{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,4]],"date-time":"2026-08-04T03:29:39Z","timestamp":1785814179536,"version":"3.56.0"},"reference-count":39,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2015,5,8]],"date-time":"2015-05-08T00:00:00Z","timestamp":1431043200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2015,10]]},"DOI":"10.1007\/s00291-015-0401-3","type":"journal-article","created":{"date-parts":[[2015,5,7]],"date-time":"2015-05-07T13:18:30Z","timestamp":1431004710000},"page":"951-982","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":24,"title":["Revenue management approach to due date quoting and scheduling in an assemble-to-order production system"],"prefix":"10.1007","volume":"37","author":[{"given":"Hendrik","family":"Guhlich","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Moritz","family":"Fleischmann","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Raik","family":"Stolletz","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2015,5,8]]},"reference":[{"issue":"4","key":"401_CR1","doi-asserted-by":"crossref","first-page":"647","DOI":"10.1287\/opre.1060.0368","volume":"55","author":"D Adelman","year":"2007","unstructured":"Adelman D (2007) Dynamic bid prices in revenue management. Oper Res 55(4):647\u2013661","journal-title":"Oper Res"},{"key":"401_CR2","doi-asserted-by":"crossref","first-page":"839","DOI":"10.1002\/(SICI)1520-6750(199609)43:6<839::AID-NAV4>3.0.CO;2-5","volume":"43","author":"N Agrawal","year":"1996","unstructured":"Agrawal N, Smith S (1996) Estimating negative binomial demand for retail inventory management with unobservable lost sales. Nav Res Logist 43:839\u2013861","journal-title":"Nav Res Logist"},{"issue":"2","key":"401_CR3","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1111\/j.1540-5414.2005.00074.x","volume":"36","author":"M Barut","year":"2005","unstructured":"Barut M, Sridharan V (2005) Revenue management in order-driven production systems. Decis Sci 36(2):287\u2013317","journal-title":"Decis Sci"},{"issue":"12","key":"401_CR4","doi-asserted-by":"crossref","first-page":"1896","DOI":"10.1287\/mnsc.1060.0588","volume":"52","author":"S Benjaafar","year":"2006","unstructured":"Benjaafar S, ElHafsi M (2006) Production and inventory control of a single product assemble-to-order system with multiple customer classes. Manag Sci 52(12):1896\u20131912","journal-title":"Manag Sci"},{"issue":"5","key":"401_CR5","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1287\/inte.30.4.65.11650","volume":"10","author":"A Brown","year":"2000","unstructured":"Brown A, Lee H, Petrakian R (2000) Xilinx improves its semiconductor supply chain using product and process postponement. Interfaces 10(5):65\u201380","journal-title":"Interfaces"},{"issue":"1","key":"401_CR6","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/j.ejor.2004.07.062","volume":"171","author":"K Charnsirisakskul","year":"2006","unstructured":"Charnsirisakskul K, Griffin PM, Keskinocak P (2006) Pricing and scheduling decisions with leadtime flexibility. Eur J Oper Res 171(1):153\u2013169","journal-title":"Eur J Oper Res"},{"key":"401_CR7","doi-asserted-by":"crossref","first-page":"477","DOI":"10.1023\/A:1012837207691","volume":"3","author":"C Chen","year":"2001","unstructured":"Chen C, Zhao Z, Ball M (2001) Quantity and due date quoting available to promise. Inf Syst Front 3:477\u2013488","journal-title":"Inf Syst Front"},{"key":"401_CR8","doi-asserted-by":"crossref","unstructured":"Chen CY, Zhao Z, Ball MO (2002) A model for batch advanced available-to-promise. Prod Oper Manag 11(4):424\u2013440","DOI":"10.1111\/j.1937-5956.2002.tb00470.x"},{"issue":"2","key":"401_CR9","doi-asserted-by":"crossref","first-page":"604","DOI":"10.1016\/j.ijpe.2011.02.005","volume":"131","author":"T Cheng","year":"2011","unstructured":"Cheng T, Gao C, Shen H (2011) Production planning and inventory allocation of a single-product assemble-to-order system with failure-prone machines. Int J Prod Econ 131(2):604\u2013617","journal-title":"Int J Prod Econ"},{"issue":"1","key":"401_CR10","doi-asserted-by":"crossref","first-page":"26","DOI":"10.2307\/2985810","volume":"8","author":"ASC Ehrenberg","year":"1959","unstructured":"Ehrenberg ASC (1959) The pattern of consumer purchases. Appl Stat 8(1):26\u201341","journal-title":"Appl Stat"},{"issue":"1","key":"401_CR11","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1016\/j.ejor.2007.12.007","volume":"194","author":"M ElHafsi","year":"2009","unstructured":"ElHafsi M (2009) Optimal integrated production