{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,9,13]],"date-time":"2023-09-13T19:20:30Z","timestamp":1694632830961},"reference-count":33,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2006,9,1]],"date-time":"2006-09-01T00:00:00Z","timestamp":1157068800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2006,9]]},"DOI":"10.1007\/bf02941255","type":"journal-article","created":{"date-parts":[[2008,8,30]],"date-time":"2008-08-30T06:08:36Z","timestamp":1220076516000},"page":"255-269","source":"Crossref","is-referenced-by-count":9,"title":["Multiobjective optimization in Linear Repetitive Project scheduling"],"prefix":"10.1007","volume":"6","author":[{"given":"Pandelis G.","family":"Ipsilandis","sequence":"first","affiliation":[]}],"member":"297","reference":[{"key":"BF02941255_CR1","unstructured":"A Guide to the Project Management Body of Knowledge, 3rd Edition, (2004). PMI Standard Committee, PMI Institute."},{"issue":"CO2","key":"BF02941255_CR2","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1061\/JCCEAZ.0000876","volume":"106","author":"D. B. Ashley","year":"1980","unstructured":"Ashley, D. B. (1980), \u201cSimulation of repetitive-unit construction\u201d Journal of Construction Division, Vol. 106, No. CO2, pp. 185\u2013194.","journal-title":"Journal of Construction Division"},{"issue":"CO3","key":"BF02941255_CR3","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1061\/JCCEAZ.0000905","volume":"106","author":"G. S. Birrell","year":"1980","unstructured":"Birrell, G. S. (1980), \u201cConstruction planning-beyond the critical path\u201d Journal of Construction Division, Vol. 106, No. CO3, pp. 389\u2013407.","journal-title":"Journal of Construction Division"},{"issue":"CO3","key":"BF02941255_CR4","doi-asserted-by":"crossref","first-page":"403","DOI":"10.1061\/JCCEAZ.0000444","volume":"100","author":"R.I. Carr","year":"1974","unstructured":"Carr, R.I. and Meyer, W.L. (1974), \u201cPlanning construction of repetitive building units\u201d Journal of Construction Division, Vol. 100, No. CO3, pp. 403\u2013412.","journal-title":"Journal of Construction Division"},{"key":"BF02941255_CR5","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1080\/014461998372574","volume":"16","author":"N. Dawood","year":"1998","unstructured":"Dawood, N. (1998), \u201cEstimating project and activity duration: a risk management approach using network analysis\u201d Construction Management and Economics, 16, pp. 41\u201348.","journal-title":"Construction Management and Economics"},{"issue":"CO4","key":"BF02941255_CR6","doi-asserted-by":"crossref","first-page":"571","DOI":"10.1061\/JCCEAZ.0000460","volume":"100","author":"J. Dressler","year":"1974","unstructured":"Dressler, J. (1974), \u201cConstruction scheduling of linear construction sites\u201d Journal of Construction Division, Vol. 100, No. CO4, pp. 571\u2013587.","journal-title":"Journal of Construction Division"},{"issue":"4","key":"BF02941255_CR7","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1061\/(ASCE)0733-9364(1998)124:4(263)","volume":"124","author":"D.J. Harmelink","year":"1998","unstructured":"Harmelink, D.J. and Rowings, J.E. (1998), \u201cLinear Scheduling Model: development of controlling activity path\u201d Journal of Construction Engineering and Management, Vol. 124, No. 4, pp. 263\u2013268.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"4","key":"BF02941255_CR8","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1061\/(ASCE)0733-9364(2001)127:4(255)","volume":"127","author":"D.J. Harmelink","year":"2001","unstructured":"Harmelink, D.J. (2001), \u201cLinear Scheduling Model: float characteristics\u201d Journal of Construction Engineering and Management, Vol. 127, No. 4, pp. 255\u2013260.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"4","key":"BF02941255_CR9","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1061\/(ASCE)0733-9364(1998)124:4(269)","volume":"124","author":"R.B. Harris","year":"1998","unstructured":"Harris, R.B. and Ioannou, P.G. (1998), \u201cScheduling project with repeating activities\u201d Journal of Construction Engineering and Management, Vol. 124, No. 4, pp. 269\u2013278.