{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,7,15]],"date-time":"2022-07-15T21:28:09Z","timestamp":1657920489245},"reference-count":12,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2003,3,1]],"date-time":"2003-03-01T00:00:00Z","timestamp":1046476800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J. Comput. Sci. &amp; Technol."],"published-print":{"date-parts":[[2003,3]]},"DOI":"10.1007\/bf02948893","type":"journal-article","created":{"date-parts":[[2008,9,13]],"date-time":"2008-09-13T00:31:25Z","timestamp":1221265885000},"page":"252-257","source":"Crossref","is-referenced-by-count":3,"title":["A constraint satisfaction neural network and heuristic combined approach for concurrent activities scheduling"],"prefix":"10.1007","volume":"18","author":[{"given":"JiHong","family":"Yan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Cheng","family":"Wu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"1","key":"BF02948893_CR1","doi-asserted-by":"crossref","first-page":"72","DOI":"10.1109\/17.740039","volume":"46","author":"M Hatch","year":"1999","unstructured":"Hatch M, Badienelli R D. A concurrent optimization methodology for concurrent engineering.IEEE Trans. Eng. Manage., 1999, 46(1): 72\u201386.","journal-title":"IEEE Trans. Eng. Manage."},{"key":"BF02948893_CR2","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1177\/1063293X9700500305","volume":"5","author":"V R Tappeta","year":"1997","unstructured":"Tappeta V R, Renau E J. A comparison of equality constraints formulation for concurrent design optimization.Concurrent Eng. Res. Appl., 1997, 5: 253\u2013261.","journal-title":"Concurrent Eng. Res. Appl."},{"key":"BF02948893_CR3","doi-asserted-by":"crossref","unstructured":"Badiru A B. Scheduling of concurrent manufacturing projects.Concurrent Engineering: Contemporary Issues and Modern Design Tools, Cambridge University Press, 1993, pp.93\u2013109.","DOI":"10.1007\/978-1-4615-3062-6_6"},{"issue":"3","key":"BF02948893_CR4","first-page":"361","volume":"31","author":"J H Yan","year":"2001","unstructured":"Yan J H, Wu C. A scheduling approach for design activities in concurrent engineering.IEEE Trans. SMC, part C, 2001, 31(3): 361\u2013365.","journal-title":"IEEE Trans. SMC, part C"},{"key":"BF02948893_CR5","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1016\/0952-1976(94)90059-0","volume":"7","author":"S Y Foo","year":"1994","unstructured":"Foo S Y, Takefuji Y, Szu H. Job-shop scheduling based on modified Tank-Hopfield linear programming networks.Eng. Appl. Artificial Intelligent, 1994, 7: 321\u2013327.","journal-title":"Eng. Appl. Artificial Intelligent"},{"key":"BF02948893_CR6","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1007\/BF00124064","volume":"6","author":"T M Willems","year":"1995","unstructured":"Willems T M, Brandts L E M W. Implementing heuristics as an optimization criterion in neural networks for job-shop scheduling.J. Intell. Manufacturing, 1995, 6: 377\u2013387.","journal-title":"J. Intell. Manufacturing"},{"key":"BF02948893_CR7","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1016\/0967-0661(94)90571-1","volume":"2","author":"T M Willems","year":"1994","unstructured":"Willems T M. Neural networks for job-shop scheduling.Contr. Eng. Practice, 1994, 2: 31\u201339.","journal-title":"Contr. Eng. Practice"},{"key":"BF02948893_CR8","unstructured":"Yu H B. Research of intelligent production scheduling methods and their applications [Dissertation]. Northeastern University of China, 1997."},{"key":"BF02948893_CR9","first-page":"449","volume":"25","author":"H B Yu","year":"1999","unstructured":"Yu H B, Xue J Set al. A production scheduling approach based on neural network.ACTA AUTOMATICA SINGA, 1999, 25: 449\u2013456.","journal-title":"ACTA AUTOMATICA SINGA"},{"key":"BF02948893_CR10","doi-asserted-by":"crossref","first-page":"474","DOI":"10.1109\/72.839016","volume":"11","author":"S X Yang","year":"2000","unstructured":"Yang S X, Wang D W. Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling.IEEE Trans. Neural Networks, 2000, 11: 474\u2013486.","journal-title":"IEEE Trans. Neural Networks"},{"key":"BF02948893_CR11","first-page":"3","volume":"3","author":"G L Xiong","year":"1996","unstructured":"Xiong G L, Zhang Y Y, Li B H. The research on collective techniques and executive methods for concurrent engineering.Computer Integrated Manufacturing Systems, 1996, 3: 3\u20138.","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"BF02948893_CR12","unstructured":"Yan J H. Research on optimal scheduling for concurrent activities. Postdoctoral Research Report, Tsinghua University, August, 2001."}],"container-title":["Journal of Computer Science and Technology"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02948893.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/BF02948893\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/BF02948893","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,22]],"date-time":"2019-05-22T23:03:10Z","timestamp":1558566190000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/BF02948893"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003,3]]},"references-count":12,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2003,3]]}},"alternative-id":["BF02948893"],"URL":"https:\/\/doi.org\/10.1007\/bf02948893","relation":{},"ISSN":["1000-9000","1860-4749"],"issn-type":[{"value":"1000-9000","type":"print"},{"value":"1860-4749","type":"electronic"}],"subject":[],"published":{"date-parts":[[2003,3]]}}}