and inventory control of an assemble-to-order system with multiple non-unitary demand classes. Eur J Oper Res 194(1):127\u2013142","journal-title":"Eur J Oper Res"},{"issue":"4","key":"401_CR12","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1287\/msom.1040.0054","volume":"6","author":"G Gallego","year":"2004","unstructured":"Gallego G, Phillips R (2004) Revenue management of flexible products. Manuf Serv Oper Manag 6(4):321\u2013337","journal-title":"Manuf Serv Oper Manag"},{"key":"401_CR13","doi-asserted-by":"crossref","unstructured":"Gallego G, Iyengar G, Phillips R, Dubey A (2004) Managing flexible products on a network. Tech. Rep. TR-2004-01, Columbia University","DOI":"10.2139\/ssrn.3567371"},{"key":"401_CR14","unstructured":"Gallien J, Tallec YL, Schoenmeyr T (2004) A model for make-to-order revenue management. Working paper, MIT, Cambridge"},{"issue":"4","key":"401_CR15","doi-asserted-by":"crossref","first-page":"770","DOI":"10.1287\/mnsc.1110.1442","volume":"58","author":"L Gao","year":"2012","unstructured":"Gao L, Xu SH, Ball MO (2012) Managing an available-to-promise assembly system with dynamic short-term pseudo-order forecast. Manag Sci 58(4):770\u2013790","journal-title":"Manag Sci"},{"key":"401_CR16","doi-asserted-by":"crossref","first-page":"280","DOI":"10.1016\/j.ijpe.2014.03.010","volume":"153","author":"J G\u00f6nsch","year":"2014","unstructured":"G\u00f6nsch J, Koch S, Steinhardt C (2014) Revenue management with flexible products: the value of flexibility and its incorporation into DLP-based approaches. Int J Prod Econ 153:280\u2013294","journal-title":"Int J Prod Econ"},{"issue":"4","key":"401_CR17","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1016\/0272-6963(95)00029-1","volume":"13","author":"Fd Harris","year":"1995","unstructured":"Harris Fd, Pinder J (1995) A revenue management approach to demand management and order booking in assemble-to-order manufacturing. J Oper Manag 13(4):299\u2013309","journal-title":"J Oper Manag"},{"issue":"2","key":"401_CR18","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1007\/BF03342721","volume":"3","author":"A Hintsches","year":"2010","unstructured":"Hintsches A, Spengler T, Volling T (2010) Revenue management in make-to-order manufacturing: case study of capacity control at ThyssenKrupp VDM. Bus Res 3(2):173\u2013190","journal-title":"Bus Res"},{"issue":"1","key":"401_CR19","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1007\/s00291-006-0043-6","volume":"29","author":"R Klein","year":"2007","unstructured":"Klein R (2007) Network capacity control using self-adjusting bid-prices. OR Spectr 29(1):39\u201360","journal-title":"OR Spectr"},{"key":"401_CR20","unstructured":"Kniker T, Burman M (2001) Applications of revenue management to manufacturing. In: Third International Conference on Design and Analysis of Manufacturing Systems, pp 299\u2013308"},{"key":"401_CR21","doi-asserted-by":"crossref","unstructured":"Kolisch R (2001) Make-to-order assembly management. Springer, Berlin","DOI":"10.1007\/978-3-662-04514-5"},{"issue":"1","key":"401_CR22","first-page":"137","volume":"29","author":"H Kuhn","year":"2005","unstructured":"Kuhn H, Defregger F (2005) Revenue management for a make-to-order company with limited inventory capacity. OR Spectr 29(1):137\u2013156","journal-title":"OR Spectr"},{"issue":"4","key":"401_CR23","doi-asserted-by":"crossref","first-page":"720","DOI":"10.1016\/j.cie.2010.07.026","volume":"59","author":"JT Lin","year":"2010","unstructured":"Lin JT, Hong IH, Wu CH, Wang KS (2010) A model for batch available-to-promise in order fulfillment processes for TFT-LCD production chains. Comput Ind Eng 59(4):720\u2013729","journal-title":"Comput Ind Eng"},{"key":"401_CR24","unstructured":"Liu T (2005) Revenue management models in the manufacturing industry. Ph.D. thesis, MIT"},{"issue":"1","key":"401_CR25","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1007\/s00291-008-0123-x","volume":"31","author":"H Meyr","year":"2009","unstructured":"Meyr H (2009) Customer segmentation, allocation planning and order promising in make-to-stock production. OR Spectr 31(1):229\u2013256","journal-title":"OR Spectr"},{"issue":"11","key":"401_CR26","doi-asserted-by":"crossref","first-page":"2027","DOI":"10.1016\/j.cor.2010.02.003","volume":"37","author":"A Petrick","year":"2010","unstructured":"Petrick A, G\u00f6nsch J, Steinhardt C, Klein R (2010) Dynamic control mechanisms for revenue management with flexible products. Comput Oper Res 37(11):2027\u20132039","journal-title":"Comput Oper