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"1","key":"BF02941255_CR10","doi-asserted-by":"crossref","first-page":"68","DOI":"10.1061\/(ASCE)0887-3801(2003)17:1(68)","volume":"17","author":"P.G. Ioannou","year":"2003","unstructured":"Ioannou, P.G. and Harris, R.B. (2003), \u201cDiscussion of algorithm for determining controlling path considering resource continuity\u201d Journal of Computing in Civil Engineering, Vol. 17, No. 1, pp. 68\u201370.","journal-title":"Journal of Computing in Civil Engineering"},{"issue":"1","key":"BF02941255_CR11","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1061\/(ASCE)0887-3801(2003)17:1(70)","volume":"17","author":"P.G. Ioannou","year":"2003","unstructured":"Ioannou, P.G. and Yang, I.T. (2003), \u201cDiscussion of algorithm for determining controlling path considering resource continuity\u201d Journal of Computing in Civil Engineering, Vol. 17, No. 1, pp. 70\u201372.","journal-title":"Journal of Computing in Civil Engineering"},{"issue":"3","key":"BF02941255_CR12","doi-asserted-by":"crossref","first-page":"461","DOI":"10.1061\/(ASCE)0733-9364(2004)130:3(461)","volume":"130","author":"P.G. Ioannou","year":"2004","unstructured":"Ioannou, P.G. and Yang, I.T. (2004), \u201cDiscussion of comparison of Linear Scheduling Model and Repetitive Scheduling Method\u201d Journal of Construction Engineering and Management, Vol. 130, No. 3, pp. 461\u2013463.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"CO2","key":"BF02941255_CR13","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1061\/JCCEAZ.0000960","volume":"107","author":"D.W. Johnston","year":"1981","unstructured":"Johnston, D.W. (1981), \u201cLinear Scheduling Method for highway construction\u201d Journal of Construction Division, Vol. 107, No. CO2, pp. 247\u2013261.","journal-title":"Journal of Construction Division"},{"key":"BF02941255_CR14","unstructured":"Kallantzis, A. and Lambropoulos, S. (2003), \u201cCorrespondence of activity relationships and critical path between time-location diagrams and Critical Path Method\u201d Proceedings of the 16th National Conference of E.E.E.E., Larissa, pp. 67\u201376."},{"issue":"3","key":"BF02941255_CR15","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1108\/09699980410535813","volume":"11","author":"A. Kallantzis","year":"2004","unstructured":"Kallantzis, A. and Lambropoulos, S. (2004), \u201cCritical path determination by incorporation minimum and maximum time and distance constraints into linear scheduling\u201d Engineering, Construction and Architectural Management, Vol. 11, No. 3, pp. 211\u2013222.","journal-title":"Engineering, Construction and Architectural Management"},{"issue":"3","key":"BF02941255_CR16","doi-asserted-by":"crossref","first-page":"294","DOI":"10.1108\/eb021083","volume":"5","author":"K.G. Mattila","year":"1998","unstructured":"Mattila, K.G. and Abraham, D.M. (1998), \u201cLinear scheduling: past efforts and future directions\u201d, Engineering, Construction and Architectural Management, Vol. 5, No. 3, pp. 294\u2013303.","journal-title":"Engineering, Construction and Architectural Management"},{"issue":"1","key":"BF02941255_CR17","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1061\/(ASCE)0733-9364(2003)129:1(56)","volume":"129","author":"K.G. Mattila","year":"2003","unstructured":"Mattila, K.G. and Park, A. (2003), \u201cComparison of Linear Scheduling Method and Repetitive Scheduling Method\u201d, Journal of Construction Engineering and Management, Vol. 129, No. 1, pp. 56\u201364.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"1","key":"BF02941255_CR18","doi-asserted-by":"crossref","first-page":"8","DOI":"10.1061\/(ASCE)0733-9364(1999)125:1(8)","volume":"125","author":"B. Mulholland","year":"1999","unstructured":"Mulholland, B. and Christian, J. (1999), \u201cRisk assessment in construction schedules\u201d Journal of Construction Engineering and Management, Vol. 125, No. 1, pp. 8\u201315.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"5","key":"BF02941255_CR19","doi-asserted-by":"crossref","first-page":"518","DOI":"10.1061\/(ASCE)0733-9364(2003)129:5(518)","volume":"129","author":"D. Nasir","year":"2003","unstructured":"Nasir, D., McCabe, B., Hartono, L. (2003), \u201cEvaluating risk in construction \u2014schedule model (ERIC-S-): Construction schedule risk model\u201d Journal of Construction Engineering and Management, Vol. 129, No. 5, pp. 518\u2013527.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"CO4","key":"BF02941255_CR20","doi-asserted-by":"crossref","first-page":"895","DOI":"10.1061\/JCCEAZ.0000569","volume":"101","author":"J.J. O\u2019Brien","year":"1975","unstructured":"O\u2019Brien, J.J. (1975), \u201cVPM scheduling for high-rise buildings\u201d Journal of Construction Division, Vol. 101, No. CO4, pp. 895\u2013905.","journal-title":"Journal of Construction Division"},{"key":"BF02941255_CR21","unstructured":"Palisade Corporation (2004), \u201cUser Guide for @RISK for Project Risk analysis and simulation add-in for Microsoft Project\u201d Version 4.1"},{"issue":"CO3","key":"BF02941255_CR22","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1061\/JCCEAZ.0000427","volume":"100","author":"S. Peer","year":"1974","unstructured":"Peer, S. (1974), \u201cNetwork analysis and construction planning\u201d, Journal of Construction Division, Vol. 100, No. CO3, pp. 203\u2013210.","journal-title":"Journal of Construction Division"},{"issue":"2","key":"BF02941255_CR23","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1061\/(ASCE)0733-9364(1990)116:2(316)","volume":"116","author":"R.B. Reda","year":"1990","unstructured":"Reda, R.B. (1990), \u201cRPM: Repetitive Project Modeling\u201d Journal of Construction Engineering and Management, Vol. 116, No. 2, pp. 316\u2013330.