{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,15]],"date-time":"2026-01-15T08:24:03Z","timestamp":1768465443668,"version":"3.49.0"},"reference-count":33,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2006,9,21]],"date-time":"2006-09-21T00:00:00Z","timestamp":1158796800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2008,4]]},"DOI":"10.1007\/s00291-006-0068-x","type":"journal-article","created":{"date-parts":[[2006,10,4]],"date-time":"2006-10-04T07:39:20Z","timestamp":1159947560000},"page":"355-374","source":"Crossref","is-referenced-by-count":164,"title":["A master surgical scheduling approach for cyclic scheduling in operating room departments"],"prefix":"10.1007","volume":"30","author":[{"given":"Jeroen M.","family":"van Oostrum","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Van Houdenhoven","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"J. L.","family":"Hurink","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"E. W.","family":"Hans","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"G.","family":"Wullink","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"G.","family":"Kazemier","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2006,9,21]]},"reference":[{"key":"68_CR1","unstructured":"Bakker H, Zuurbier JJ (2002) Pareto\u2019s law (In Dutch). Zorgvisie 7"},{"issue":"3","key":"68_CR2","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1287\/opre.46.3.316","volume":"46","author":"C Barnhart","year":"1998","unstructured":"Barnhart C, Johnson EL, Neuhauser GL, Savelbergh MWP, Vance PH (1998) Branch-and-price: column generation for solving huge integer programs. Oper Res 46(3):316\u2013329","journal-title":"Oper Res"},{"key":"68_CR3","doi-asserted-by":"crossref","unstructured":"Beli\u00ebn J, Demeulemeester E (2005) Building cyclic master surgery schedules with leveled resulting bed occupancy. Eur J Oper Res (in press)","DOI":"10.2139\/ssrn.870206"},{"key":"68_CR4","volume-title":"AIMMS \u2013 optimization modeling","author":"J Bisschop","year":"1999","unstructured":"Bisschop J (1999) AIMMS \u2013 optimization modeling. Paragon Decision Technology B.V., Harlem"},{"issue":"2","key":"68_CR5","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1287\/inte.32.2.63.57","volume":"32","author":"JT Blake","year":"2002","unstructured":"Blake JT, Donald J (2002) Mount sinai hospital uses integer programming to allocate operating room time. Interfaces 32(2):63\u201373","journal-title":"Interfaces"},{"key":"68_CR6","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker P, Drexl A, Mohring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: notation, classification, models, and methods. Eur J Oper Res 112:3\u201341","journal-title":"Eur J Oper Res"},{"key":"68_CR7","unstructured":"Carter M (2002) Diagnosis: mismanagement of resources. Oper Res Manage Sci Today April 26\u201332"},{"key":"68_CR8","doi-asserted-by":"crossref","first-page":"460","DOI":"10.1287\/opre.12.3.460","volume":"12","author":"A Charnes","year":"1964","unstructured":"Charnes A, Cooper W, Thompson G (1964) Critical path analyses via chance constrained and stochastic programming. Oper Res 12:460\u2013470","journal-title":"Oper Res"},{"key":"68_CR9","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1016\/S0166-218X(99)00020-7","volume":"94","author":"P Dell\u2019Olmo","year":"1999","unstructured":"Dell\u2019Olmo P, Speranza MG (1999) Approximation algorithms for partitioning small items in unequal bins to minimize the total size. Discret Appl Math 94:181\u2013191","journal-title":"Discret Appl Math"},{"issue":"3","key":"68_CR10","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1287\/mnsc.42.3.321","volume":"42","author":"Y Gerhak","year":"1996","unstructured":"Gerhak Y, Gupta D, Henig M (1996) Reservation planning for elective surgery under