{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,21]],"date-time":"2026-03-21T04:31:35Z","timestamp":1774067495926,"version":"3.50.1"},"reference-count":37,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2008,8,26]],"date-time":"2008-08-26T00:00:00Z","timestamp":1219708800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2009,4]]},"DOI":"10.1007\/s00291-008-0147-2","type":"journal-article","created":{"date-parts":[[2008,8,25]],"date-time":"2008-08-25T05:10:39Z","timestamp":1219641039000},"page":"311-336","source":"Crossref","is-referenced-by-count":41,"title":["Modeling and optimizing of strategic and tactical production planning in the automotive industry under uncertainty"],"prefix":"10.1007","volume":"31","author":[{"given":"Ralf","family":"Bihlmaier","sequence":"first","affiliation":[]},{"given":"Achim","family":"Koberstein","sequence":"additional","affiliation":[]},{"given":"Ren\u00e9","family":"Obst","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2008,8,26]]},"reference":[{"issue":"1","key":"147_CR1","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1023\/A:1023071216923","volume":"26","author":"A Alonso-Ayuso","year":"2003","unstructured":"Alonso-Ayuso A, Escudero LF, Garf\u00edn A, Ortu\u00f1o MT, P\u00e9rez G (2003) An approach for strategic supply chain planning under uncertainty based on stochastic 0\u20131 programming. J Global Optim 26(1): 97\u2013124","journal-title":"J Global Optim"},{"issue":"1","key":"147_CR2","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1287\/inte.25.1.69","volume":"25","author":"BC Arntzen","year":"1995","unstructured":"Arntzen BC, Brown GG, Harrison TP, Traffton LL (1995) Global supply chain management at digital equipment corporation. Interfaces 25(1): 69\u201393","journal-title":"Interfaces"},{"key":"147_CR3","unstructured":"Askar G, Zimmermann J (2006) Optimal usage of flexibility instruments in automotive plants. Oper Res Proc, pp 479\u2013484"},{"key":"147_CR4","unstructured":"Barnett L, Leaney PG, Matke J (1995) Striving for manufacturing flexibility in body construction. In: Proceedings of the IMechE AutoTech\/95 Conference"},{"issue":"3","key":"147_CR5","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1016\/S0925-5273(98)00079-6","volume":"55","author":"BM Beamon","year":"1998","unstructured":"Beamon BM (1998) Supply chain design and analysis: Models and methods. Int J Prod Econ 55(3): 281\u2013294","journal-title":"Int J Prod Econ"},{"key":"147_CR6","unstructured":"Becker H (2005) Auf Crashkurs. Automobilindustrie im globalen Verdr\u00e4ngungswettbewerb. Springer, Berlin"},{"key":"147_CR7","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1007\/BF01386316","volume":"4","author":"JF Benders","year":"1962","unstructured":"Benders JF (1962) Partitioning prodedures for solving mixed-variables programming problems. Numer Math 4: 238\u2013252","journal-title":"Numer Math"},{"issue":"3","key":"147_CR8","doi-asserted-by":"crossref","first-page":"384","DOI":"10.1016\/0377-2217(88)90159-2","volume":"34","author":"JR Birge","year":"1988","unstructured":"Birge JR, Louveaux F (1988) A multicut algorithm for two-stage stochastic linear programs. Euro J Oper Res 34(3): 384\u2013392","journal-title":"Euro J Oper Res"},{"key":"147_CR9","unstructured":"Birge JR, Louveaux F (1997) Introduction to stochastic programming. Springer Series in Operations Research. Springer, New York"},{"key":"147_CR10","unstructured":"Boettcher J (1989) Stochastische lineare Programme mit Kompensation, Mathematical systems in economics. vol 115. Athen\u00e4um, Frankfurt am Main"},{"issue":"5","key":"147_CR11","doi-asserted-by":"crossref","first-page":"495","DOI":"10.1016\/0305-0483(96)82815-5","volume":"24","author":"KK Boyer","year":"1996","unstructured":"Boyer KK, Leong GK (1996) Manufacturing flexibility