{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,7]],"date-time":"2025-10-07T14:41:04Z","timestamp":1759848064611},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[1991,12,1]],"date-time":"1991-12-01T00:00:00Z","timestamp":691545600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[1991,12]]},"DOI":"10.1007\/bf01471941","type":"journal-article","created":{"date-parts":[[2005,4,13]],"date-time":"2005-04-13T16:14:03Z","timestamp":1113408843000},"page":"387-395","source":"Crossref","is-referenced-by-count":5,"title":["Intelligent heuristic for FMS scheduling using grouping"],"prefix":"10.1007","volume":"2","author":[{"given":"D.","family":"Ben-Arieh","sequence":"first","affiliation":[]},{"given":"M.","family":"Dror","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"CR1","unstructured":"Adiri, I. and Aizikowitz, N. (1987) Open shop scheduling problems with dominated machines,Operations Research, Statistics and Economics Mimeograph Series No. 383, Technion, Israel."},{"key":"CR2","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1016\/0305-0548(84)90016-9","volume":"11","author":"I. Adiri","year":"1984","unstructured":"Adiri, I. and Amit, N. (1984) Openshop and flowshop scheduling to minimize sum of completion times.Computers and Operations Research,11, 275?84.","journal-title":"Computers and Operations Research"},{"key":"CR3","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1080\/00207548708919825","volume":"25","author":"R. G. Askin","year":"1987","unstructured":"Askin, R. G. and Subramanian, S. P. (1987) A cost based heuristic for group technology configuration.International Journal of Production Research,25, 101?13.","journal-title":"International Journal of Production Research"},{"key":"CR4","doi-asserted-by":"crossref","first-page":"186","DOI":"10.1080\/09511928908944401","volume":"2","author":"D. Ben-Arieh","year":"1989","unstructured":"Ben-Arieh, D. and Dror, M. (1989) Group scheduling using group technology concept.International Journal of Computer Integrated Manufacturing,2, 186?93.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"CR5","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1109\/56.771","volume":"4","author":"D. Ben-Arieh","year":"1988","unstructured":"Ben-Arieh, D., Moodie, C. L. and Chu, C. C. (1988) Control methodology for FMS.IEEE Journal of Robotics and Automation,4, 53?9.","journal-title":"IEEE Journal of Robotics and Automation"},{"key":"CR6","unstructured":"Dror, M. (1990) Openshop Scheduling.Discrete Applied Mathematics, in press."},{"key":"CR7","volume-title":"Cluster Analysis","author":"B. Everitt","year":"1980","unstructured":"Everitt, B. (1980)Cluster Analysis, 2nd edn, Halsted Press, UK.","edition":"2nd edn"},{"key":"CR8","first-page":"301","volume-title":"Flexible Manufacturing Systems: Methods and Studies","author":"Z. Faber","year":"1986","unstructured":"Faber, Z. and Carter, M. W. (1986) A new graph theory approach for forming machine cells in cellular production systems, inFlexible Manufacturing Systems: Methods and Studies, Kusiak, A. (ed.), Elsevier Science, UK, pp. 301?15."},{"key":"CR9","unstructured":"Fox, M. S. (1983) Constraint directed search: a case study of job shop scheduling, PhD Thesis, Carnegie-Mellon University."},{"key":"CR10","doi-asserted-by":"crossref","unstructured":"Graham, R. L., Lawler, E. L., Lenstra, J. K. and Rinnooy Kan, A. H. G. (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey, inAnnals of Discrete Mathematics 5, Discrete Optimization 11, Hammer, P. L., Johnson, E. L. and Koite, B. H. (eds), pp. 287?326.","DOI":"10.1016\/S0167-5060(08)70356-X"},{"key":"CR11","first-page":"434","volume-title":"Automation, Production Systems and Computer Integrated Manufacturing","author":"M. P. Groover","year":"1987","unstructured":"Groover, M. P. (1987)Automation, Production Systems and Computer Integrated Manufacturing, Prentice Hall Inc., USA, pp. 434?9."