{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,1]],"date-time":"2026-01-01T17:39:32Z","timestamp":1767289172340},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2009,4]]},"DOI":"10.1007\/s00291-008-0122-y","type":"journal-article","created":{"date-parts":[[2008,1,23]],"date-time":"2008-01-23T10:44:24Z","timestamp":1201085064000},"page":"337-360","source":"Crossref","is-referenced-by-count":19,"title":["An integrated approach to inventory and flexible capacity management subject to fixed costs and non-stationary stochastic demand"],"prefix":"10.1007","volume":"31","author":[{"given":"Tarkan","family":"Tan","sequence":"first","affiliation":[]},{"given":"Osman","family":"Alp","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2008,1,24]]},"reference":[{"key":"122_CR1","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1080\/07408170701488052","volume":"40","author":"O Alp","year":"2008","unstructured":"Alp O and Tan T (2008). Tactical capacity management under capacity flexibility. IIE Trans 40: 221\u2013237","journal-title":"IIE Trans"},{"key":"122_CR2","doi-asserted-by":"crossref","first-page":"399","DOI":"10.1287\/mnsc.48.3.399.7726","volume":"48","author":"A Angelus","year":"2002","unstructured":"Angelus A and Porteus EL (2002). Simultaneous capacity and production management of short-life-cycle, produce-to-stock goods under stochastic demand. Manage Sci 48: 399\u2013413","journal-title":"Manage Sci"},{"key":"122_CR3","doi-asserted-by":"crossref","first-page":"1081","DOI":"10.1287\/mnsc.47.8.1081.10232","volume":"47","author":"A Atamt\u00fcrk","year":"2001","unstructured":"Atamt\u00fcrk A and Hochbaum DS (2001). Capacity acquisition, subcontracting and lot sizing. Manage Sci 47: 1081\u20131100","journal-title":"Manage Sci"},{"key":"122_CR4","unstructured":"Beckers I (2005) Fewer flexible workers. Web Magazine, Statistics Netherlands. http:\/\/www.cbs.nl\/en-gb\/menu\/themas\/arbeid-inkomen-sociale-zekerheid\/arbeidsmarkt\/publicaties\/artikelen\/2005-1616-wm.htm . Accessed on 9 March 2006"},{"key":"122_CR5","unstructured":"Beckers I, Siermann C (2005) Over one third of jobholders are regularly working overtime. Web Magazine, Statistics Netherlands. http:\/\/www.cbs.nl\/en-gb\/menu\/themas\/arbeid-inkomen-sociale-zekerheid\/arbeidsmarkt\/publicaties\/artikelen\/2005-1749-wm.htm . Accessed on 9 March 2006"},{"key":"122_CR6","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1016\/j.ijpe.2003.09.010","volume":"90","author":"N Dellaert","year":"2004","unstructured":"Dellaert N and De Kok T (2004). Integrating resource and production decisions in a simple multi-stage assembly system. Int J Produc Econ 90: 281\u2013294","journal-title":"Int J Produc Econ"},{"key":"122_CR7","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1287\/moor.11.2.193","volume":"11","author":"A Federgruen","year":"1986","unstructured":"Federgruen A and Zipkin P (1986). An inventory model with limited production capacity and uncertain demands i. the average cost criterion. Math Oper Res 11: 193\u2013207","journal-title":"Math Oper Res"},{"key":"122_CR8","doi-asserted-by":"crossref","first-page":"603","DOI":"10.1016\/S0377-2217(99)00314-8","volume":"126","author":"G Gallego","year":"2000","unstructured":"Gallego G and Scheller-Wolf A (2000). Capacitated inventory problems with fixed order costs: some optimal policy structure. Eur J Oper Res 126: 603\u2013613","journal-title":"Eur J Oper Res"},{"key":"122_CR9","volume-title":"Planning production, inventories and work force","author":"CC Holt","year":"1960","unstructured":"Holt CC, Modigliani F, Muth JF and Simon HA (1960). Planning production, inventories and work force. Prentice-Hall, Englewood Cliffs"},{"key":"122_CR10","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1023\/B:ANOR.0000011191.49933.04","volume":"125","author":"JQ Hu","year":"2004","unstructured":"Hu JQ, Vakili P and Huang L (2004). Capacity and production management in a single product manufacturing system. Ann Oper Res 125: 191\u2013204","journal-title":"Ann Oper Res"},{"key":"122_CR11","doi-asserted-by":"crossref","first-page":"899","DOI":"10.1287\/opre.46.6.899","volume":"46","author":"R