uncertain demand for emergency surgery. Manage Sci 42(3):321\u2013334","journal-title":"Manage Sci"},{"issue":"1","key":"68_CR11","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1097\/00004010-200101000-00006","volume":"26","author":"S Glouberman","year":"2001","unstructured":"Glouberman S, Mintzberg H (2001) Managing the care of health and the cure of disease Part i: Differentiation. Health Care Manage Rev 26(1):56\u201369","journal-title":"Health Care Manage Rev"},{"key":"68_CR12","volume-title":"Critical chain","author":"EM Goldratt","year":"1997","unstructured":"Goldratt EM (1997) Critical chain. The North River Press, Great Barrington"},{"key":"68_CR13","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1016\/S0925-5273(03)00087-2","volume":"85","author":"A Guinet","year":"2003","unstructured":"Guinet A, Chaabane S (2003) Operating theatre planning. Int J Prod Econ, 85:69\u201381","journal-title":"Int J Prod Econ,"},{"issue":"6","key":"68_CR14","doi-asserted-by":"crossref","first-page":"598","DOI":"10.1080\/095372899232894","volume":"10","author":"JND Gupta","year":"1999","unstructured":"Gupta JND, Ho JC (1999) A new heuristic algorithm for the one-dimensional bin-packing problem. Prod Plan Control 10(6):598\u2013603","journal-title":"Prod Plan Control"},{"key":"68_CR15","unstructured":"Hans EW, Wullink G, Van Houdenhoven M, Kazemier G (2006) Robust surgery loading. Eur J Oper Res (accepted for publication)"},{"key":"68_CR16","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1016\/j.ijpe.2004.12.006","volume":"99","author":"A Jebali","year":"2006","unstructured":"Jebali A, Hadj Alouane AB, Ladet P (2006) Operating room scheduling. Int J Prod Econ 99:52\u201362","journal-title":"Int J Prod Econ"},{"key":"68_CR17","doi-asserted-by":"crossref","first-page":"335","DOI":"10.1016\/S0305-0483(02)00050-6","volume":"30","author":"S Kim","year":"2002","unstructured":"Kim S, Horowitz I (2002) Scheduling hospital services: the efficacy of elective-surgery quotas. Omega 30:335\u2013346","journal-title":"Omega"},{"key":"68_CR18","unstructured":"Lamiri M, Xie X, Dolgui A, Grimaud F (2005) A stochastic model for operating room planning with elective and emergency surgery demands. In: Conference Proceedings ORAHS, Southampton, UK"},{"key":"68_CR19","doi-asserted-by":"crossref","first-page":"1491","DOI":"10.1097\/00000542-200306000-00029","volume":"98","author":"ML McManus","year":"2003","unstructured":"McManus ML, Long MC, Copper A, Mandell J, Berwick DM, Pagano M, Litvak E (2003) Variability in surgical caseload and access to intensive care services. Anesthesiology 98:1491\u20131496","journal-title":"Anesthesiology"},{"key":"68_CR20","doi-asserted-by":"crossref","first-page":"582","DOI":"10.1016\/S0377-2217(97)00006-4","volume":"104","author":"HH Millar","year":"1998","unstructured":"Millar HH, Kiragu M (1998) Cyclic and non-cyclic scheduling of 12\u00a0h shift nurses by network programming. Eur J Oper Res 104:582\u2013592","journal-title":"Eur J Oper Res"},{"key":"68_CR21","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/S0377-2217(99)00498-1","volume":"127","author":"K Neumann","year":"2000","unstructured":"Neumann K, Zimmermann J (2000) Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. Eur J Oper Res 127:425\u2013443","journal-title":"Eur J Oper Res"},{"key":"68_CR22","unstructured":"OECD (2005) Oecd health data 2005 \u2013 statistics and indicators for 30 countries"},{"issue":"3","key":"68_CR23","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1023\/A:1022575412017","volume":"27","author":"SN Ogulata","year":"2003","unstructured":"Ogulata SN, Erol R (2003) A hierarchical multiple criteria mathematical programming approach for scheduling general surgery operatons in large hospitals. J Med Syst 27(3):259\u2013270","journal-title":"J Med