{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,23]],"date-time":"2026-08-23T18:33:38Z","timestamp":1787510018527,"version":"build-2736575974"},"reference-count":23,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[1995,7,1]],"date-time":"1995-07-01T00:00:00Z","timestamp":804556800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[1995,7]]},"DOI":"10.1007\/bf02057160","type":"journal-article","created":{"date-parts":[[2005,8,12]],"date-time":"2005-08-12T11:19:08Z","timestamp":1123845548000},"page":"493-517","source":"Crossref","is-referenced-by-count":34,"title":["Scheduling multiprocessor tasks on a dynamic configuration of dedicated processors"],"prefix":"10.1007","volume":"58","author":[{"given":"L.","family":"Bianco","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"J.","family":"Blazewicz","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"P.","family":"Dell'Olmo","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"M.","family":"Drozdowski","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"key":"BF02057160_CR1","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1016\/0743-7315(92)90015-F","volume":"16","author":"M.J. Atallah","year":"1992","unstructured":"M.J. Atallah, C. Lock Black and D.C. Marinescu, Models and algorithms for coscheduling computer-intensive tasks on a network of workstations, J. Parallel Distributed Comput. 16(1992)319\u2013327.","journal-title":"J. Parallel Distributed Comput."},{"key":"BF02057160_CR2","volume-title":"Introduction to Sequencing and Scheduling","author":"K.R. Baker","year":"1974","unstructured":"K.R. Baker,Introduction to Sequencing and Scheduling, (Wiley, New York, 1974)."},{"key":"BF02057160_CR3","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1016\/0166-5316(94)90058-2","volume":"20","author":"L. Bianco","year":"1994","unstructured":"L. Bianco, J. Bla\u017cewicz, P. Dell'Olmo and M. Drozdowski, Scheduling preemptive multiprocessor tasks on dedicated processors, Perf. Eval. 20(1994)361\u2013371.","journal-title":"Perf. Eval."},{"key":"BF02057160_CR4","doi-asserted-by":"crossref","first-page":"246","DOI":"10.1080\/05695557008974759","volume":"2","author":"G. Bozoki","year":"1970","unstructured":"G. Bozoki and J.P. Richard, A branch-and-bound algorithm for continuous-process task shop scheduling problem, AIIE Trans. 2(1970)246\u2013252.","journal-title":"AIIE Trans."},{"key":"BF02057160_CR5","volume-title":"Scheduling under Resource Constraints: Deterministic Models","author":"J. Bla\u017cewicz","year":"1986","unstructured":"J. Bla\u017cewicz, W. Cellary, R. Slowi\u0144ski and J. W\u0119glarz,Scheduling under Resource Constraints: Deterministic Models (J.C. Baltzer, Basel, 1986)."},{"key":"BF02057160_CR6","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1016\/0020-0190(92)90172-R","volume":"41","author":"J. Bla\u017cewicz","year":"1992","unstructured":"J. Bla\u017cewicz, P. Dell'Olmo, M. Drozdowski and M.G. Speranza, Scheduling multiprocessor tasks on three dedicated processors, IPL 41(1992)275\u2013280.","journal-title":"IPL"},{"key":"BF02057160_CR7","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1109\/TC.1986.1676781","volume":"35","author":"J. Bla\u017cewicz","year":"1986","unstructured":"J. Bla\u017cewicz, M. Drabowski and J. W\u0119glarz, Scheduling multiprocessor tasks to minimize schedule length, IEEE Trans. Comput. C-35(1986)389\u2013393.","journal-title":"IEEE Trans. Comput."},{"key":"BF02057160_CR8","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1016\/0167-8191(94)90110-4","volume":"20","author":"J. Bla\u017cewicz","year":"1994","unstructured":"J. Bla\u017cewicz, M. Drozdowski, G. Schmidt and D. de Werra, Scheduling independent multiprocessor tasks on a uniformk-processor system, Parallel Comput. 20(1994)15\u201328.","journal-title":"Parallel Comput."},{"key":"BF02057160_CR9","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-00074-8","volume-title":"Scheduling in Computer and Manufacturing Systems","author":"J. Bla\u017cewicz","year":"1993","unstructured":"J. Bla\u017cewicz, K. Ecker, G. Schmidt and J. W\u0119glarz,Scheduling in Computer and Manufacturing Systems (Springer, New York, 1993)."},{"key":"BF02057160_CR10","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J. Bla\u017cewicz","year":"1983","unstructured":"J. Bla\u017cewicz, J.K. Lenstra and A.H.G. Rinnooy Kan, Scheduling subject to resource constraints: Classification of complexity, Discr. Appl. Math. 5(1983)11\u201324.","journal-title":"Discr. Appl. Math."