},{"key":"CR12","doi-asserted-by":"crossref","first-page":"535","DOI":"10.1002\/nav.3800290316","volume":"29","author":"N. Hefetz","year":"1982","unstructured":"Hefetz, N. and Adiri, I. (1982) A note on the influence of missing operations on scheduling problems.Naval Research Logistics Quarterly,29, 535?9.","journal-title":"Naval Research Logistics Quarterly"},{"key":"CR13","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1080\/00207548008919662","volume":"18","author":"J. R. King","year":"1980","unstructured":"King, J. R. (1980) Machine-component grouping in production flow analysis: an approach using a rank order clustering algorithm.International Journal of Production Research,18, 213?32.","journal-title":"International Journal of Production Research"},{"key":"CR14","doi-asserted-by":"crossref","first-page":"1057","DOI":"10.1080\/00207548508904765","volume":"23","author":"A. Kusiak","year":"1985","unstructured":"Kusiak, A. (1985) Flexible manufacturing systems: a structural approach.International Journal of Production Research,23, 1057?73.","journal-title":"International Journal of Production Research"},{"key":"CR15","first-page":"56","volume":"Oct.","author":"A. Kusiak","year":"1987","unstructured":"Kusiak, A. (1987a) An expert system for group technology,Industrial Engineering,Oct., 56?60.","journal-title":"Industrial Engineering"},{"key":"CR16","doi-asserted-by":"crossref","first-page":"561","DOI":"10.1080\/00207548708919861","volume":"25","author":"A. Kusiak","year":"1987","unstructured":"Kusiak, A. (1987b) The generalized group technology concept.International Journal of Production Research,25, 561?9.","journal-title":"International Journal of Production Research"},{"key":"CR17","doi-asserted-by":"crossref","first-page":"60","DOI":"10.1093\/comjnl\/9.1.60","volume":"9","author":"G. N. Lance","year":"1966","unstructured":"Lance, G. N. and Williams, W. T. (1966) Computer programs for hierarchical polythetic classification.Computer Journal,9, 60?4.","journal-title":"Computer Journal"},{"key":"CR18","doi-asserted-by":"crossref","first-page":"202","DOI":"10.1007\/978-3-642-68874-4_9","volume-title":"Mathematical Programming The State of the Art","author":"E. L. Lawler","year":"1983","unstructured":"Lawler, E. L. (1983) Recent results in theory of machine scheduling, inMathematical Programming The State of the Art, Gehem, A., Grostchel, M. and Korte, B. (eds), Springer-Verlag, Germany, pp. 202?34."},{"key":"CR19","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1049\/tpe.1972.0006","volume":"52","author":"J. McAuley","year":"1972","unstructured":"McAuley, J. (1972) Machine grouping for efficient production.Production Engineering,52, 53?7.","journal-title":"Production Engineering"},{"key":"CR20","doi-asserted-by":"crossref","first-page":"992","DOI":"10.1287\/opre.20.5.993","volume":"20","author":"W. T. McCormick","year":"1972","unstructured":"McCormick, W. T., Schweitzer, P. J. and White, T. E. (1972) Problem decomposition and data reorganization by a clustering technique.Operations Research,20, 992?1009.","journal-title":"Operations Research"},{"key":"CR21","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1080\/00207547108929870","volume":"9","author":"H. Opitz","year":"1971","unstructured":"Opitz, H. and Wiendahl, H. P. (1971) Group technology and manufacturing systems for small and medium quantity production.International Journal of Production Research,9, 181?203.","journal-title":"International Journal of Production Research"},{"key":"CR22","unstructured":"Schweitzer, P. and Seidman, A. (1990a) Part mix and capacity allocation, inProceedings of the FMS, TIMS\/ORSA Conference, Las Vegas."},{"key":"CR23","unstructured":"Schweitzer, P. and Seidman, A. (1990b) Performance management models for flexible manufacturing systems, inProceedings of the TIMS\/ORSA Conference, Philadelphia."},{"key":"CR24","first-page":"1409","volume":"38","author":"R. R. Sokal","year":"1958","unstructured":"Sokal, R. R., and Michener, C. D. (1958) A statistical method for evaluating systematic relationships.University of Kansas Science Bulletin,38, 1409?38.","journal-title":"University of Kansas Science Bulletin"},{"key":"CR25","unstructured":"Styslinger, T. S. and Melkanoff, M. A. (1985) Group technology for electronic assembly, inProceedings of the Conference for FMS for Electronics (Cambridge, Massachusetts)."}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF01471941.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF01471941\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF01471941","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,2]],"date-time":"2019-05-02T15:07:28Z","timestamp":1556809648000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF01471941"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1991,12]]},"references-count":25,"journal-issue":{"issue":"6","published-print":{"date-parts":[[1991,12]]}},"alternative-id":["BF01471941"],"URL":"https:\/\/doi.org\/10.1007\/bf01471941","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[1991,12]]}}}