{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,4]],"date-time":"2026-10-04T09:08:18Z","timestamp":1791104898132,"version":"4.1.0"},"reference-count":23,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[1998,6,1]],"date-time":"1998-06-01T00:00:00Z","timestamp":896659200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Mathematical Programming"],"published-print":{"date-parts":[[1998,6]]},"DOI":"10.1007\/bf01585872","type":"journal-article","created":{"date-parts":[[2005,4,28]],"date-time":"2005-04-28T04:42:50Z","timestamp":1114663370000},"page":"199-223","source":"Crossref","is-referenced-by-count":90,"title":["Minimizing average completion time in the presence of release dates"],"prefix":"10.1007","volume":"82","author":[{"given":"Cynthia","family":"Phillips","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Clifford","family":"Stein","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Joel","family":"Wein","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"key":"CR1","volume-title":"Introduction to Sequencing and Scheduling","author":"K.R. Baker","year":"1974","unstructured":"K.R. Baker, Introduction to Sequencing and Scheduling, Wiley, New York, 1974."},{"key":"CR2","doi-asserted-by":"crossref","first-page":"382","DOI":"10.1145\/361011.361064","volume":"17","author":"J.L. Bruno","year":"1974","unstructured":"J.L. Bruno, E.G. Coffman, R. Sethi, Scheduling independent tasks to reduce mean finishing time, Communications of the ACM 17 (1974) 382\u2013387.","journal-title":"Communications of the ACM"},{"key":"CR3","first-page":"646","volume-title":"Proceedings of the 1996 ICALP Conference, Lecture notes in Computer Science 1099","author":"S. Chakrabarti","year":"1996","unstructured":"S. Chakrabarti, C. Phillips, A.S. Schulz, D.B. Shmoys, C. Stein, J. Wein, Improved approximation algorithms for minsum criteria, in: Proceedings of the 1996 ICALP Conference, Lecture notes in Computer Science 1099, Springer, Berlin, 1996, pp. 646\u2013657."},{"key":"CR4","volume-title":"Introduction to Algorithms","author":"Thomas H. Cormen","year":"1990","unstructured":"Thomas H. Cormen, Charles E. Leiserson, Ronald L. Rivest, Introduction to Algorithms, MIT Press, Cambridge, MA; McGraw-Hill, New York, 1990."},{"key":"CR5","doi-asserted-by":"crossref","unstructured":"J. Du, J.Y.T. Leung, G.H. Young, Minimizing mean flow time with release time constraint, Theoretical Computer Science 75 (1990).","DOI":"10.1016\/0304-3975(90)90100-V"},{"key":"CR6","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1145\/321978.321985","volume":"23","author":"T. Gonzalez","year":"1976","unstructured":"T. Gonzalez, S. Sahni, Open shop scheduling to minimize finish time, Journal of the ACM 23 (1976) 665\u2013679.","journal-title":"Journal of the ACM"},{"key":"CR7","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R.L. Graham","year":"1979","unstructured":"R.L. Graham, E.L. Lawler, J.K. Lenstra, A.H.G. Rinnooy Kan, Optimization and approximation in deterministic sequencing and scheduling: A survey, Annals of Discrete Mathematics 5 (1979) 287\u2013326.","journal-title":"Annals of Discrete Mathematics"},{"key":"CR8","doi-asserted-by":"crossref","first-page":"513","DOI":"10.1287\/moor.22.3.513","volume":"3","author":"L.A. Hall","year":"1997","unstructured":"L.A. Hall, A.S. Schulz, D.B. Shmoys, J. Wein, Scheduling to minimize average completion time: Offline and on-line approximation algorithm, Mathematics of Operations Research 3 (1997) 513\u2013544.","journal-title":"Mathematics of Operations Research"},{"key":"CR9","doi-asserted-by":"crossref","first-page":"539","DOI":"10.1137\/0217033","volume":"17","author":"D.S. Hochbaum","year":"1998","unstructured":"D.S. Hochbaum, D.B. Shmoys, A polynomial approximation scheme for machine scheduling on uniform processors: Using the dual approximation approach, SIAM Journal on Computing 17 (1998) 539\u2013551.","journal-title":"SIAM Journal on Computing"},{"key":"CR10","doi-asserted-by":"crossref","unstructured":"J.A. Hoogeveen, A.P.A. Vestjens, Optimal on-line algorithms for single-machine scheduling, in: Proceedings of the Fifth Conference on Integer Programming and Combinatorial Optimization, 1996, pp. 404\u2013414.","DOI":"10.1007\/3-540-61310-2_30"},{"key":"CR11","doi-asserted-by":"crossref","first-page":"846","DOI":"10.1287\/opre.21.3.846","volume":"21","author":"W. Horn","year":"1973","unstructured":"W. Horn, Minimizing average flow time with parallel machines, Operations Research 21 (1973) 846\u2013847.","journal-title":"Operations