{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,20]],"date-time":"2026-11-20T18:28:44Z","timestamp":1795199324230,"version":"4.10.3"},"reference-count":26,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2015,5,23]],"date-time":"2015-05-23T00:00:00Z","timestamp":1432339200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2015,10]]},"DOI":"10.1007\/s00291-015-0400-4","type":"journal-article","created":{"date-parts":[[2015,5,22]],"date-time":"2015-05-22T06:22:14Z","timestamp":1432275734000},"page":"929-950","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":78,"title":["Tight MIP formulations of the power-based unit commitment problem"],"prefix":"10.1007","volume":"37","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-6372-6197","authenticated-orcid":false,"given":"Germ\u00e1n","family":"Morales-Espa\u00f1a","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Claudio","family":"Gentile","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Andres","family":"Ramos","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2015,5,23]]},"reference":[{"issue":"3","key":"400_CR1","doi-asserted-by":"crossref","first-page":"1371","DOI":"10.1109\/TPWRS.2006.876672","volume":"21","author":"M Carrion","year":"2006","unstructured":"Carrion M, Arroyo J (2006) A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem. IEEE Trans Power Syst 21(3):1371\u20131378. doi: 10.1109\/TPWRS.2006.876672","journal-title":"IEEE Trans Power Syst"},{"key":"400_CR2","unstructured":"Damci-Kurt P, Kucukyavuz S, Rajan D, Atamturk A (2013) A polyhedral study of ramping in unit committment. Research report BCOL.13.02 IEOR, University of California-Berkeley. http:\/\/ieor.berkeley.edu\/~atamturk\/pubs\/ramping.pdf"},{"key":"400_CR3","unstructured":"ERCOT (2011) White Paper functional description of core market management system (MMS) applications for look-ahead SCED, version 0.1.2. Tech. rep., Electric Reliability Council of Texas (ERCOT), Texas-USA. http:\/\/www.ercot.com\/content\/meetings\/metf\/keydocs\/2012\/0228\/04_white_paper_funct_desc_core_mms_applications_for_la_sced.doc"},{"key":"400_CR4","unstructured":"FERC (2012) RTO Unit Commitment Test System Tech. rep., Federal Energy and Regulatory Commission, Washington DC, USA"},{"issue":"4","key":"400_CR5","doi-asserted-by":"crossref","first-page":"767","DOI":"10.1287\/opre.1060.0309","volume":"54","author":"A Frangioni","year":"2006","unstructured":"Frangioni A, Gentile C (2006) Solving nonlinear single-unit commitment problems with ramping constraints. Operat Res 54(4):767\u2013775. doi: 10.1287\/opre.1060.0309","journal-title":"Operat Res"},{"issue":"5","key":"400_CR6","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1016\/j.ijepes.2007.10.003","volume":"30","author":"A Frangioni","year":"2008","unstructured":"Frangioni A, Gentile C, Lacalandra F (2008) Solving unit commitment problems with general ramp constraints. Int J Electric Power Energy Syst 30(5):316\u2013326. doi: 10.1016\/j.ijepes.2007.10.003","journal-title":"Int J Electric Power Energy Syst"},{"issue":"1","key":"400_CR7","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1109\/TPWRS.2008.2004744","volume":"24","author":"A Frangioni","year":"2009","unstructured":"Frangioni A, Gentile C, Lacalandra F (2009) Tighter approximated MILP formulations for unit commitment problems. IEEE Trans Power Syst 24(1):105\u2013113. doi: 10.1109\/TPWRS.2008.2004744","journal-title":"IEEE Trans Power Syst"},{"issue":"4","key":"400_CR8","doi-asserted-by":"crossref","first-page":"2220","DOI":"10.1109\/TPWRS.2007.907584","volume":"22","author":"J