at the plant level. Omega Int J Manage Sci 24(5): 495\u2013510","journal-title":"Omega Int J Manage Sci"},{"key":"147_CR12","unstructured":"Bruynesteyn M (2003) Flex appeal. Prudential Equity Group, LLC"},{"issue":"1","key":"147_CR13","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1016\/j.omega.2004.03.004","volume":"33","author":"C Chandra","year":"2005","unstructured":"Chandra C, Everson M, Grabis J (2005) Evaluation of enterprise-level benefits of manufacturing flexibility. Omega Int J Manage Sci 33(1): 17\u201331","journal-title":"Omega Int J Manage Sci"},{"issue":"1","key":"147_CR14","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1007\/s10479-006-0001-3","volume":"144","author":"SF Cordeau","year":"2006","unstructured":"Cordeau SF, Pasin F, Solomon MM (2006) An integrated model for logistics network design. Ann Oper Res 144(1): 59\u201382","journal-title":"Ann Oper Res"},{"key":"147_CR15","unstructured":"Ferber S (2005) Strategische Kapazit\u00e4ts- und Investitionsplanung in der globalen Supply Chain eines Automobilherstellers. Shaker, Indianapolis"},{"key":"147_CR16","doi-asserted-by":"crossref","first-page":"194","DOI":"10.1287\/inte.1050.0187","volume":"36","author":"B Fleischmann","year":"2006","unstructured":"Fleischmann B, Ferber S, Henrich P (2006) Strategic planning of BMW\u2019s global production network. Interfaces 36: 194\u2013208","journal-title":"Interfaces"},{"key":"147_CR17","doi-asserted-by":"crossref","unstructured":"Francas D, Kremer M, Minner S, Friese M (2007) Strategic process flexibility under lifecycle demand. Int J Prod Econ. doi: 10.1016\/j.ijpe.2006.12.062","DOI":"10.1016\/j.ijpe.2006.12.062"},{"key":"147_CR18","unstructured":"Friese M, Bihlmaier R, Buerkner S (2005) Planning of flexible production networks in the automotive industry. In: International conference on changeable, agile, reconfigurable and virtual production, Muenchen, 22\u201323, September"},{"issue":"5","key":"147_CR19","doi-asserted-by":"crossref","first-page":"822","DOI":"10.1287\/mnsc.20.5.822","volume":"20","author":"AM Geoffrion","year":"1974","unstructured":"Geoffrion AM, Graves GW (1974) Multicommodity distribution system design by benders decomposition. Manage Sci 20(5): 822\u2013844","journal-title":"Manage Sci"},{"issue":"2","key":"147_CR20","first-page":"107","volume":"60","author":"D Gerwin","year":"1982","unstructured":"Gerwin D (1982) Do\u2019s and don\u2019ts of computerized manufacturing. Harvard Bus Rev 60(2): 107\u2013116","journal-title":"Harvard Bus Rev"},{"key":"147_CR21","unstructured":"Goetschalckx Strategic Network Planning. BT and Centre for Automotive Industry Research, Cardiff (2001)"},{"key":"147_CR22","doi-asserted-by":"crossref","unstructured":"Goetschalckx M (2002) Strategic network planning. In: Stadtler H, Kilger\u00a0 C (eds) Supply chain management and advanced planning. Springer, Heidelberg, pp 105\u2013122","DOI":"10.1007\/978-3-662-10142-1_7"},{"key":"147_CR23","unstructured":"ILOG Inc. ILOG CPLEX 10.0 Advanced reference manual. ILOG CPLEX Division, France, 2006"},{"issue":"4","key":"147_CR24","doi-asserted-by":"crossref","first-page":"577","DOI":"10.1287\/mnsc.41.4.577","volume":"41","author":"WC Jordan","year":"1995","unstructured":"Jordan WC, Graves SC (1995) Principles on the benefits of manufacturing process flexibility. Manage Sci 41(4): 577\u2013594","journal-title":"Manage Sci"},{"key":"147_CR25","volume-title":"Stochastic programming","author":"P Kall","year":"1994","unstructured":"Kall P, Wallace SW (1994) Stochastic programming. Wiley, Chichester"},{"key":"147_CR26","volume-title":"Estimation of distribution algorithms: a new tool for evolutionary computation","author":"P Larranaga","year":"2001","unstructured":"Larranaga P, Lozano JA (2001) Estimation of distribution algorithms: a new tool