Research"},{"key":"CR12","doi-asserted-by":"crossref","first-page":"1119","DOI":"10.1137\/0215081","volume":"15","author":"T. Kawaguchi","year":"1986","unstructured":"T. Kawaguchi, S. Kyan, Worst case bound of an LRF schedule for the mean weighted flow-time problem, SIAM Journal on Computing 15 (1986) 1119\u20131129.","journal-title":"SIAM Journal on Computing"},{"key":"CR13","doi-asserted-by":"crossref","unstructured":"H. Kellerer, T. Tautenhahn, G.J. Woeginger, Approximability and nonapproximability results for minimizing total time on a single machine, in: Proceedings of the 28th Annual ACM Symposium on Theory of Computing, May 1996, pp. 418\u2013426.","DOI":"10.1145\/237814.237989"},{"key":"CR14","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1016\/B978-0-12-566780-7.50020-9","volume-title":"Progress in Combinatorial Optimization","author":"J. Labetoulle","year":"1984","unstructured":"J. Labetoulle, E.L. Lawler, J.K. Lenstra, A.H.G. Rinnooy Kan, Preemptive scheduling of uniform machines subject to release dates, in: W.R. Pulleyblank (Ed.), Progress in Combinatorial Optimization, Academic Press, New York, 1984, pp. 245\u2013261."},{"key":"CR15","unstructured":"T.C. Lai, Personal communication, May 1995."},{"key":"CR16","first-page":"445","volume-title":"Handbooks in Operations Research and Management Science, vol. 4","author":"E.L. Lawler","year":"1993","unstructured":"E.L. Lawler, J.K. Lenstra, A.H.G. Rinnooy Kan, D.B. Shmoys, Sequencing and scheduling: Algorithms and complexity, in: S.C. Graves, A.H.G. Rinnooy Kan, P.H. Zipkin (Eds.), Handbooks in Operations Research and Management Science, vol. 4, Logistics of Production and Inventory, North-Holland, Amsterdam, 1993, pp. 445\u2013522."},{"key":"CR17","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1016\/S0167-5060(08)70743-X","volume":"1","author":"J.K. Lenstra","year":"1977","unstructured":"J.K. Lenstra, A.H.G. Rinnooy Kan, P. Brucker, Complexity of machine scheduling problems, Annals of Discrete Mathematics 1 (1977) 343\u2013362.","journal-title":"Annals of Discrete Mathematics"},{"key":"CR18","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/mnsc.6.1.1","volume":"6","author":"R. McNaughton","year":"1959","unstructured":"R. McNaughton, Scheduling with deadlines and loss functions, Management Science 6 (1959) 1\u201312.","journal-title":"Management Science"},{"key":"CR19","unstructured":"R. Motwani, S. Phillips, E. Torng, Non-clairvoyant scheduling, in: Proceedings of the Fourth ACM-SIAM Symposium on Discrete Algorithms, January 1993, pp. 422\u2013431."},{"issue":"4","key":"CR20","doi-asserted-by":"crossref","first-page":"573","DOI":"10.1137\/S0895480194279057","volume":"10","author":"C. Phillips","year":"1997","unstructured":"C. Phillips, C. Stein, J. Wein, Task scheduling in networks, SIAM Journal on Discrete Mathematics 10 (4) (1997) 573\u2013598.","journal-title":"SIAM Journal on Discrete Mathematics"},{"issue":"3","key":"CR21","doi-asserted-by":"crossref","first-page":"617","DOI":"10.1137\/S009753979222676X","volume":"23","author":"D.B. Shmoys","year":"1994","unstructured":"D.B. Shmoys, C. Stein, J. Wein, Improved approximation algorithms for shop scheduling problems, SIAM Journal on Computing 23 (3) (1994) 617\u2013632.","journal-title":"SIAM Journal on Computing"},{"key":"CR22","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1002\/nav.3800030106","volume":"3","author":"W.E. Smith","year":"1956","unstructured":"W.E. Smith, Various optimizers for single-stage production, Naval Research Logistics Quarterly 3 (1956) 59\u201366.","journal-title":"Naval Research Logistics Quarterly"},{"key":"CR23","unstructured":"L. Stougie, 1995, Personal communication cited in [10]."}],"container-title":["Mathematical Programming"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF01585872.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF01585872\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF01585872","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,3]],"date-time":"2019-05-03T11:32:33Z","timestamp":1556883153000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF01585872"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1998,6]]},"references-count":23,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[1998,6]]}},"alternative-id":["BF01585872"],"URL":"https:\/\/doi.org\/10.1007\/bf01585872","relation":{},"ISSN":["0025-5610","1436-4646"],"issn-type":[{"value":"0025-5610","type":"print"},{"value":"1436-4646","type":"electronic"}],"subject":[],"published":{"date-parts":[[1998,6]]}}}