{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,9]],"date-time":"2025-10-09T06:29:16Z","timestamp":1759991356674},"reference-count":21,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2006,9,1]],"date-time":"2006-09-01T00:00:00Z","timestamp":1157068800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2006,9]]},"DOI":"10.1007\/bf02941260","type":"journal-article","created":{"date-parts":[[2008,8,30]],"date-time":"2008-08-30T06:08:36Z","timestamp":1220076516000},"page":"323-332","source":"Crossref","is-referenced-by-count":6,"title":["A prototype system for the prediction of final cost in construction projects"],"prefix":"10.1007","volume":"6","author":[{"given":"Georgios N.","family":"Aretoulis","sequence":"first","affiliation":[]},{"given":"Demos C.","family":"Angelides","sequence":"additional","affiliation":[]},{"given":"Glykeria P.","family":"Kalfakakou","sequence":"additional","affiliation":[]},{"given":"Georgios S.","family":"Fotiadis","sequence":"additional","affiliation":[]},{"given":"Konstantinos I.","family":"Anastasiadis","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"3","key":"BF02941260_CR1","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1061\/(ASCE)0742-597X(1999)15:3(78)","volume":"15","author":"D.C. Angelides","year":"1999","unstructured":"Angelides, D.C. (1999). \u201cProject Management and Good Technical and Business Practices\u201d. Journal of Management in Engineering, ASCE, Vol. 15, No. 3, pp 78\u201388.","journal-title":"Journal of Management in Engineering, ASCE"},{"key":"BF02941260_CR2","volume-title":"ISO 9000 in Technical Companies","author":"D.C. Angelides","year":"2001","unstructured":"Angelides, D.C. and Kirkinezou, M.K. (2001). ISO 9000 in Technical Companies, 1st edition, University Studio Press, Thessaloniki (in Greek).","edition":"1st edition"},{"key":"BF02941260_CR3","unstructured":"Aouad, G., Cooper, R., Kagioglou, M., and Sexton, M. (1999). \u201cThe development of a process map for the construction sector\u201d, Proceedings of Working Groups W65\/W55, South Africa."},{"key":"BF02941260_CR4","unstructured":"Aris Toolset, http:\/\/www.ids-scheer.com\/english. (2004)"},{"key":"BF02941260_CR5","unstructured":"Brahalis, J. (2003). \u201cUnderestimation in Public Projects, Truth or Lie\u201d, Greek Technical Chamber Journal, Volume 2259, http.\/\/www.tee.gr\/online\/epikaira \/2003\/2259\/pg027.shtml, 2003 (in Greek)."},{"key":"BF02941260_CR6","volume-title":"Proceedings of the European Conference on Product Data Technology Days","author":"R. Cooper","year":"1998","unstructured":"Cooper, R., Kagioglou, M., Aouad, G., Hinks, J., Sexton, M. and Sheath, D.(1998). \u201cThe development of a generic design and construction process protocol\u201d, Proceedings of the European Conference on Product Data Technology Days, BRE, UK."},{"key":"BF02941260_CR7","doi-asserted-by":"crossref","unstructured":"Cooper, R., Aouad, G., Lee, A., Wu, S., Fleming, A., Kagioglou, M. (2005). \u201cProcess management in design and construction\u201d, Blackwell Publishing Ltd.","DOI":"10.1002\/9780470690758"},{"key":"BF02941260_CR8","unstructured":"Edward M. J. (1996). \u201cThe impact of activity-based costing on project bidding\u201d, PhD thesis, West Virginia University."},{"key":"BF02941260_CR9","volume-title":"M.S. thesis","author":"K. Eyers","year":"2001","unstructured":"Eyers K. (2001). \u201cBelief Network Analysis of Direct Cost Risk in Building Construction\u201d, M.S. thesis, Department of Civil Engineering, University of Toronto, Canada."},{"key":"BF02941260_CR10","volume-title":"Ph.D. thesis","author":"B. A. Ghulman","year":"2000","unstructured":"Ghulman, B. A. (2000). \u201cPredicting construction cost growth in ODOT\u2019s paving projects using information available at the bidding time\u201d, Ph.D. thesis, Oklahoma State University, USA."},{"key":"BF02941260_CR11","volume-title":"Ph.D. thesis","author":"T. M. Hegazy","year":"1993","unstructured":"Hegazy, T. M. (1993). \u201cIntegrated bid preparation with emphases on risk assessment using neural Networks\u201d, Ph.D. thesis, Concordia University, Canada."},{"key":"BF02941260_CR12","unstructured":"Hegazy, T. M. (2002). \u201cComputer \u2014Based Construction Project Management\u201d, Pearson Education, Inc., Upper Saddle River, New Jersey 07458, Prentice Hall."