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"4","key":"BF02941255_CR24","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1061\/(ASCE)0733-9364(1988)114:1(36)","volume":"114","author":"A.D. Russell","year":"1988","unstructured":"Russell, A.D. and Ceselton,W.F. (1988), \u201cExtensions to linear schedule optimization\u201d Journal of Construction Engineering and Management, Vol. 114, No. 4, pp. 36\u201352.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"2","key":"BF02941255_CR25","doi-asserted-by":"crossref","first-page":"196","DOI":"10.1061\/(ASCE)0733-9364(1993)119:2(196)","volume":"119","author":"A.D. Russell","year":"1993","unstructured":"Russell, A.D. and Wong, W.C.M. (1993), \u201cNew generation of planning structures\u201d Journal of Construction Engineering and Management, Vol. 119, No. 2, pp. 196\u2013214.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"CO2","key":"BF02941255_CR26","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1061\/JCCEAZ.0000877","volume":"106","author":"S. Selinger","year":"1980","unstructured":"Selinger, S. (1980), \u201cConstruction planning for linear projects\u201d Journal of Construction Division, Vol. 106, No. CO2, pp. 195\u2013205.","journal-title":"Journal of Construction Division"},{"issue":"CO3","key":"BF02941255_CR27","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1061\/JCCEAZ.0001056","volume":"108","author":"O. Stradal","year":"1982","unstructured":"Stradal, O. and Cacha, J. (1982), \u201cTime space scheduling method\u201d Journal of Construction Division, Vol. 108, No. CO3, pp. 445\u2013457.","journal-title":"Journal of Construction Division"},{"key":"BF02941255_CR28","first-page":"32","volume":"1351","author":"M.C. Vorster","year":"1992","unstructured":"Vorster, M.C., Beliveau, Y.J. and Bafna, T. (1992), \u201cLinear scheduling and visualization\u201d Transportation Research Record, 1351, 32\u201339.","journal-title":"Transportation Research Record"},{"issue":"5","key":"BF02941255_CR29","doi-asserted-by":"crossref","first-page":"374","DOI":"10.1061\/(ASCE)0733-9364(2001)127:5(374)","volume":"127","author":"R.A. Yamin","year":"2001","unstructured":"Yamin, R.A. and Harmelink, D.J. (2001), \u201cComparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)\u201d Journal of Construction Engineering and Management, Vol. 127, No. 5, pp. 374\u2013381.","journal-title":"Journal of Construction Engineering and Management"},{"key":"BF02941255_CR30","unstructured":"Yang, I.T. and Ioannou, P.G. (2001), \u201cResource-driven scheduling for repetitive projects: a pull-system approach\u201d, Proceedings of the 9th International Group for Lean Construction Conference, Singapore, 6\u20138August, pp. 365\u2013377."},{"key":"BF02941255_CR31","doi-asserted-by":"crossref","first-page":"619","DOI":"10.1080\/01446190310001649065","volume":"22","author":"I.T. Yang","year":"2004","unstructured":"Yang, I.T. and Ioannou, P.G. (2004), \u201cScheduling with focus on practical concerns in repetitive projects\u201d Construction Management and Economics, Vol. 22, pp. 619\u2013630.","journal-title":"Construction Management and Economics"},{"key":"BF02941255_CR32","volume-title":"PhD. Dissertation","author":"I.T. Yang","year":"2002","unstructured":"Yang, I.T. (2002a), \u201cRepetitive Project Planner: resource-driven scheduling for repetitive construction projects\u201d PhD. Dissertation, University of Michigan, Ann Arbor, MI, USA."},{"key":"BF02941255_CR33","unstructured":"Yang, I.T. (2002b) \u201cStochastic analysis on project duration under the requirement of continuous resource utilization\u201d, Proceedings of the 10th International Group for Lean Construction Conference, Gramado, Brazil, August, pp. 527\u2013540."}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02941255.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF02941255\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02941255","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,9,15]],"date-time":"2021-09-15T20:06:16Z","timestamp":1631736376000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF02941255"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,9]]},"references-count":33,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2006,9]]}},"alternative-id":["BF02941255"],"URL":"https:\/\/doi.org\/10.1007\/bf02941255","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,9]]}}}