{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,31]],"date-time":"2025-10-31T13:52:14Z","timestamp":1761918734335},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[1993,9,1]],"date-time":"1993-09-01T00:00:00Z","timestamp":746841600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[1993,9]]},"DOI":"10.1007\/bf02023074","type":"journal-article","created":{"date-parts":[[2005,8,12]],"date-time":"2005-08-12T12:47:48Z","timestamp":1123850868000},"page":"185-206","source":"Crossref","is-referenced-by-count":14,"title":["Preventive maintenance scheduling of power generating units"],"prefix":"10.1007","volume":"41","author":[{"given":"Mich\u00e8le","family":"Charest","sequence":"first","affiliation":[]},{"given":"Jacques A.","family":"Ferland","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"BF02023074_CR1","unstructured":"J. Aubin, Une approche heuristique pour la confection d'horaires de C\u00e9gep, Master Thesis, D\u00e9partement d'Informatique et de Recherche Op\u00e9rationnelle, Universit\u00e9 de Montr\u00e9al (1985)."},{"key":"BF02023074_CR2","unstructured":"G. C\u00f4t\u00e9 and L. Lafond, Planification \u00e0 long terme des entretiens d'\u00e9quipements de production: l\u00e8re partie \u2014 Pr\u00e9sentation du probl\u00e8me et mod\u00e9lisation propos\u00e9e, Rapport IREQ-2647 (1982)."},{"key":"BF02023074_CR3","unstructured":"G. C\u00f4t\u00e9 and L. Lafond, Planification \u00e0 long terme des entretiens d'\u00e9quipements de production: 2ieme partie \u2014 Description d'une formulation math\u00e9matique et d'une m\u00e9thode de r\u00e9solution bas\u00e9e sur une approche de r\u00e9seau g\u00e9n\u00e9ralis\u00e9, Rapport IREQ-2735 (1983)."},{"key":"BF02023074_CR4","unstructured":"J.A. Ferland and M. Florian, A sub-optimal algorithm to solve a large scale 0\u20131 programming problem,Proc. 9th Int. Mathematical Programming Symp., Budapest (1976) pp. 23\u201327."},{"key":"BF02023074_CR5","doi-asserted-by":"crossref","first-page":"237","DOI":"10.1016\/0166-218X(92)90247-8","volume":"35","author":"J.A. Ferland","year":"1992","unstructured":"J.A. Ferland and A. Lavoie, Exchange procedures for timetabling problems, Discr. Appl. Math. 35(1992)237\u2013253.","journal-title":"Discr. Appl. Math."},{"key":"BF02023074_CR6","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1287\/inte.15.2.10","volume":"15","author":"M.L. Fisher","year":"1985","unstructured":"M.L. Fisher, An application oriented guide to Lagrangian relaxation, Interfaces 15(1985)10\u201321.","journal-title":"Interfaces"},{"key":"BF02023074_CR7","unstructured":"C. Fleurent, M\u00e9thodes heuristiques pour la conception de calendriers sportifs, Master Thesis, D\u00e9partement d'Informatique et de Recherche Op\u00e9rationnelle, Universit\u00e9 de Montr\u00e9al (1987)."},{"key":"BF02023074_CR8","unstructured":"F. Glover, Tabu search, CAAI Report 88-3 (1988)."},{"key":"BF02023074_CR9","doi-asserted-by":"crossref","first-page":"12","DOI":"10.1287\/inte.9.4.12","volume":"9","author":"F. Glover","year":"1979","unstructured":"F. Glover, J. Hultz and D. Klingman, Improved computer-based planning techniques: Part II, Interfaces 9(1979)12\u201320.","journal-title":"Interfaces"},{"key":"BF02023074_CR10","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1007\/BF01580223","volume":"6","author":"M.H. Held","year":"1974","unstructured":"M.H. Held, P. Wolfe and H.D. Crowder, Validation of subgradient optimization, Math. Progr. 6(1974)62\u201388.","journal-title":"Math. Progr."},{"key":"BF02023074_CR11","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1016\/0305-0548(79)90028-5","volume":"6","author":"T.D. Klastorin","year":"1979","unstructured":"T.D. Klastorin, An effective subgradient algorithm for the generalized assignment problem, Comp. Oper. Res. 6(1979)155\u2013164.","journal-title":"Comp. Oper. Res."},{"key":"BF02023074_CR12","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1016\/0305-0548(79)90028-5","volume":"6","author":"B.L. Kralj","year":"1979","unstructured":"B.L. Kralj and R. Petrovi\u0107, Optimal preventive maintenance scheduling of thermal generating units in power systems \u2014 A survey of problem formulations and solution methods, Comp. Oper. Res. 6(1979)155\u2013164.","journal-title":"Comp. Oper. Res."},{"key":"BF02023074_CR13","doi-asserted-by":"crossref","first-page":"1017","DOI":"10.1109\/32.31358","volume":"SE-8","author":"A. Kusiak","year":"1989","unstructured":"A. Kusiak and S.S. Heragu, Expert systems and optimization, IEEE Trans. Software Eng. SE-8(1989)1017\u20131020.","journal-title":"IEEE Trans. Software Eng."},{"key":"BF02023074_CR14","unstructured":"A. Lavoie, M\u00e9thodes d'\u00e9changes pour probl\u00e8mes d'affectation, Master Thesis, D\u00e9partement d'Informatique et de Recherche Op\u00e9rationnelle, Universit\u00e9 de Montr\u00e9al (1989)."},{"key":"BF02023074_CR15","doi-asserted-by":"crossref","first-page":"560","DOI":"10.1287\/opre.34.4.560","volume":"34","author":"J.B. Mazzola","year":"1986","unstructured":"J.B. Mazzola and A.W. Neebe, Resource-constrainted assignment scheduling, Oper. Res. 34(1986)560\u2013572.","journal-title":"Oper. Res."},{"key":"BF02023074_CR16","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1007\/BF01580430","volume":"8","author":"G.T. Ross","year":"1975","unstructured":"G.T. Ross and R.M. Soland, A branch and bound algorithm for the generalised assignment problem, Math. Progr. 8(1975)91\u2013103.","journal-title":"Math. Progr."},{"key":"BF02023074_CR17","unstructured":"S. Roy, Probl\u00e8me d'affectation g\u00e9n\u00e9ralis\u00e9e avec conflits: application au probl\u00e8me de confection d'horaires de cours, Master Thesis, D\u00e9partement d'Informatique et de Recherche Op\u00e9rationnelle, Universit\u00e9 de Montr\u00e9al (1982)."}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02023074.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF02023074\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02023074","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,13]],"date-time":"2019-05-13T22:39:57Z","timestamp":1557787197000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF02023074"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1993,9]]},"references-count":17,"journal-issue":{"issue":"3","published-print":{"date-parts":[[1993,9]]}},"alternative-id":["BF02023074"],"URL":"https:\/\/doi.org\/10.1007\/bf02023074","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[1993,9]]}}}