for evolutionary computation. Springer, Heidelberg"},{"key":"147_CR27","volume-title":"Value-adding logistics for a world assembly line","author":"B Meyer","year":"2004","unstructured":"Meyer B (2004) Value-adding logistics for a world assembly line. Bonifatius Verlag, Paderborn"},{"issue":"5","key":"147_CR28","doi-asserted-by":"crossref","first-page":"511","DOI":"10.1016\/S0167-8191(99)00118-0","volume":"26","author":"SA MirHassani","year":"2000","unstructured":"MirHassani SA, Lucas C, Mitra G, Messina E, Poojari CA (2000) Computational solution of capacity planning models under uncertainty. Parallel Comput 26(5): 511\u2013538","journal-title":"Parallel Comput"},{"key":"147_CR29","doi-asserted-by":"crossref","unstructured":"Pibernik R (2001) Flexibilit\u00e4tsplanung in Wertsch\u00f6pfungsnetzwerken, 1 edn. Dt. Universit\u00e4ts-Verlag, Wiesbaden","DOI":"10.1007\/978-3-322-91453-8_1"},{"key":"147_CR30","unstructured":"Roscher J (2008) Bewertung von Flexibilit\u00e4tsstrategien fuer die Endmontage in der Automobilindustrie. PhD Thesis, Institut f\u00fcr Industrielle Fertigung und Fabrikbetrieb, Universit\u00e4t Stuttgart"},{"key":"147_CR31","doi-asserted-by":"crossref","unstructured":"Ruszczy\u0144ski A, Shapiro A (2003) Stochastic Programming, Handbooks in Operations Research and Management Science. vol 10. Academic Press, Australia","DOI":"10.1016\/S0927-0507(03)10001-1"},{"key":"147_CR32","unstructured":"Santoso T (2003) A comprehensive model and efficient solution algorithm for the design of global supply chains under uncertainty. PhD Thesis, Georgia Institute of Technology"},{"issue":"1","key":"147_CR33","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.ejor.2004.01.046","volume":"167","author":"T Santoso","year":"2005","unstructured":"Santoso T, Ahmed S, Goetschalckx M, Shapiro A (2005) A stochastic programming approach for supply chain network design under uncertainty. Euro J Oper Res 167(1): 96\u2013115","journal-title":"Euro J Oper Res"},{"key":"147_CR34","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-03830-7","volume-title":"Hierarchies in distributed decision making","author":"C Schneeweiss","year":"1999","unstructured":"Schneeweiss C (1999) Hierarchies in distributed decision making. Springer, Berlin"},{"issue":"4","key":"147_CR35","first-page":"289","volume":"2","author":"A Sethi","year":"1990","unstructured":"Sethi A, Sethi S (1990) Flexibility in manufacturing: a survey. Int J Flexible Manufact Syst 2(4): 289\u2013328","journal-title":"Int J Flexible Manufact Syst"},{"issue":"1","key":"147_CR36","first-page":"95","volume":"29","author":"CJ Vidal","year":"2000","unstructured":"Vidal CJ, Goetschalckx M (2000) Modeling the impact of uncertainties on global logistics systems. J Bus Logistics 29(1): 95\u2013120","journal-title":"J Bus Logistics"},{"key":"147_CR37","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1007\/BF01194335","volume":"44","author":"P Wentges","year":"1996","unstructured":"Wentges P (1996) Accelerating bender\u2019s decomposition for the capacitated facility location problem. Math Methods Oper Res 44: 267\u2013290","journal-title":"Math Methods Oper Res"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-008-0147-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-008-0147-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-008-0147-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,28]],"date-time":"2019-05-28T06:59:57Z","timestamp":1559026797000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-008-0147-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,8,26]]},"references-count":37,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2009,4]]}},"alternative-id":["147"],"URL":"https:\/\/doi.org\/10.1007\/s00291-008-0147-2","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,8,26]]}}}