational Research, 58, 404?13.","journal-title":"European Journal of Operational Research"},{"key":"CR16","series-title":"Technical Report CMU-R1-TR-83-22","volume-title":"Constraint-directed search: A case study of job-shop scheduling, PhD Thesis","author":"M. S. Fox","year":"1983","unstructured":"Fox, M. S. (1983) Constraint-directed search: A case study of job-shop scheduling, PhD Thesis, Carnegie-Mellon University, Pittsburgh, PA, December, Technical Report CMU-R1-TR-83?22."},{"issue":"1","key":"CR17","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1111\/j.1468-0394.1984.tb00424.x","volume":"1","author":"M. S. Fox","year":"1984","unstructured":"Fox, M. S. and Smith, S. F. (1984) ISIS: A knowledge based system for factory scheduling. Expert System Journal, 1(1), 25?49.","journal-title":"Expert System Journal"},{"key":"CR18","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/0377-2217(87)90192-5","volume":"29","author":"J. J. Kanet","year":"1987","unstructured":"Kanet, J. J. and Adelsberger, H. H. (1987) Expert systems in production scheduling. European Journal of Operational Research, 29, 51?59.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"CR19","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/S0167-8493(85)90305-5","volume":"1","author":"K. G. Kempf","year":"1985","unstructured":"Kempf, K. G. (1985) Manufacturing and artificial intelligence. Robotics, 1(1), 13?25.","journal-title":"Robotics"},{"key":"CR20","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1016\/0377-2217(88)90346-3","volume":"34","author":"A. Kusiak","year":"1988","unstructured":"Kusiak, A. and Chen, M. (1988) Expert systems for planning and scheduling manufacturing systems. European Journal of Operational Research, 34, 113?130.","journal-title":"European Journal of Operational Research"},{"key":"CR21","unstructured":"Le Pape, C. (1985) SOJA: a delay working scheduling system, SOJA's system and inference engine, in Proceedings of the 5th Technical Conference of the British Computer Society Specialist Group on Expert Systems, Warwick, UK, pp. 195-211."},{"key":"CR22","unstructured":"Le Pape, C. and Sauve, B. (1985) SOJA: un syst\u00e8me d'ordonnancement journalier d'atelier, in Proceedings of Cinqui\u00e8mes Journ\u00e9es Internationales: Les Syst\u00e8mes Experts et leurs Applications, Avignon, France, pp. 849?867."},{"issue":"1","key":"CR23","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1287\/opre.25.1.45","volume":"25","author":"S. S. Panwalkar","year":"1977","unstructured":"Panwalkar, S. S. and Iskander, W. (1977) A survey of scheduling rules. Operations Research, 25(1), 45?61.","journal-title":"Operations Research"},{"key":"CR24","series-title":"Research Report","volume-title":"Generation of knowledge about the control of a flow shop using data-analysis oriented learning techniques and simulation","author":"H. Pierreval","year":"1988","unstructured":"Pierreval, H. and Ralambondrainy, H. (1988) Generation of knowledge about the control of a flow shop using data-analysis oriented learning techniques and simulation, Research Report, INRIA, Rocquencourt, France, No. 897, September."},{"key":"CR25","unstructured":"Pierreval, H. and Ralambondrainy, H. (1989) Generation of knowledge about the control of a flow shop using simulation and a learning algorithm, in Computer Application in Production and Engineering, Kimura, F. and Rolstadas, A. (eds), North-Holland."},{"key":"CR26","first-page":"53","volume-title":"Utilisation de l'intelligence artificielle dans un probl\u00e8me d'ordonnancement","author":"J.-M. Proth","year":"1983","unstructured":"Proth, J.-M., Quinqueton, J., Ralambondrainy, H. and Voyiatzis, K. (1983a) Utilisation de l'intelligence artificielle dans un probl\u00e8me d'ordonnancement, in Proceedings of Congr\u00e8s Automatique: Productique et Robotique Intelligente, AFCET, Besan\u00e7on, France, 15?17 November, pp. 53?61."},{"key":"CR27","unstructured":"Proth, J.-M., Quinqueton, J., Ralambondrainy, H. and Voyiatzis, K. (1983b) Probl\u00e8me d'ordonnancement: utilisation de l'intelligence artificielle, Le Nouvel Automatisme, Novembre?D\u00e9cembre, pp. 59-62."},{"key":"CR28","doi-asserted-by":"crossref","unstructured":"Smith, S. F., Ow, P. S. and Matthys, D. C. (1989) OPIS: An opportunistic factory scheduling system, in Proceedings of International Symposium for Computer Scientists, Beijing, China.","DOI":"10.1145\/98784.98830"},{"key":"CR29","unstructured":"Steffen, M. S. (1986) A survey of artificial intelligence-based scheduling systems, in Proceedings of Fall Industrial Engineering Conference, Dec. 7?10, Boston, MA, pp. 395-405."},{"key":"CR30","unstructured":"Voyiatzis, K. (1987) Utilisation de l'intelligence artificielle pour les probl\u00e8mes d'ordonnancement, 3rd Cycle Thesis, University of Paris Dauphine."},{"key":"CR31","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1007\/BF01471188","volume":"1","author":"Y. Yih","year":"1990","unstructured":"Yih, Y. (1990) Trace-driven knowledge acquisition (TDKA) for rule-based real time scheduling systems. Journal of Intelligent Manufacturing, 1, 217?230.","journal-title":"Journal of Intelligent Manufacturing"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF00123908.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF00123908\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF00123908","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,4,3]],"date-time":"2020-04-03T16:43:56Z","timestamp":1585932236000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF00123908"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1993,4]]},"references-count":31,"journal-issue":{"issue":"2","published-print":{"date-parts":[[1993,4]]}},"alternative-id":["BF00123908"],"URL":"https:\/\/doi.org\/10.1007\/bf00123908","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[1993,4]]}}}