{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,1]],"date-time":"2022-04-01T15:17:21Z","timestamp":1648826241404},"reference-count":13,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[1991,11,1]],"date-time":"1991-11-01T00:00:00Z","timestamp":688953600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["ZOR - Methods and Models of Operations Research"],"published-print":{"date-parts":[[1991,11]]},"DOI":"10.1007\/bf01415992","type":"journal-article","created":{"date-parts":[[2005,4,3]],"date-time":"2005-04-03T14:51:26Z","timestamp":1112539886000},"page":"505-532","source":"Crossref","is-referenced-by-count":1,"title":["An analysis of setup cost reduction in a two stage system"],"prefix":"10.1007","volume":"35","author":[{"given":"M. J.","family":"Paknejad","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"F.","family":"Nasri","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"J. F.","family":"Affisco","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"CR1","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1016\/0377-2217(87)90136-6","volume":"31","author":"PV Beek","year":"1987","unstructured":"Beek PV, Putten CV (1987) OR contributions to flexibility improvement in production\/inventory systems. Europ J Oper Res 31:52?60","journal-title":"Europ J Oper Res"},{"issue":"1","key":"CR2","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1111\/j.1540-5915.1987.tb01501.x","volume":"18","author":"PJ Billington","year":"1987","unstructured":"Billington PJ (1987) The classic economic production quantity model with setup cost as a function of capital expenditure. Decision Sci 18(1):25?42","journal-title":"Decision Sci"},{"issue":"4","key":"CR3","first-page":"94","volume":"26","author":"YP Esrock","year":"1985","unstructured":"Esrock YP (1985) The impact of reduced setup time. Production and Inventory Management 26(4):94?106","journal-title":"Production and Inventory Management"},{"key":"CR4","volume-title":"Zero Inventories","author":"R Hall","year":"1983","unstructured":"Hall R (1983) Zero Inventories. Dow Jones-Irwin, Homewood, Illinois"},{"key":"CR5","unstructured":"Monden Y (1981) What makes the Toyota production system really tick? Industrial Engineering, pp 36?46"},{"key":"CR6","volume-title":"Toyota Production Systems: Practical Approach to Production Management","author":"Y Monden","year":"1981","unstructured":"Monden Y (1981) Toyota Production Systems: Practical Approach to Production Management. Industrial Engineering and Management Press, Atlanta, Georgia"},{"key":"CR7","unstructured":"Paknejad MJ, Affisco JF (1987) The effect of investment in new technology on optimal batch quantity. Proceedings of the Northeast Decision Sciences Institute, pp 118?120"},{"key":"CR8","unstructured":"Paknejad MJ, Nasri F (1988) Setup cost reduction in the classical production lot size with backorders model. Proceedings of the Northeast Decision Sciences Institute, pp 82?86"},{"key":"CR9","volume-title":"Decision Systems for Inventory Management and Production Planning","author":"R Peterson","year":"1979","unstructured":"Peterson R, Silver EA (1979) Decision Systems for Inventory Management and Production Planning. Wiley: New York"},{"issue":"8","key":"CR10","doi-asserted-by":"crossref","first-page":"998","DOI":"10.1287\/mnsc.31.8.998","volume":"31","author":"E Porteus","year":"1985","unstructured":"Porteus E (1985) Investing in reduced setups in the EOQ model. Management Sci 31(8):998?1010","journal-title":"Management Sci"},{"key":"CR11","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1002\/nav.3800330104","volume":"33","author":"E Porteus","year":"1986","unstructured":"Porteus E (1986) Investing in new parameter values in the discounted EOQ model. Naval Research Logistics Quarterly 33:39?48","journal-title":"Naval Research Logistics Quarterly"},{"key":"CR12","volume-title":"Japanese Manufacturing Techniques ? Hidden Lessons in Simplicity","author":"R Schonberger","year":"1982","unstructured":"Schonberger R (1982) Japanese Manufacturing Techniques ? Hidden Lessons in Simplicity. Free Press, New York"},{"key":"CR13","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1080\/00207547708943149","volume":"15","author":"Y Sugimori","year":"1977","unstructured":"Sugimori Y, Kusunoki K, Cha F, Uchikowa S (1977) Toyota production systems and kanban System ? Materialization of Just-In-Time and Respect for Human systems. Inter J Prod Res 15:553?564","journal-title":"Inter J Prod Res"}],"container-title":["ZOR Zeitschrift f\ufffdr Operations Research Methods and Models of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF01415992.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF01415992\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF01415992","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,2]],"date-time":"2019-05-02T17:12:39Z","timestamp":1556817159000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF01415992"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1991,11]]},"references-count":13,"journal-issue":{"issue":"6","published-print":{"date-parts":[[1991,11]]}},"alternative-id":["BF01415992"],"URL":"https:\/\/doi.org\/10.1007\/bf01415992","relation":{},"ISSN":["0340-9422","1432-5217"],"issn-type":[{"value":"0340-9422","type":"print"},{"value":"1432-5217","type":"electronic"}],"subject":[],"published":{"date-parts":[[1991,11]]}}}