{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,20]],"date-time":"2025-09-20T22:06:15Z","timestamp":1758405975568},"reference-count":19,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2002,9,1]],"date-time":"2002-09-01T00:00:00Z","timestamp":1030838400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2002,9]]},"DOI":"10.1007\/bf02936394","type":"journal-article","created":{"date-parts":[[2008,8,24]],"date-time":"2008-08-24T03:55:28Z","timestamp":1219550128000},"page":"407-417","source":"Crossref","is-referenced-by-count":3,"title":["A fast algorithm for time compression in project scheduling"],"prefix":"10.1007","volume":"2","author":[{"given":"K. P.","family":"Anagnostopoulos","sequence":"first","affiliation":[]}],"member":"297","reference":[{"issue":"3","key":"BF02936394_CR1","first-page":"315","volume":"1","author":"K. Anagnostopoulos","year":"2001","unstructured":"Anagnostopoulos, K. and Kotsikas, L. (2001). Time-Cost Trade-off in CPM Networks with Simulated Annealing. Operational Research, An International Journal, 1(3), September-December, 315\u2013329.","journal-title":"Operational Research, An International Journal"},{"key":"BF02936394_CR2","volume-title":"Project Management: Planning and Control","author":"R. Burke","year":"1993","unstructured":"Burke, R. (1993). Project Management: Planning and Control. 2nd Edition. J. Wiley, New York.","edition":"2nd Edition"},{"key":"BF02936394_CR3","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1287\/opre.15.3.407","volume":"15","author":"W. B. Crowston","year":"1967","unstructured":"Crowston, W. B. and Thompson, G. L. (1967). Decision CPM: A Method for Simultaneous Planning, Scheduling and Control of Projects. Operations Research, 15, 407\u2013426.","journal-title":"Operations Research"},{"key":"BF02936394_CR4","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1016\/0377-2217(94)00187-H","volume":"64","author":"P. De","year":"1995","unstructured":"De P., Dunne E. J. and Wells, C. E. (1995). The Discrete Time-Cost Trade-Off Problem Revisited. European Journal of Operational Research, 64, 225\u2013238.","journal-title":"European Journal of Operational Research"},{"key":"BF02936394_CR5","doi-asserted-by":"crossref","first-page":"50","DOI":"10.1016\/0377-2217(94)00181-2","volume":"88","author":"E. Demeulemeester","year":"1996","unstructured":"Demeulemeester, E., L., Herroelen, W. S. and Elmaghraby, S. E. (1996). Optimal Procedures for the Discrete Time\/Cost Trade-off Problem in Projects Networks. European Journal of Operational Research, 88, 50\u201368.","journal-title":"European Journal of Operational Research"},{"key":"BF02936394_CR6","first-page":"1","volume":"64","author":"S. E. Elmaghraby","year":"1992","unstructured":"Elmaghraby, S. E. (1992). Resource Allocation via Dynamic Programming in Activity Networks. European Journal of Operational Research, 64, 1\u201317.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"BF02936394_CR7","doi-asserted-by":"crossref","first-page":"184","DOI":"10.1061\/(ASCE)0887-3801(1997)11:3(184)","volume":"11","author":"C.-W. Feng","year":"1997","unstructured":"Feng, C.-W., Liu, L. and Burns, S. A. (1997). Using Genetic Algorithms to Solve Construction Time-Cost Trade-off Problems. Journal of Computing in Civil Engineering, 11(3), 184\u2013189.","journal-title":"Journal of Computing in Civil Engineering"},{"issue":"3","key":"BF02936394_CR8","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1287\/mnsc.7.2.167","volume":"7","author":"D. R. Fulkerson","year":"1961","unstructured":"Fulkerson, D. R. (1961). A Network Flow Computation for Project Cost Curve. Management Science, 7(3), 167\u2013178.","journal-title":"Management Science"},{"issue":"3","key":"BF02936394_CR9","first-page":"167","volume":"9","author":"J. E. Kelly","year":"1961","unstructured":"Kelly, J. E. (1961). Critical Path Planning and Scheduling: Mathematical Basis. Operations Research, 9(3), 167\u2013179.","journal-title":"Operations Research"},{"key":"BF02936394_CR10","volume-title":"Project Management: A Systems Approach to Planning Scheduling and Controlling","author":"H. Kerzner","year":"1995","unstructured":"Kerzner, H. (1995). Project Management: A Systems Approach to Planning Scheduling and Controlling. 