{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,3]],"date-time":"2025-11-03T22:55:12Z","timestamp":1762210512920},"reference-count":21,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2007,11,28]],"date-time":"2007-11-28T00:00:00Z","timestamp":1196208000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2009,1]]},"DOI":"10.1007\/s00291-007-0113-4","type":"journal-article","created":{"date-parts":[[2007,11,27]],"date-time":"2007-11-27T04:56:08Z","timestamp":1196139368000},"page":"257-280","source":"Crossref","is-referenced-by-count":18,"title":["Managing product availability in an assemble-to-order supply chain with multiple customer segments"],"prefix":"10.1007","volume":"31","author":[{"given":"Thomas R.","family":"Ervolina","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Markus","family":"Ettl","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Young M.","family":"Lee","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Daniel J.","family":"Peters","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2007,11,28]]},"reference":[{"key":"113_CR1","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1287\/mnsc.1030.0167","volume":"50","author":"Y Akcay","year":"2004","unstructured":"Akcay Y and Xu S (2004). Joint inventory replenishment and component allocation optimization in an assemble-to-order system. Manage Sci 50: 99\u2013116","journal-title":"Manage Sci"},{"issue":"2","key":"113_CR2","doi-asserted-by":"crossref","first-page":"166","DOI":"10.1287\/msom.2.2.166.12349","volume":"2","author":"A Balakrishnan","year":"2000","unstructured":"Balakrishnan A and Geunes J (2000). Requirements planning with substitutions: exploiting bill-of-materials flexibility in production planning. Manuf Serv Oper Manage 2(2): 166\u2013185","journal-title":"Manuf Serv Oper Manage"},{"issue":"1","key":"113_CR3","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1287\/opre.51.1.94.12791","volume":"51","author":"A Balakrishnan","year":"2003","unstructured":"Balakrishnan A and Geunes J (2003). Production planning with flexible product specifications: an application to specialty steel manufacturing. Oper Res 51(1): 94\u2013112","journal-title":"Oper Res"},{"key":"113_CR4","unstructured":"Balakrishnan A, Xia Y, Zhang B (2005) Shaping demand to match anticipated supply. In: MSOM Conference 2005, Northwestern University"},{"key":"113_CR5","doi-asserted-by":"crossref","first-page":"447","DOI":"10.1007\/978-1-4020-7953-5_11","volume-title":"Handbook of quantitative supply chain analysis\u2014modeling in the e-business era","author":"MO Ball","year":"2004","unstructured":"Ball MO, Chen CY and Zhao ZY (2004). Available to promise. In: Simchi-Levi, D, Wu, SD, and Shen, ZJ (eds) Handbook of quantitative supply chain analysis\u2014modeling in the e-business era, pp 447\u2013480. Kluwer, New York"},{"issue":"4","key":"113_CR6","doi-asserted-by":"crossref","first-page":"632","DOI":"10.1287\/opre.47.4.632","volume":"47","author":"Y Bassok","year":"1999","unstructured":"Bassok Y, Anupindi R and Akella R (1999). Single-period multiproduct inventory models with substitution. Oper Res 47(4): 632\u2013642","journal-title":"Oper Res"},{"key":"113_CR7","unstructured":"Cecere L, Hofman D, Martin R, Preslan L (2005) The handbook for becoming demand driven. AMR Research"},{"key":"113_CR8","doi-asserted-by":"crossref","first-page":"424","DOI":"10.1111\/j.1937-5956.2002.tb00470.x","volume":"11","author":"C-Y Chen","year":"2002","unstructured":"Chen C-Y, Zhao Z and Ball MO (2002). A model for batch advanced available-to-promise. Prod Oper Manage 11: 424\u2013440","journal-title":"Prod Oper Manage"},{"key":"113_CR9","unstructured":"Chen-Ritzo C-H (2006) Availability management for configure-to-order supply chain systems. PhD Dissertation, Pennsylvania State University"},{"key":"113_CR10","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1007\/3-540-27354-9_5","volume-title":"Supply chain management on demand","author":"B Dietrich","year":"2005","unstructured":"Dietrich B, Connors D, Ervolina T, Fasano JP, Lougee-Heimer R and Wittrock R (2005). Applications