{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T13:19:38Z","timestamp":1762521578609},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2013,6,7]],"date-time":"2013-06-07T00:00:00Z","timestamp":1370563200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2014,7]]},"DOI":"10.1007\/s00291-013-0330-y","type":"journal-article","created":{"date-parts":[[2013,6,6]],"date-time":"2013-06-06T01:05:35Z","timestamp":1370480735000},"page":"693-722","source":"Crossref","is-referenced-by-count":6,"title":["A GRASP heuristic for slab scheduling at continuous casters"],"prefix":"10.1007","volume":"36","author":[{"given":"Matthias Gerhard","family":"Wichmann","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Thomas","family":"Volling","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Thomas Stefan","family":"Spengler","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,6,7]]},"reference":[{"issue":"2","key":"330_CR1","doi-asserted-by":"crossref","first-page":"260","DOI":"10.1016\/j.ijpe.2004.10.016","volume":"104","author":"A Bellabdaoui","year":"2006","unstructured":"Bellabdaoui A, Teghem J (2006) A mixed-integer linear programming model for the continuous casting planning. Int J Prod Econ 104(2):260\u2013270","journal-title":"Int J Prod Econ"},{"key":"330_CR2","doi-asserted-by":"crossref","unstructured":"Binato S, Hery WJ, Loewenstern D, Resende MGC (2001) A greedy randomized adaptive search procedure for job shop scheduling. In: Hansen P, Ribeiro CC (eds) Essays and surveys on metaheuristics. Kluwer Academic Publishers, Dordrecht","DOI":"10.1007\/978-1-4615-1507-4_3"},{"key":"330_CR3","unstructured":"Bresina JL (1996) Heuristic-biased stochastic sampling. In: Proceedings of the AAAI"},{"issue":"4","key":"330_CR4","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1080\/095372800232090","volume":"11","author":"S Chang","year":"2000","unstructured":"Chang S, Chang MR, Hong Y (2000) A lot-grouping algorithm for a continuous slab caster in an integrated steel mill. Prod Plan Control 11(4):363\u2013368","journal-title":"Prod Plan Control"},{"issue":"1","key":"330_CR5","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1007\/s10732-005-6997-8","volume":"11","author":"VA Cicirello","year":"2005","unstructured":"Cicirello VA, Smith SF (2005) Enhancing stochastic search performance by value-biased randomization of heuristics. J Heuristics 11(1):5\u201334","journal-title":"J Heuristics"},{"issue":"3","key":"330_CR6","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1287\/inte.1040.0077","volume":"34","author":"M Dawande","year":"2004","unstructured":"Dawande M, Kalagnanam J, Lee HS, Reddy C, Siegel S, Trumbo M (2004) The slab design problem in the steel industry. Interfaces 34(3):215\u2013225","journal-title":"Interfaces"},{"key":"330_CR7","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1287\/mnsc.4.4.415","volume":"4","author":"T Fabian","year":"1958","unstructured":"Fabian T (1958) A linear programming model of integrated iron and steel production. Manag Sci 4:415\u2013449","journal-title":"Manag Sci"},{"issue":"2","key":"330_CR8","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1016\/0167-6377(89)90002-3","volume":"8","author":"TA Feo","year":"1989","unstructured":"Feo TA, Resende MG (1989) A probabilistic heuristic for a computationally difficult set covering problem. Oper Res Lett 8(2):67\u201371","journal-title":"Oper Res Lett"},{"issue":"1","key":"330_CR9","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1111\/j.1475-3995.2009.00663.x","volume":"16","author":"P Festa","year":"2009","unstructured":"Festa P, Resende MGC (2009) An annotated bibliography of grasp\u2014Part I: Algorithms. Int Trans Oper Res 16(1):1\u201324","journal-title":"Int Trans Oper Res"},{"key":"330_CR10","unstructured":"Frisch AM, Miguel I, Walsh T (2001) Modelling a steel mill slab design problem. In: Proceedings of the IJCAI 01 workshop on modelling and solving problems with constraints, pp 39\u201345"},{"key":"330_CR11","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1090\/S0002-9939-1956-0078686-7","volume":"7","author":"JB Kruskal","year":"1956","unstructured":"Kruskal JB (1956) On the shortest spanning subtree of a graph and the travelling salesman