5th Edition. Van Nostrand Reinhold, New York.","edition":"5th Edition"},{"key":"BF02936394_CR11","volume-title":"Working Paper","author":"R. Kolisch","year":"1997","unstructured":"Kolisch, R. and Padman R. (1997). An Integrated Survey of Project Scheduling. Working Paper. Christian-Albrechts-Universit\u00e4t, Kiel, Germany."},{"key":"BF02936394_CR12","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1016\/S0263-7863(99)00035-6","volume":"19","author":"S.-S. Leu","year":"2001","unstructured":"Leu, S.-S., Chen, A.-T. and Yang, C.-H. (2001). A GA-based Fuzzy Optimal Model for Construction Time-Cost Trade-off. International Journal of Project Management. 19, 47\u201358.","journal-title":"International Journal of Project Management"},{"issue":"3","key":"BF02936394_CR13","first-page":"234","volume":"123","author":"H. Li","year":"1997","unstructured":"Li, H. and Love, P. (1997). Using Improved Genetic Algorithms to Facilitate Time- Cost Optimization. Journal of Construction Engineering and Management. 123(3), 234\u2013237.","journal-title":"Journal of Construction Engineering and Management"},{"key":"BF02936394_CR14","doi-asserted-by":"crossref","unstructured":"Liu, L., Burns, S. A. and Feng, C.-W. (1995). Construction Time-Cost Trade-off Analysis using LP\/IP Hubrid Method. Journal of Construction Engineering and Management, December, 446-454.","DOI":"10.1061\/(ASCE)0733-9364(1995)121:4(446)"},{"key":"BF02936394_CR15","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1061\/JCCEAZ.0000137","volume":"91","author":"W. L. Meyer","year":"1965","unstructured":"Meyer, W. L. and Shaffer, L. R. (1965). Extending CPM for Multiform Project Time- Cost Curves. Journal of the Construction Division, Proceedings of the ASCE, 91, 45\u201365.","journal-title":"Journal of the Construction Division, Proceedings of the ASCE"},{"key":"BF02936394_CR16","volume-title":"PERT and Precedence Diagramming","author":"J. J. Moder","year":"1983","unstructured":"Moder, J. J., Philips, C. R. and Davis, E. W. (1983). Project Management with CPM, PERT and Precedence Diagramming, 3rd ed. Van Nostrand Reinhold, New York.","edition":"3rd ed."},{"key":"BF02936394_CR17","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1139\/l93-007","volume":"20","author":"O. Moselhi","year":"1993","unstructured":"Moselhi, O. (1993). Schedule Compression using the Direct Stiffness Method. Can. J. Civ. Engrg. 20, 65\u201372.","journal-title":"Can. J. Civ. Engrg."},{"key":"BF02936394_CR18","volume-title":"Project Management: Engineering, Technology and Implementation","author":"N. Shrub","year":"1994","unstructured":"Shrub, N., Bard, J. F. and Globerson, S. (1994). Project Management: Engineering, Technology and Implementation. Prentice Hall Inc., International Editions, London."},{"issue":"6","key":"BF02936394_CR19","doi-asserted-by":"crossref","first-page":"354","DOI":"10.1287\/mnsc.17.6.B354","volume":"17","author":"N. Siemens","year":"1971","unstructured":"Siemens, N. (1971). A Simple CPM Time-Cost Tradeoff Algorithm. Mgmt. Sci., 17(6), 354\u2013363.","journal-title":"Mgmt. Sci."}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02936394.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF02936394\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02936394","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,9,15]],"date-time":"2021-09-15T11:37:38Z","timestamp":1631705858000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF02936394"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2002,9]]},"references-count":19,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2002,9]]}},"alternative-id":["BF02936394"],"URL":"https:\/\/doi.org\/10.1007\/bf02936394","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2002,9]]}}}