{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T03:24:07Z","timestamp":1740108247596,"version":"3.37.3"},"reference-count":20,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2017,11,7]],"date-time":"2017-11-07T00:00:00Z","timestamp":1510012800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/501100004359","name":"Vetenskapsr\u00e5det","doi-asserted-by":"publisher","award":["NT-14, 2014-03774"],"award-info":[{"award-number":["NT-14, 2014-03774"]}],"id":[{"id":"10.13039\/501100004359","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Math Meth Oper Res"],"published-print":{"date-parts":[[2018,6]]},"DOI":"10.1007\/s00186-017-0620-2","type":"journal-article","created":{"date-parts":[[2017,11,6]],"date-time":"2017-11-06T20:20:15Z","timestamp":1509999615000},"page":"347-382","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["A limited-feedback approximation scheme for optimal switching problems with execution delays"],"prefix":"10.1007","volume":"87","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-3111-4820","authenticated-orcid":false,"given":"Magnus","family":"Perninge","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,11,7]]},"reference":[{"issue":"1","key":"620_CR1","doi-asserted-by":"publisher","first-page":"191","DOI":"10.1137\/120897298","volume":"5","author":"R A\u00efd","year":"2014","unstructured":"A\u00efd R, Campi L, Langren\u00e9 N, Pham H (2014) A probabilistic numerical method for optimal multiple switching problems in high dimension. SIAM J Financ Math 5(1):191\u2013231. \n                        https:\/\/doi.org\/10.1137\/120897298","journal-title":"SIAM J Financ Math"},{"key":"620_CR2","doi-asserted-by":"crossref","first-page":"240","DOI":"10.1016\/j.jedc.2014.10.010","volume":"51","author":"R A\u00efd","year":"2015","unstructured":"A\u00efd R, Federico S, Pham H, Villeneuve B (2015) Explicit investment rules with time-to-build and uncertainty. J Econ Dyn Control 51:240\u2013256","journal-title":"J Econ Dyn Control"},{"issue":"3","key":"620_CR3","doi-asserted-by":"crossref","first-page":"709","DOI":"10.1287\/moor.20.3.709","volume":"20","author":"A Bar-Ilan","year":"1995","unstructured":"Bar-Ilan A, Sulem A (1995) Explicit solution of inventory problems with delivery lags. Math Oper Res 20(3):709\u2013720","journal-title":"Math Oper Res"},{"issue":"1","key":"620_CR4","doi-asserted-by":"publisher","first-page":"69","DOI":"10.1016\/S0165-1889(00)00018-X","volume":"26","author":"A Bar-Ilan","year":"2002","unstructured":"Bar-Ilan A, Sulem A, Zanello A (2002) Time-to-build and capacity choice. J Econ Dyn Control 26(1):69\u201398. \n                        https:\/\/doi.org\/10.1016\/S0165-1889(00)00018-X","journal-title":"J Econ Dyn Control"},{"key":"620_CR5","volume-title":"Dynamic programming and optimal control","author":"DP Bertsekas","year":"2005","unstructured":"Bertsekas DP (2005) Dynamic programming and optimal control, vol 1, 3rd edn. Athena Scientific, Belmont","edition":"3"},{"key":"620_CR6","doi-asserted-by":"crossref","first-page":"1436","DOI":"10.1016\/j.spa.2008.07.007","volume":"119","author":"B Bruder","year":"2009","unstructured":"Bruder B, Pham H (2009) Impulse control problem on finite horizon with execution delay. Stoch Process Appl 119:1436\u20131469","journal-title":"Stoch Process Appl"},{"key":"620_CR7","doi-asserted-by":"crossref","first-page":"405","DOI":"10.1080\/13504860802170507","volume":"15","author":"R Carmona","year":"2008","unstructured":"Carmona R, Ludkovski M (2008) Pricing asset scheduling flexibility using optimal switching. Appl Math Financ 15:405\u2013447","journal-title":"Appl Math Financ"},{"key":"620_CR8","unstructured":"Deng J, Xia Z (2005) Pricing and hedging electric supply contracts: a case with tolling agreements. Preprint, Georgia Institute of Technology, Atlanta"},{"issue":"4","key":"620_CR9","doi-asserted-by":"crossref","first-page":"2751","DOI":"10.1137\/070697641","volume":"47","author":"B Djehiche","year":"2009","unstructured":"Djehiche B, Hamad\u00e9ne S, Popier A (2009) A finite horizon optimal multiple switching problem. SIAM J Control Optim 47(4):2751\u20132770","journal-title":"SIAM J Control