},{"key":"BF02057160_CR11","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1016\/0020-0190(88)90209-8","volume":"28","author":"G.I. Chen","year":"1988","unstructured":"G.I. Chen and T.H. Lai, Preemptive scheduling of independent jobs on a hypercube, IPL 28(1988)201\u2013206.","journal-title":"IPL"},{"key":"BF02057160_CR12","volume-title":"Computer and Job-Shop Scheduling Theory","year":"1976","unstructured":"E.G. Coffman, Jr. (ed.),Computer and Job-Shop Scheduling Theory (Wiley, New York, 1976)."},{"key":"BF02057160_CR13","doi-asserted-by":"crossref","first-page":"473","DOI":"10.1137\/0402042","volume":"2","author":"J. Du","year":"1989","unstructured":"J. Du and J.Y.-T. Leung, Complexity of scheduling parallel task systems, SIAM J. Discr. Math. 2(1989)473\u2013487.","journal-title":"SIAM J. Discr. Math."},{"key":"BF02057160_CR14","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R.I. Graham","year":"1979","unstructured":"R.I. Graham, E.L. Lawler, J.K. Lenstra and A.H.G. Rinnooy Kan, Optimization and approximation in deterministic sequencing and scheduling: A survey, Ann. Discr. Math. 5(1979)287\u2013326.","journal-title":"Ann. Discr. Math."},{"key":"BF02057160_CR15","doi-asserted-by":"crossref","first-page":"306","DOI":"10.1016\/0743-7315(92)90014-E","volume":"16","author":"D.G. Feitelson","year":"1992","unstructured":"D.G. Feitelson and L. Rudoloh, Gang scheduling performance benefits for fine-grain synchronization, J. Parallel Distributed Comput. 16(1992)306\u2013318.","journal-title":"J. Parallel Distributed Comput."},{"key":"BF02057160_CR16","doi-asserted-by":"crossref","first-page":"352","DOI":"10.1016\/0743-7315(92)90018-I","volume":"16","author":"R. Jain","year":"1992","unstructured":"R. Jain, K. Somalwar, J. Werth and J.C. Browne, Scheduling parallel I\/O operations in multiple bus systems, J. Parallel Distributed Comput. 16(1992)352\u2013362.","journal-title":"J. Parallel Distributed Comput."},{"key":"BF02057160_CR17","doi-asserted-by":"crossref","first-page":"869","DOI":"10.1109\/TC.1985.1676647","volume":"34","author":"H. Krawczyk","year":"1985","unstructured":"H. Krawczyk and M. Kubale, An approximation algorithm for diagnostic test scheduling in multicomputer systems, IEEE Trans. Comput. C-34(1985)869\u2013872.","journal-title":"IEEE Trans. Comput."},{"key":"BF02057160_CR18","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1016\/0020-0190(87)90176-1","volume":"24","author":"M. Kubale","year":"1987","unstructured":"M. Kubale, The complexity of scheduling independent two-processor tasks on dedicated processors, IPL 24(1987)141\u2013147.","journal-title":"IPL"},{"issue":"1082","key":"BF02057160_CR19","first-page":"147","volume":"100","author":"M. Kubale","year":"1990","unstructured":"M. Kubale, Preemptive scheduling of two-processor tasks on dedicated processors, Zeszyty Naukowe Politechniki \u015al\u0105skiej, Seria: Automatyka z. 100, No. 1082 (1990) 147\u2013153, in Polish.","journal-title":"Seria: Automatyka z."},{"key":"BF02057160_CR20","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1016\/0020-0190(90)90096-G","volume":"34","author":"J. Plehn","year":"1990","unstructured":"J. Plehn, Preemptive scheduling of independent jobs with release times and deadlines on a hypercube IPL 34(1990)161\u2013166.","journal-title":"IPL"},{"key":"BF02057160_CR21","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/0167-8191(90)90056-F","volume":"16","author":"B. Veltman","year":"1990","unstructured":"B. Veltman, B.J. Lageweg and J.K. Lenstra, Multiprocessor scheduling with communication delays, Parallel Comput. 16(1990)173\u2013182.","journal-title":"Parallel Comput."},{"key":"BF02057160_CR22","volume-title":"Ph.D. Thesis","author":"B. Veltman","year":"1993","unstructured":"B. Veltman, Multiprocessor scheduling with communication delays, Ph.D. Thesis, CWI, Amsterdam (1993)."},{"key":"BF02057160_CR23","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1137\/0221021","volume":"21","author":"Q. Wang","year":"1992","unstructured":"Q. Wang and K.H. Cheng, A heuristic of scheduling parallel tasks and its analysis, SIAM J. Comput. 21(1992)281\u2013294.","journal-title":"SIAM J. Comput."}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02057160.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF02057160\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02057160","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,14]],"date-time":"2019-05-14T08:57:54Z","timestamp":1557824274000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF02057160"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1995,7]]},"references-count":23,"journal-issue":{"issue":"7","published-print":{"date-parts":[[1995,7]]}},"alternative-id":["BF02057160"],"URL":"https:\/\/doi.org\/10.1007\/bf02057160","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[1995,7]]}}}