of implosion in manufacturing. In: An, C and Fromm, H (eds) Supply chain management on demand, pp 97\u2013115. Springer, Heidelberg"},{"key":"113_CR11","unstructured":"Ervolina T, Dietrich B (2001) Moving toward dynamic available-to-promise. In: Gass S, Jones AT (eds) Supply chain management practice and research: status and future directions, pp 1\u201319"},{"issue":"7","key":"113_CR12","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1080\/09537280600901152","volume":"17","author":"G Gallego","year":"2006","unstructured":"Gallego G, Katircioglu K and Ramachandran B (2006). Semiconductor inventory management with multiple grade parts and downgrading. Prod Plann Cont 17(7): 689\u2013700","journal-title":"Prod Plann Cont"},{"key":"113_CR13","unstructured":"Hale W, Pyke DF, Rudi N (2001) An assemble-to-order system with component substitution. Working Paper, Tuck School of Business at Dartmouth"},{"issue":"4","key":"113_CR14","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1287\/msom.3.4.321.9968","volume":"3","author":"WJ Hopp","year":"2001","unstructured":"Hopp WJ and Roof Sturgis M (2001). A simple, robust lead time-quoting policy. Manuf Serv Oper Manage 3(4): 321\u2013336","journal-title":"Manuf Serv Oper Manage"},{"key":"113_CR15","volume-title":"Factory physics","author":"W Hopp","year":"2000","unstructured":"Hopp W and Spearman M (2000). Factory physics, 2nd edn. McGraw-Hill\/Irwin, New York","edition":"2"},{"key":"113_CR16","first-page":"179","volume-title":"Supply chain management and advanced planning: concepts, models, software, and case studies","author":"C Kilger","year":"2000","unstructured":"Kilger C and Schneeweiss L (2000). Demand fulfillment and ATP. In: Stadtler, H and Kilger, C (eds) Supply chain management and advanced planning: concepts, models, software and case studies, pp 179\u2013196. Springer, Heidelberg"},{"key":"113_CR17","volume-title":"Trends in supply chain design and management: technologies and methodologies","author":"YM Lee","year":"2006","unstructured":"Lee YM (2006) Analyzing the effectiveness of availability management process. In: Jung H, Chen FF, Jeong B (eds) Trends in supply chain design and management: technologies and methodologies. Springer, Heidelberg"},{"issue":"20","key":"113_CR18","doi-asserted-by":"crossref","first-page":"4353","DOI":"10.1080\/00207540410001716462","volume":"42","author":"S Moses","year":"2004","unstructured":"Moses S, Grant H, Gruenwald L and Pulat S (2004). Real-time due-date promising by build-to-order environments. Int J Prod Res 42(20): 4353\u20134375","journal-title":"Int J Prod Res"},{"key":"113_CR19","unstructured":"O\u2019Marah K, Souza J (2004) DDSN: 21st century supply on demand. AMR Research"},{"issue":"12","key":"113_CR20","doi-asserted-by":"crossref","first-page":"S161","DOI":"10.1287\/mnsc.44.12.S161","volume":"44","author":"JM Swaminathan","year":"1998","unstructured":"Swaminathan JM and Tayur SR (1998). Managing broader product lines through delayed differentiation using vanilla boxes. Manage Sci 44(12): S161\u2013S172","journal-title":"Manage Sci"},{"issue":"4","key":"113_CR21","doi-asserted-by":"crossref","first-page":"615","DOI":"10.1287\/opre.1070.0405","volume":"55","author":"TH Yunes","year":"2007","unstructured":"Yunes TH, Napolitano D, Scheller-Wolf A and Tayur S (2007). Building efficient product portfolios at John Deere and Company. Oper Res 55(4): 615\u2013629","journal-title":"Oper Res"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-007-0113-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-007-0113-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-007-0113-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,28]],"date-time":"2019-05-28T06:59:56Z","timestamp":1559026796000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-007-0113-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,11,28]]},"references-count":21,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2009,1]]}},"alternative-id":["113"],"URL":"https:\/\/doi.org\/10.1007\/s00291-007-0113-4","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,11,28]]}}}