Garcia-Gonzalez","year":"2007","unstructured":"Garcia-Gonzalez J, San Roque A, Campos F, Villar J (2007) Connecting the intraday energy and reserve markets by an optimal redispatch. IEEE Trans Power Syst 22(4):2220\u20132231. doi: 10.1109\/TPWRS.2007.907584","journal-title":"IEEE Trans Power Syst"},{"key":"400_CR9","unstructured":"Gentile C, Morales-Espana G, Ramos A (2014) A tight MIP formulation of the unit commitment problem with start-up and shut-down constraints. Technical report IIT-14-040A, Institute for Research in Technology (IIT). www.optimization-online.org\/DB_FILE\/2014\/07\/4433.pdf"},{"issue":"4","key":"400_CR10","doi-asserted-by":"crossref","first-page":"1275","DOI":"10.1109\/59.898101","volume":"15","author":"X Guan","year":"2000","unstructured":"Guan X, Gao F, Svoboda A (2000) Energy delivery capacity and generation scheduling in the deregulated electric power market. IEEE Trans Power Syst 15(4):1275\u20131280. doi: 10.1109\/59.898101","journal-title":"IEEE Trans Power Syst"},{"key":"400_CR11","doi-asserted-by":"crossref","DOI":"10.1007\/b108628","volume-title":"The next generation of electric power unit commitment models","author":"BF Hobbs","year":"2001","unstructured":"Hobbs BF, Rothkopf MH, O\u2019Neill RP, Chao HP (2001) The next generation of electric power unit commitment models, 1st edn. Springer, Berlin","edition":"1"},{"key":"400_CR12","doi-asserted-by":"crossref","unstructured":"Lee J, Leung J, Margot F (2004) Min-up\/min-down polytopes. Discret Optim 1(1):77\u201385. doi: 10.1016\/j.disopt.2003.12.001","DOI":"10.1016\/j.disopt.2003.12.001"},{"issue":"3","key":"400_CR13","doi-asserted-by":"crossref","first-page":"1367","DOI":"10.1109\/TPWRS.2010.2070848","volume":"26","author":"P Meibom","year":"2011","unstructured":"Meibom P, Barth R, Hasche B, Brand H, Weber C, O\u2019Malley M (2011) Stochastic optimization model to study the operational impacts of high wind penetrations in Ireland. IEEE Trans Power Syst 26(3):1367\u20131379. doi: 10.1109\/TPWRS.2010.2070848","journal-title":"IEEE Trans Power Syst"},{"key":"400_CR14","unstructured":"Morales-Espa\u00f1a G (2014) Unit commitment: computational performance, system representation and wind uncertainty management. Ph.D. thesis, Pontifical Comillas University, KTH Royal Institute of Technology, and Delft University of Technology, Spain"},{"key":"400_CR15","doi-asserted-by":"crossref","unstructured":"Morales-Espana G, Garcia-Gonzalez J, Ramos A (2012) Impact on reserves and energy delivery of current UC-based Market-Clearing formulations. In: European energy market (EEM), 2012 9th international conference on the, pp. 1\u20137. Florence, Italy. doi: 10.1109\/EEM.2012.6254749","DOI":"10.1109\/EEM.2012.6254749"},{"issue":"4","key":"400_CR16","doi-asserted-by":"crossref","first-page":"4897","DOI":"10.1109\/TPWRS.2013.2251373","volume":"28","author":"G Morales-Espana","year":"2013","unstructured":"Morales-Espana G, Latorre JM, Ramos A (2013) Tight and compact MILP formulation for the thermal unit commitment problem. IEEE Trans Power Syst 28(4):4897\u20134908. doi: 10.1109\/TPWRS.2013.2251373","journal-title":"IEEE Trans Power Syst"},{"issue":"2","key":"400_CR17","doi-asserted-by":"crossref","first-page":"1288","DOI":"10.1109\/TPWRS.2012.2222938","volume":"28","author":"G Morales-Espana","year":"2013","unstructured":"Morales-Espana G, Latorre JM, Ramos A (2013) Tight and compact MILP formulation of start-up and shut-down ramping in unit commitment. IEEE Trans Power Syst 28(2):1288\u20131296. doi: 