problem. Proc Am Math Soc 7:48\u201350","journal-title":"Proc Am Math Soc"},{"issue":"2","key":"330_CR12","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1147\/rd.402.0231","volume":"40","author":"HS Lee","year":"1996","unstructured":"Lee HS, Murthy SS, Haider SW, Morse DV (1996) Primary production scheduling at steelmaking industries. IBM J Res Dev 40(2):231\u2013252","journal-title":"IBM J Res Dev"},{"key":"330_CR13","unstructured":"Li T, Xi Y (2007) An optimal two-stage algorithm for slab design problem with flexible demands. In: Proceedings of the IEEE, pp 1789\u20131793"},{"key":"330_CR14","doi-asserted-by":"crossref","unstructured":"Prais M, Ribeiro C (2000) Reactive grasp: an application to a matrix decomposition problem in tdma traffic assignment. INFORMS J Computm 164\u2013176","DOI":"10.1287\/ijoc.12.3.164.12639"},{"issue":"3","key":"330_CR15","doi-asserted-by":"crossref","first-page":"305","DOI":"10.1007\/BF00932613","volume":"14","author":"CN Redwine","year":"1974","unstructured":"Redwine CN, Wismer DA (1974) A mixed integer programming model for scheduling orders in a steel mill. J Optim Theory Appl 14(3):305\u2013318","journal-title":"J Optim Theory Appl"},{"key":"330_CR16","doi-asserted-by":"crossref","unstructured":"Resende M, Ribeiro C (2003) Greedy randomized adaptive search procedures. In: Glover F, Kochenberger G (eds) Handbook of metaheuristics. International Series in Operations Research and Management Science, vol. 57. Springer, New York, pp 219\u2013249","DOI":"10.1007\/0-306-48056-5_8"},{"key":"330_CR17","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1007\/BF01580430","volume":"8","author":"GT Ross","year":"1975","unstructured":"Ross GT, Soland RM (1975) A branch and bound algorithm for the generalized assignment problem. Math Program 8:91\u2013103","journal-title":"Math Program"},{"key":"330_CR18","unstructured":"Salzgitter AG (2011) Gesch\u00e4ftsbericht 2010. http:\/\/www.salzgitter-ag.de\/MDB\/Investor_Relations\/Downloads\/Finanzberichte\/2010\/szag_gb_2010.pdf"},{"key":"330_CR19","unstructured":"Spengler TS, Seefried O (2003) Optimale Belegungsplanung von Stranggie\u00dfanlagen mittels 2-dimensionaler Bin-Packing-Modelle. Oper Res Proc 2002:53\u201358"},{"key":"330_CR20","unstructured":"Stahleisen (ed) (2003) Steel manual. Verlag Stahleisen GmbH, D\u00fcsseldorf"},{"key":"330_CR21","unstructured":"Stahleisen (ed) (2010) STAHL-Statistik. Verlag Stahleisen GmbH, D\u00fcsseldorf. http:\/\/www3.stahleisen.de\/LinkClick.aspx?fileticket=EQfilXMNNGw%3d"},{"key":"330_CR22","doi-asserted-by":"crossref","first-page":"1453","DOI":"10.1016\/j.ejor.2006.09.090","volume":"182","author":"L Tang","year":"2007","unstructured":"Tang L, Liu G (2007) A mathematical programming model and solution for scheduling production orders in shanghai baoshan iron and steel complex. Eur J Oper Res 182:1453\u20131468","journal-title":"Eur J Oper Res"},{"issue":"1","key":"330_CR23","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(00)00240-X","volume":"133","author":"L Tang","year":"2001","unstructured":"Tang L, Liu J, Rong A, Yang Z (2001) A review of planning and scheduling systems and methods for integrated steel production. Eur J Oper Res 133(1):1\u201320","journal-title":"Eur J Oper Res"},{"key":"330_CR24","doi-asserted-by":"crossref","unstructured":"Tang L, Wang G (2008) Decision support system for the batching problems of steelmaking and continuous-casting production. Omega 36(6): 976\u2013991. A Special Issue Dedicated to the 2008 Beijing Olympic Games","DOI":"10.1016\/j.omega.2007.11.002"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-013-0330-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-013-0330-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-013-0330-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,14]],"date-time":"2019-07-14T15:58:39Z","timestamp":1563119919000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-013-0330-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,6,7]]},"references-count":24,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2014,7]]}},"alternative-id":["330"],"URL":"https:\/\/doi.org\/10.1007\/s00291-013-0330-y","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,6,7]]}}}