Syst"},{"issue":"6","key":"68_CR24","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1023\/A:1005548727003","volume":"24","author":"I Ozkaraham","year":"2000","unstructured":"Ozkaraham I (2000) Allocation of surgeries to operating rooms by goal programming. J Med Syst 24(6):339\u2013378","journal-title":"J Med Syst"},{"key":"68_CR25","volume-title":"Planning and scheduling in manufacturing and services","author":"M Pinedo","year":"2005","unstructured":"Pinedo M (2005) Planning and scheduling in manufacturing and services. Springer Series in Operations Research and Financial Engineering. Springer, Berlin Heidelberg New York"},{"issue":"3","key":"68_CR26","doi-asserted-by":"crossref","first-page":"16","DOI":"10.1287\/inte.31.3.16.9628","volume":"31","author":"E Schmidt","year":"2001","unstructured":"Schmidt E, Dada M, Adams D (2001) Using cyclic planning to manage capacity at alcoa. Interfaces 31(3):16\u201327","journal-title":"Interfaces"},{"key":"68_CR27","doi-asserted-by":"crossref","first-page":"884","DOI":"10.1057\/palgrave.jors.2600441","volume":"48","author":"D Sier","year":"1997","unstructured":"Sier D, Tobin P, McGurk C (1997) Scheduling surgical procedures. J Oper Res Soc 48:884\u2013891","journal-title":"J Oper Res Soc"},{"key":"68_CR28","doi-asserted-by":"crossref","first-page":"1160","DOI":"10.1097\/00000542-200004000-00035","volume":"92","author":"DP Strum","year":"2000","unstructured":"Strum DP, May JH, Vargas LG (2000) Modeling the uncertainty of surgical procedure times: comparison of log-normal and normal models. Anesthesiology 92:1160\u20131167","journal-title":"Anesthesiology"},{"issue":"5","key":"68_CR29","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/inte.30.5.1.11637","volume":"30","author":"S Tayur","year":"2000","unstructured":"Tayur S (2000) Improving operations and quoting accurate lead times in a laminate plant. Interfaces 30(5):1\u201315","journal-title":"Interfaces"},{"issue":"6","key":"68_CR30","doi-asserted-by":"crossref","first-page":"862","DOI":"10.1287\/opre.47.6.862","volume":"47","author":"JM Akker van den","year":"1999","unstructured":"van den Akker JM, Hoogeveen JA, van de Velde SL (1999) Parallel machine scheduling by column generation. Oper Res 47(6):862\u2013872","journal-title":"Oper Res"},{"issue":"3","key":"68_CR31","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1093\/imaman\/dpi023","volume":"16","author":"JMH Vissers","year":"2005","unstructured":"Vissers JMH, Adan IJBF, Bekkers JA (2005) Patient mix optimisation in cardiothoracic surgery planning: a case study. IMA J Manage Math 16(3):281\u2013304","journal-title":"IMA J Manage Math"},{"key":"68_CR32","doi-asserted-by":"crossref","first-page":"314","DOI":"10.1016\/j.jclinane.2004.10.003","volume":"17","author":"C Weissman","year":"2005","unstructured":"Weissman C (2005) The enhanced postoperative care system. J Clin Anesth 17:314\u2013322","journal-title":"J Clin Anesth"},{"key":"68_CR33","volume-title":"Model building in mathematical programming","author":"HP Williams","year":"1999","unstructured":"Williams HP (1999) Model building in mathematical programming, 4th edn. Wiley, New York","edition":"4"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-006-0068-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-006-0068-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-006-0068-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,28]],"date-time":"2019-05-28T10:59:55Z","timestamp":1559041195000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-006-0068-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,9,21]]},"references-count":33,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2008,4]]}},"alternative-id":["68"],"URL":"https:\/\/doi.org\/10.1007\/s00291-006-0068-x","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,9,21]]}}}