Optim"},{"key":"620_CR10","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1007\/s00245-009-9071-3","volume":"60","author":"B Asri El","year":"2009","unstructured":"El Asri B, Hamad\u00e9ne S (2009) The finite horizon optimal multi-modes switching problem: the viscosity solution approach. Appl Math Optim 60:213\u2013235","journal-title":"Appl Math Optim"},{"issue":"2","key":"620_CR11","doi-asserted-by":"crossref","first-page":"702","DOI":"10.1214\/aop\/1024404416","volume":"25","author":"N El-Karoui","year":"1997","unstructured":"El-Karoui N, Kapoudjian C, Pardoux E, Peng S, Quenez MC (1997) Reflected solutions of backward SDEs and related obstacle problems for PDEs. Ann Probab 25(2):702\u2013737","journal-title":"Ann Probab"},{"key":"620_CR12","volume-title":"Probability: a graduate course","author":"A Gut","year":"2005","unstructured":"Gut A (2005) Probability: a graduate course. Springer, New York"},{"key":"620_CR13","volume-title":"Brownian motion and stochastic calculus","author":"I Karatzas","year":"1991","unstructured":"Karatzas I, Shreve SE (1991) Brownian motion and stochastic calculus. Springer, New York"},{"key":"620_CR14","volume-title":"Methods of mathematical finance","author":"I Karatzas","year":"1998","unstructured":"Karatzas I, Shreve SE (1998) Methods of mathematical finance. Springer, New York"},{"key":"620_CR15","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4613-0007-6","volume-title":"Numerical methods for stochastic control problems in continuous time","author":"HJ Kushner","year":"2001","unstructured":"Kushner HJ, Dupuis P (2001) Numerical methods for stochastic control problems in continuous time, 2nd edn. Springer, New York","edition":"2"},{"key":"620_CR16","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1093\/rfs\/14.1.113","volume":"14","author":"FA Longstaff","year":"2001","unstructured":"Longstaff FA, Schwartz ES (2001) Valuing American options by simulation: a simple least-squares approach. Rev Financ Stud 14:113\u2013148","journal-title":"Rev Financ Stud"},{"key":"620_CR17","doi-asserted-by":"crossref","first-page":"243","DOI":"10.1007\/s00245-007-9034-5","volume":"58","author":"B \u00d8ksendal","year":"2008","unstructured":"\u00d8ksendal B, Sulem A (2008) Optimal stochastic impulse control with delayed reaction. Appl Math Optim 58:243\u2013255","journal-title":"Appl Math Optim"},{"key":"620_CR18","unstructured":"Perninge M (2015) A control-variable regression monte carlo technique for short-term electricity generation planning. \n                        arXiv:1512.08880v1"},{"key":"620_CR19","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1007\/s00186-013-0459-0","volume":"79","author":"M Perninge","year":"2014","unstructured":"Perninge M, S\u00f6der L (2014) Irreversible investments with delayed reaction: an application to generation re-dispatch in power system operation. Math Methods Oper Res 79:195\u2013224. \n                        https:\/\/doi.org\/10.1007\/s00186-013-0459-0","journal-title":"Math Methods Oper Res"},{"key":"620_CR20","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4612-1466-3","volume-title":"Stochastic controls: Hamiltonian systems and HJB equations","author":"J Yong","year":"1999","unstructured":"Yong J, Zhou XY (1999) Stochastic controls: Hamiltonian systems and HJB equations. Springer, New York"}],"container-title":["Mathematical Methods of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00186-017-0620-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00186-017-0620-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00186-017-0620-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,6,14]],"date-time":"2018-06-14T11:51:21Z","timestamp":1528977081000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00186-017-0620-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,11,7]]},"references-count":20,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2018,6]]}},"alternative-id":["620"],"URL":"https:\/\/doi.org\/10.1007\/s00186-017-0620-2","relation":{},"ISSN":["1432-2994","1432-5217"],"issn-type":[{"type":"print","value":"1432-2994"},{"type":"electronic","value":"1432-5217"}],"subject":[],"published":{"date-parts":[[2017,11,7]]}}}