Kapuscinski","year":"1998","unstructured":"Kapuscinski R and Tayur S (1998). A capacitated production-inventory model with periodic demand. Oper Res 46: 899\u2013911","journal-title":"Oper Res"},{"key":"122_CR12","first-page":"135","volume-title":"Studies in the mathematical theory of inventory and production","author":"S Karlin","year":"1958","unstructured":"Karlin S (1958). Optimal inventory policies for the arrow-harris-marschak dynamic model. In: Arrow, K, Karlin, S and Scarf, H (eds) Studies in the mathematical theory of inventory and production, pp 135\u2013154. Stanford University Press, Stanford, California"},{"key":"122_CR13","doi-asserted-by":"crossref","first-page":"1046","DOI":"10.1287\/mnsc.47.8.1046.10233","volume":"47","author":"JM Milner","year":"2001","unstructured":"Milner JM and Pinker EJ (2001). Contingent labor contracting under demand and supply uncertainty. Manage Sci 47: 1046\u20131062","journal-title":"Manage Sci"},{"key":"122_CR14","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/S0377-2217(01)00378-2","volume":"144","author":"EJ Pinker","year":"2003","unstructured":"Pinker EJ and Larson RC (2003). Optimizing the use of contingent labor when demand is uncertain. Eur J Oper Res 144: 39\u201355","journal-title":"Eur J Oper Res"},{"key":"122_CR15","first-page":"605","volume-title":"Handbooks in OR & MS, vol. 2","author":"EL Porteus","year":"1990","unstructured":"Porteus EL (1990). Stochastic inventory theory. In: Heyman, DP and Sobel, MJ (eds) Handbooks in OR & MS, vol. 2, pp 605\u2013652. Elsevier, North-Holland"},{"key":"122_CR16","first-page":"196","volume-title":"Mathematical methods in the social sciences","author":"H Scarf","year":"1959","unstructured":"Scarf H (1959). The optimality of (S, s) policies in the dynamic inventory problem. In: Arrow, K, Karlin, S and Suppes, H (eds) Mathematical methods in the social sciences, pp 196\u2013202. Stanford University Press, Stanford, California"},{"key":"122_CR17","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1023\/B:ANOR.0000011192.23903.7f","volume":"125","author":"B Tan","year":"2004","unstructured":"Tan B and Gershwin SB (2004). Production and subcontracting strategies for manufacturers with limited capacity and volatile demand. Ann Oper Res 125: 205\u2013232","journal-title":"Ann Oper Res"},{"key":"122_CR18","unstructured":"Turkish Statistical Institute (2006) Labour force survey, June 2006. http:\/\/www.turkstat.gov.tr Accessed on 20 June 2006"},{"key":"122_CR19","unstructured":"US Bureau of Labor Statistics (2006) Contingent and alternative employment arrangements. http:\/\/www.bls.gov\/cps\/ Accessed on 10 June 2006"},{"key":"122_CR20","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1287\/msom.5.4.269.24882","volume":"5","author":"JA Mieghem van","year":"2003","unstructured":"van Mieghem JA (2003). Capacity management, investment and hedging: review and recent developments. Manuf Serv Oper Manag 5: 269\u2013302","journal-title":"Manuf Serv Oper Manag"},{"key":"122_CR21","doi-asserted-by":"crossref","first-page":"328","DOI":"10.1287\/opre.1040.0165","volume":"53","author":"J Yang","year":"2005","unstructured":"Yang J, Qi X and Xia Y (2005). A production-inventory system with markovian capacity and outsourcing option. Oper Res 53: 328\u2013349","journal-title":"Oper Res"},{"key":"122_CR22","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1016\/0925-5273(93)90084-X","volume":"30\u201331","author":"B Wild","year":"1993","unstructured":"Wild B and Schneeweiss C (1993). Manpower capacity planning - a hierarchical approach. Int J Produc Econ 30\u201331: 95\u2013106","journal-title":"Int J Produc Econ"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-008-0122-y.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,7]],"date-time":"2019-04-07T07:58:20Z","timestamp":1554623900000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-008-0122-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,1,24]]},"references-count":22,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2009,4]]}},"alternative-id":["122"],"URL":"https:\/\/doi.org\/10.1007\/s00291-008-0122-y","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,1,24]]}}}