10.1109\/TPWRS.2012.2222938","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"400_CR18","doi-asserted-by":"crossref","first-page":"476","DOI":"10.1109\/TPWRS.2013.2259601","volume":"29","author":"G Morales-Espana","year":"2014","unstructured":"Morales-Espana G, Ramos A, Garcia-Gonzalez J (2014) An MIP formulation for joint market-clearing of energy and reserves based on ramp scheduling. IEEE Trans Power Syst 29(1):476\u2013488. doi: 10.1109\/TPWRS.2013.2259601","journal-title":"IEEE Trans Power Syst"},{"issue":"2","key":"400_CR19","doi-asserted-by":"crossref","first-page":"1196","DOI":"10.1109\/TPWRS.2003.821611","volume":"19","author":"N Padhy","year":"2004","unstructured":"Padhy N (2004) Unit commitment-a bibliographical survey. IEEE Trans Power Syst 19(2):1196\u20131205. doi: 10.1109\/TPWRS.2003.821611","journal-title":"IEEE Trans Power Syst"},{"key":"400_CR20","unstructured":"Rajan D, Takriti S (2005) Minimum up\/down polytopes of the unit commitment problem with start-up costs. Research report RC23628, IBM. http:\/\/domino.research.ibm.com\/library\/cyberdig.nsf\/1e4115aea78b6e7c85256b360066f0d4\/cdcb02a7c809d89e8525702300502ac0?OpenDocument"},{"key":"400_CR21","doi-asserted-by":"crossref","DOI":"10.1002\/047122412X","volume-title":"Market operations in electric power systems: forecasting, scheduling, and risk management","author":"M Shahidehpour","year":"2002","unstructured":"Shahidehpour M, Yamin H, Li Z (2002) Market operations in electric power systems: forecasting, scheduling, and risk management, 1st edn. Wiley-IEEE Press, New York","edition":"1"},{"key":"400_CR22","doi-asserted-by":"crossref","DOI":"10.1109\/9780470545584","volume-title":"Power system economics: designing markets for electricity, 1st edn.","author":"S Stoft","year":"2002","unstructured":"Stoft S (2002) Power system economics: designing markets for electricity, 1st edn. Wiley-IEEE Press, New York"},{"key":"400_CR23","doi-asserted-by":"crossref","unstructured":"Tahanan M, Ackooij WV, Frangioni A, Lacalandra F (2015) Large-scale unit commitment under uncertainty. 4OR pp. 1\u201357 (2015). doi: 10.1007\/s10288-014-0279-y","DOI":"10.1007\/s10288-014-0279-y"},{"key":"400_CR24","volume-title":"Model Building in mathematical programming, 5th edition edn","author":"HP Williams","year":"2013","unstructured":"Williams HP (2013) Model Building in mathematical programming, 5th edition edn. Wiley, New York"},{"key":"400_CR25","unstructured":"Wolsey, L.: Integer Programming. Wiley-Interscience (1998)"},{"issue":"2\u20133","key":"400_CR26","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1016\/j.epsr.2003.10.002","volume":"69","author":"HY Yamin","year":"2004","unstructured":"Yamin HY (2004) Review on methods of generation scheduling in electric power systems. Electric Power Syst Res 69(2\u20133):227\u2013248. doi: 10.1016\/j.epsr.2003.10.002","journal-title":"Electric Power Syst Res"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-015-0400-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-015-0400-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-015-0400-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,25]],"date-time":"2019-08-25T07:57:59Z","timestamp":1566719879000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-015-0400-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,5,23]]},"references-count":26,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2015,10]]}},"alternative-id":["400"],"URL":"https:\/\/doi.org\/10.1007\/s00291-015-0400-4","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,5,23]]}}}