Res"},{"issue":"1","key":"401_CR27","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1007\/s00291-009-0188-1","volume":"34","author":"A Petrick","year":"2012","unstructured":"Petrick A, Steinhardt C, G\u00f6nsch J, Klein R (2012) Using flexible products to cope with demand uncertainty in revenue management. OR Spectr 34(1):215\u2013242","journal-title":"OR Spectr"},{"key":"401_CR28","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1016\/j.ijpe.2004.06.023","volume":"93\u201394","author":"R Pibernik","year":"2005","unstructured":"Pibernik R (2005) Advanced available-to-promise: classification, selected methods and requirements for operations and inventory management. Int J Prod Econ 93\u201394:239\u2013252","journal-title":"Int J Prod Econ"},{"key":"401_CR29","unstructured":"Quante R, Fleischmann M, Meyr H (2009) A stochastic dynamic programming approach to revenue management in a make-to-stock production system. Erasmus University, Erasmus Research Institute of Management"},{"key":"401_CR30","unstructured":"Simpson RW (1989) Using network flow techniques to find shadow prices for market and seat inventory control. Tech. rep"},{"key":"401_CR31","doi-asserted-by":"crossref","first-page":"561","DOI":"10.1016\/S0927-0507(03)11011-0","volume":"11","author":"J Song","year":"2003","unstructured":"Song J, Zipkin P (2003) Supply chain operations: assemble-to-order systems. Handb Oper Res Manag Sci 11:561\u2013596","journal-title":"Handb Oper Res Manag Sci"},{"issue":"1","key":"401_CR32","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/s00291-005-0024-1","volume":"29","author":"T Spengler","year":"2007","unstructured":"Spengler T, Rehkopf S, Volling T (2007) Revenue management in make-to-order manufacturing\u2014an application to the iron and steel industry. OR Spectr 29(1):157\u2013171","journal-title":"OR Spectr"},{"key":"401_CR33","first-page":"125","volume":"4","author":"TS Spengler","year":"2008","unstructured":"Spengler TS, Volling T, Hintsches A (2008) Integration von Revenue Management Konzepten in die Auftragsannahme\u2014konkretisiert f\u00fcr Unternehmen der eisen- und stahlerzeugenden Industrie. ZFB Special Issue 4:125\u2013151","journal-title":"ZFB Special Issue"},{"key":"401_CR34","doi-asserted-by":"crossref","unstructured":"Talluri K, van Ryzin G (1999) A randomized linear programming method for computing network bid prices. Transp Sci 33(2):207\u2013216","DOI":"10.1287\/trsc.33.2.207"},{"key":"401_CR35","doi-asserted-by":"crossref","unstructured":"Talluri K, van Ryzin G (2004) The theory and practice of revenue management. Springer, New York","DOI":"10.1007\/b139000"},{"issue":"1","key":"401_CR36","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1016\/j.ijpe.2008.10.010","volume":"117","author":"Tsai Km","year":"2009","unstructured":"Km Tsai, Sc Wang (2009) Multi-site available-to-promise modeling for assemble-to-order manufacturing: an illustration on TFT-LCD manufacturing. Int J Prod Econ 117(1):174\u2013184","journal-title":"Int J Prod Econ"},{"issue":"5","key":"401_CR37","doi-asserted-by":"crossref","first-page":"1021","DOI":"10.1016\/j.cor.2011.06.012","volume":"39","author":"T Volling","year":"2012","unstructured":"Volling T, Eren Akyol D, Wittek K, Spengler TS (2012) A two-stage bid-price control for make-to-order revenue management. Comput Oper Res 39(5):1021\u20131032","journal-title":"Comput Oper Res"},{"key":"401_CR38","unstructured":"Williamson EL (1992) Airline network seat inventory control: Methodologies and revenue impacts. Ph.D. thesis, MIT, Cambridge"},{"key":"401_CR39","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1007\/s10479-005-6235-7","volume":"135","author":"Z Zhao","year":"2005","unstructured":"Zhao Z, Ball M, Kotake M (2005) Optimization-based available-to-promise with multi-stage resource availability. Ann Oper Res 135:65\u201385","journal-title":"Ann Oper Res"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-015-0401-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-015-0401-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-015-0401-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,9,1]],"date-time":"2020-09-01T22:45:59Z","timestamp":1599000359000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-015-0401-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,5,8]]},"references-count":39,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2015,10]]}},"alternative-id":["401"],"URL":"https:\/\/doi.org\/10.1007\/s00291-015-0401-3","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,5,8]]}}}