},{"key":"BF02941260_CR13","volume-title":"Proceedings of the 2nd International Conference on Construction Process Re-Engineering,CPR99","author":"M. Kagioglou","year":"1999","unstructured":"Kagioglou, M., Cooper, R., and Aouad, G. (1999). \u201cRe-engineering the UK Construction Industry: The Process Protocol\u201d. Proceedings of the 2nd International Conference on Construction Process Re-Engineering,CPR99, New South Wales University, Australia."},{"key":"BF02941260_CR14","volume-title":"Proceedings of the 9th annual conference of the International Group for Lean Construction","author":"Y. W. Kim","year":"2001","unstructured":"Kim Y. W., and Ballard, G. (2001). \u201cActivity \u2014Based Costing and its application to Lean Construction\u201d, Proceedings of the 9th annual conference of the International Group for Lean Construction, National University of Singapore, Singapore."},{"key":"BF02941260_CR15","doi-asserted-by":"crossref","first-page":"1235","DOI":"10.1016\/j.buildenv.2004.02.013","volume":"39","author":"G.H. Kim","year":"2004","unstructured":"Kim, G.H., An, S.H., and Kang, K.I. (2004). \u201cComparison of construction cost estimating Models based on regression analysis, neural networks, and case-based reasoning\u201d. Journal of Building and Environment, Vol. 39, pp. 1235\u20131242.","journal-title":"Journal of Building and Environment"},{"key":"BF02941260_CR16","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/S0967-070X(03)00017-9","volume":"11","author":"J. Odeck","year":"2004","unstructured":"Odeck, J.(2004). \u201cCost overruns in road construction \u2014what are their sizes and determinants\u201d, Journal of Transport Policy, Vol 11, pp. 43\u201353.","journal-title":"Journal of Transport Policy"},{"key":"BF02941260_CR17","unstructured":"Ruozi, D., Rizzi, K., Ramelli, A., (2001). \u201cRe-engineering of Product Development Process using ARIS\u201d, Proceedings of the XII ADM International Conference-Grand Hotel-Rimini-Italy."},{"issue":"8","key":"BF02941260_CR18","doi-asserted-by":"crossref","first-page":"1075","DOI":"10.1016\/S0360-1323(03)00067-2","volume":"38","author":"R. M. Skitmore","year":"2003","unstructured":"Skitmore, R. M. and Ng, T.S.T. (2003). \u201cForecast models for actual construction time and cost\u201d. Journal of Building and Environment, Vol. 38, N. 8, pp. 1075\u20131083.","journal-title":"Journal of Building and Environment"},{"key":"BF02941260_CR19","doi-asserted-by":"crossref","DOI":"10.1201\/9780203910016","volume-title":"The Engineer\u2019s Cost Handbook. Tools for managing Project Costs","author":"R., E. Westney","year":"1997","unstructured":"Westney, R., E. (1997). The Engineer\u2019s Cost Handbook. Tools for managing Project Costs, 2nd edition, Marcel Decker, INC, 270 Madison Avenue, New York, New York 10016.","edition":"2nd edition"},{"key":"BF02941260_CR20","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1016\/S0263-7863(03)00004-8","volume":"21","author":"P. T. Williams","year":"2003","unstructured":"Williams, P. T. (2003). \u201cPredicting final cost for competitively bid construction projects using regression models\u201d. International Journal of Project Management, Vol. 21, pp. 593\u2013599.","journal-title":"International Journal of Project Management"},{"key":"BF02941260_CR21","unstructured":"Yu, K., Froese, T., Grobler, F., (1999). \u201cA development framework for data models for computer \u2014integrated facilities management\u201d. Journal of Automation in construction, special issue on facilities management."}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02941260.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF02941260\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02941260","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,21]],"date-time":"2019-05-21T20:00:59Z","timestamp":1558468859000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF02941260"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,9]]},"references-count":21,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2006,9]]}},"alternative-id":["BF02941260"],"URL":"https:\/\/doi.org\/10.1007\/bf02941260","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,9]]}}}