{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,7]],"date-time":"2025-10-07T14:25:56Z","timestamp":1759847156975},"reference-count":11,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[1994,10,1]],"date-time":"1994-10-01T00:00:00Z","timestamp":780969600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["ZOR - Methods and Models of Operations Research"],"published-print":{"date-parts":[[1994,10]]},"DOI":"10.1007\/bf01435460","type":"journal-article","created":{"date-parts":[[2005,4,12]],"date-time":"2005-04-12T10:32:35Z","timestamp":1113301955000},"page":"305-319","source":"Crossref","is-referenced-by-count":3,"title":["On non-permutation solutions to some two machine flow shop scheduling problems"],"prefix":"10.1007","volume":"39","author":[{"given":"Vitaly A.","family":"Strusevich","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Carin M.","family":"Zwaneveld","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"CR1","volume-title":"Theory of scheduling","author":"RW Conway","year":"1967","unstructured":"Conway RW, Maxwell WL, Miller LW (1967) Theory of scheduling. Addison-Wesley, Reading"},{"key":"CR2","volume-title":"Computers and intractability: a guide to the theory ofNP-completeness","author":"MR Garey","year":"1979","unstructured":"Garey MR, Johnson DS (1979) Computers and intractability: a guide to the theory ofNP-completeness, Freeman, San Francisco"},{"key":"CR3","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1287\/moor.1.2.117","volume":"1","author":"MR Garey","year":"1976","unstructured":"Garey MR, Johnson DS, Sethi R (1976) The complexity of flow shop and job shop scheduling. Mathematics of Operations Research 1:117?129","journal-title":"Mathematics of Operations Research"},{"key":"CR4","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1287\/opre.12.5.655","volume":"12","author":"PC Gilmore","year":"1964","unstructured":"Gilmore PC, Gomory RE (1964) Sequencing a one-state variable machine: a solvable case of the traveling salesman problem. Operations Research 12:665?679","journal-title":"Operations Research"},{"key":"CR5","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"SM Johnson","year":"1954","unstructured":"Johnson SM (1954) Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly 1:61?68","journal-title":"Naval Research Logistics Quarterly"},{"key":"CR6","unstructured":"Lawler EL, Lenstra JK, Rinnooy Kan AHG, Shmoys DB (1993) Sequencing and scheduling: algorithms and complexity. In: Handbook in operations research and management Science, Vol. 4: Logistics of production and inventory (Graves SC et al. eds), North-Holland 445?522"},{"key":"CR7","doi-asserted-by":"crossref","first-page":"533","DOI":"10.1145\/322203.322213","volume":"27","author":"CH Papadimitriou","year":"1980","unstructured":"Papadimitriou CH, Kanellakis PC (1980) Flowshop scheduling with limited temporary storage. Journal of the Association for Computing Machinery 27:533?549","journal-title":"Journal of the Association for Computing Machinery"},{"key":"CR8","doi-asserted-by":"crossref","first-page":"597","DOI":"10.1016\/0305-0548(93)90115-Y","volume":"20","author":"VA Strusevich","year":"1993","unstructured":"Strusevich VA (1993) Two machine open shop scheduling problem with setup, processing and removal times separated. Computers and Operations Research 20:597?611","journal-title":"Computers and Operations Research"},{"key":"CR9","doi-asserted-by":"crossref","first-page":"517","DOI":"10.1002\/nav.3800290313","volume":"29","author":"DR Sule","year":"1982","unstructured":"Sule DR (1982) Sequencingn jobs on two machines with setup, processing and removal times separated. Naval Research Logistics Quarterly 29:517?519","journal-title":"Naval Research Logistics Quarterly"},{"key":"CR10","doi-asserted-by":"crossref","first-page":"723","DOI":"10.1080\/00207548308942406","volume":"21","author":"DR Sule","year":"1983","unstructured":"Sule DR and Huang KY (1983) Sequencing on two and three machines with setup, processing and removal times separated. International Journal of Production Research 21:723?732","journal-title":"International Journal of Production Research"},{"key":"CR11","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1080\/05695557908974469","volume":"11","author":"T Yoshida","year":"1979","unstructured":"Yoshida T and Hitomi K (1979) Optimal two-stage production scheduling with setup times separated. AIIE Transactions 11:261?263","journal-title":"AIIE Transactions"}],"container-title":["ZOR Zeitschrift f\ufffdr Operations Research Mathematical Methods of Opeartions Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF01435460.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF01435460\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF01435460","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,3]],"date-time":"2019-05-03T10:17:17Z","timestamp":1556878637000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF01435460"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1994,10]]},"references-count":11,"journal-issue":{"issue":"3","published-print":{"date-parts":[[1994,10]]}},"alternative-id":["BF01435460"],"URL":"https:\/\/doi.org\/10.1007\/bf01435460","relation":{},"ISSN":["0340-9422","1432-5217"],"issn-type":[{"value":"0340-9422","type":"print"},{"value":"1432-5217","type":"electronic"}],"subject":[],"published":{"date-parts":[[1994,10]]}}}